Tender for AMC of DSPT in Srinagar (Gwl.) - Webline
Tender for AMC of DSPT in Srinagar (Gwl.) - Webline
Tender for AMC of DSPT in Srinagar (Gwl.) - Webline
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BHARAT SANCHAR NIGAM LIMITED<br />
(A Government <strong>of</strong> India Enterprises)<br />
O/O GENERAL MANAGER TELECOM DISTRICT, SRINAGAR (GARHWAL)<br />
(UTTARAKHAND) – 246174<br />
NIT- No:- W-202/<strong>Tender</strong>/<strong>AMC</strong>-<strong>DSPT</strong>/2012- 13/ Dated at SG, 14 th Feb. 2013<br />
NAME OF WORK:<br />
TENDER FOR <strong>AMC</strong><br />
OF<br />
<strong>DSPT</strong> IN SRINAGAR (GARHWAL) SSA<br />
Period <strong>of</strong> issue <strong>of</strong> tender document:<br />
11:00 Hrs. to 16:00 Hrs on all work<strong>in</strong>g days from<br />
Upto 12/03/2013<br />
Last date <strong>of</strong> Submission <strong>of</strong> <strong>Tender</strong> Document<br />
Up to 14:00 Hrs <strong>of</strong> 13/03/2013<br />
Dates <strong>of</strong> Bid open<strong>in</strong>g on<br />
13/03/2013 at 15:00 Hrs.<br />
www.uttaranchal.bsnl.co.<strong>in</strong><br />
Cost <strong>of</strong> <strong>Tender</strong> Document: Rs. 568/-<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
CONTENT<br />
SECTION TOPIC PAGE NO.<br />
SECTION I NOTICE INVITING TENDER …….…3-4<br />
SECTION II INSTRUCTION TO BIDDERS ……….5-15<br />
A. INTRODUCTION.<br />
B. THE BID DOCUMENT.<br />
C. PREPARATION OF BIDS.<br />
D. SUBMISSION OF BIDS.<br />
E. BID OPENING & EVALUATION.<br />
F. AWARD OF CONTRACT.<br />
SECTION III CONDITION OF CONTRACT ……… 16-19<br />
SECTION-IV SCOPE OF WORK & Agreement ……….20 to 28<br />
SECTION V BID FORM ……….29<br />
SECTION VI TECHNICAL BID ……….30<br />
SECTION VII FINANCIAL BID (RATE SHEET) ……… 31<br />
SECTION VIII UNDERTAKING & DECLARTION ….……32<br />
SECTION IX PERFORMANCE SECURITY GURARANTEE (BOND FORM) ………33-34<br />
SECTION X LETTER OF AUTHORISATION TO ATTEND BID OPENING ………35<br />
SECTION XI BID SECURITY FORM ............36<br />
SECTION XII PROFORMA FOR NO NEAR RELATIVE(S)<br />
CERTIFICATE WORKING IN BSNL …..…. 37<br />
SECTION XIII INFORMATION ABOUT TENDERER ………38<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
Section - 1<br />
BHARAT SANCHAR NIGAM LIMITED<br />
(A Government <strong>of</strong> India Enterprises)<br />
O/O GENERAL MANAGER TELECOM DISTRICT, SRINAGAR (GARHWAL)<br />
(UTTARAKHAND) – 246174<br />
No:- W-202/<strong>Tender</strong>/<strong>AMC</strong>-<strong>DSPT</strong>/2012- 13/ Dated at SG, 14 th Feb. 2013<br />
NOTICE INVITING TENDER<br />
Sealed tenders (Pack<strong>in</strong>g PVC Tape/Seal<strong>in</strong>g Wax) are <strong>in</strong>vited from the bonafide, experienced contractors<br />
<strong>for</strong> and on behalf <strong>of</strong> BSNL by the O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) <strong>for</strong> <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s <strong>in</strong> Sr<strong>in</strong>agar (<strong>Gwl</strong>.) SSA as<br />
per the detail given below.<br />
S.<br />
N.<br />
1.<br />
2.<br />
3.<br />
Zone<br />
Zone –I (Pauri, Sr<strong>in</strong>agar (Ph.) & Sr<strong>in</strong>agar<br />
(Grp.) Sub Division<br />
Zone –II (Lansdowne & Kotdwar Sub<br />
Division)<br />
Zone –III (Gopeshwar, Karanprayag,<br />
Joshimath & Rudraprayag Sub Division)<br />
Qty. <strong>of</strong><br />
Work<br />
291<br />
Nos.<br />
169<br />
Nos.<br />
108<br />
Nos.<br />
Estimated<br />
Cost<br />
Earnest<br />
Money<br />
<strong>Tender</strong><br />
Cost<br />
Period<br />
Rs. 14,84,100/- Rs. 37,103/- Rs. 568/- One year<br />
Rs. 8,61,900/- Rs. 21,548/- Rs. 568/- One year<br />
Rs. 5,50,800/- Rs. 13,770/- Rs. 568/- One year<br />
1- Bid document can be : SDE (MM) O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
obta<strong>in</strong>ed from<br />
(Separate bid document is to be obta<strong>in</strong>/downloaded <strong>for</strong> each zone)<br />
2- Cost <strong>of</strong> <strong>Tender</strong> Document : Rs. 568/- (Rupees Five Hundred Sixty Eight Only)<br />
3- Mode <strong>of</strong> deposit : A/c Payee Demand Draft / Banker’s Cheque, on any scheduled bank payable at<br />
Sr<strong>in</strong>agar (<strong>Gwl</strong>.) <strong>in</strong> favour <strong>of</strong> A.O. (Cash), O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) which<br />
must not be prepared be<strong>for</strong>e the date <strong>of</strong> publication <strong>of</strong> NIT.<br />
4- Sale <strong>of</strong> <strong>Tender</strong> Document : On all work<strong>in</strong>g days between 11:00 Hrs. to 16:00 Hrs. upto 12/03/2013<br />
5- Dropp<strong>in</strong>g <strong>of</strong> tender<br />
document<br />
6- Dates & Time <strong>of</strong> Bid<br />
Open<strong>in</strong>g<br />
: Upto 14.00 Hrs. <strong>of</strong> 13/03/2013 at AGM (CFA) O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
: 13/03/2013 at 15:00 Hrs.<br />
In case the date is declared as a holiday the open<strong>in</strong>g will automatically shifted to<br />
next work<strong>in</strong>g day at the scheduled time and any change <strong>in</strong> bid open<strong>in</strong>g dates due<br />
to any other unavoidable reason, the same will be <strong>in</strong>timated <strong>in</strong> due course.<br />
7- Place <strong>of</strong> open<strong>in</strong>g <strong>of</strong> bid : In the chamber <strong>of</strong> AGM (CFA) O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
8- Bid Security or EMD : The bidder has to furnish the bid security or EMD <strong>in</strong> <strong>for</strong>m <strong>of</strong> A/c Payee<br />
Demand Draft on any scheduled bank payable at Sr<strong>in</strong>agar (<strong>Gwl</strong>.) <strong>in</strong> favour <strong>of</strong><br />
A.O. (cash), O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) which must not be drawn be<strong>for</strong>e the<br />
date <strong>of</strong> publication <strong>of</strong> NIT.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
9- Eligibility Criteria : The bidder must be hav<strong>in</strong>g the follow<strong>in</strong>g eligibility criteria:<br />
(a) EMD<br />
(b) Should have experience <strong>of</strong> survey <strong>in</strong>stallation & commission<strong>in</strong>g /<strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s or<br />
any Satellite Equipment <strong>for</strong> any telecom operator <strong>in</strong> BSNL/MTNL/DOT/Central/State<br />
PSU <strong>for</strong> 25% <strong>of</strong> the tender amount <strong>for</strong> the zone concerned. A certificate to this effect<br />
issued by the company may be furnished along with the copies <strong>of</strong> such work orders<br />
(c) The bidder should submit an undertak<strong>in</strong>g to the effect that none <strong>of</strong> their relatives are<br />
work<strong>in</strong>g <strong>in</strong> BSNL as per the <strong>for</strong>mat <strong>in</strong> Section-XII.<br />
(d) The bidder should have authenticated partnership deed, <strong>in</strong> case <strong>of</strong> partnership firm<br />
and power <strong>of</strong> attorney to the representative <strong>of</strong> the firm to operate the tender.<br />
(e) Copy <strong>of</strong> PAN card or latest <strong>in</strong>come tax return.<br />
(f) Average annual f<strong>in</strong>ancial turn over dur<strong>in</strong>g FY 2009-10 to 2011-12 should be at least<br />
<strong>for</strong> 25% <strong>of</strong> estimated cost.<br />
(f) Valid Service Tax Registration Certificate<br />
(h) Cost <strong>of</strong> <strong>Tender</strong> document <strong>in</strong> case the same is down loaded from the website.<br />
10- Rejection <strong>of</strong> <strong>Tender</strong> : Incomplete, ambiguous, Conditional rate, unsealed, late receipt tenders are<br />
liable to be rejected<br />
The no. <strong>of</strong> sites may very accord<strong>in</strong>g to BSNL’s requirement to the extent <strong>of</strong> +/- 25%. The undersigned<br />
reserves the right to cancel/reject any or all tenders without assign<strong>in</strong>g any reason there<strong>of</strong> or is not bound<br />
to accept the lowest tender. For further details, please visit www.uttaranchal.bsnl.co.<strong>in</strong><br />
Note:- Improper sealed document will not be accepted and liable to reject.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION- II<br />
INSTRUCTIONS TO BIDDERS<br />
A. INTRODUCTION<br />
1. DEFINITIONS :<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
“The <strong>Tender</strong><strong>in</strong>g authority” means O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
“The Bidder” means the <strong>in</strong>dividual or firm participat<strong>in</strong>g <strong>in</strong> this tender & submits its bid.<br />
“The contractor” means the <strong>in</strong>dividual or firm execut<strong>in</strong>g the work order under the Contract.<br />
“The Work Order” means the order placed by the <strong>Tender</strong><strong>in</strong>g authority <strong>in</strong>clud<strong>in</strong>g all<br />
attachments and appendices thereto and all documents <strong>in</strong>corporated by reference there<strong>in</strong> on the<br />
contractor. The work order shall be deemed as “Contract” appear<strong>in</strong>g <strong>in</strong> the document.<br />
“The Contract Price” means the price payable to the contractor under the work order <strong>for</strong> the<br />
full and proper per<strong>for</strong>mance <strong>of</strong> its contractual obligations.<br />
2. ELIGIBLE BIDDERS :<br />
i) The bidder should have experience <strong>of</strong> successfully complet<strong>in</strong>g survey “<strong>in</strong>stallation &<br />
commission<strong>in</strong>g’’ /<strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong> OR any Satellite Equipment <strong>for</strong> any telecom operator <strong>in</strong><br />
BSNL/MTNL/DOT/Central/State PSU <strong>for</strong> 25% <strong>of</strong> the tender amount <strong>for</strong> the zone concerned. A<br />
certificate to this effect issued by the company may be furnished along with the copies <strong>of</strong> such<br />
work orders.<br />
ii)<br />
iii)<br />
iv)<br />
The bidder should submit an undertak<strong>in</strong>g to the effect that none <strong>of</strong> their relatives are work<strong>in</strong>g <strong>in</strong><br />
BSNL as per the <strong>for</strong>mat <strong>in</strong> Section-XII.<br />
The bidder should have authenticated partnership deed, <strong>in</strong> case <strong>of</strong> partnership firm and power <strong>of</strong><br />
attorney to the representative <strong>of</strong> the firm to operate the tender.<br />
Copy <strong>of</strong> PAN card or latest <strong>in</strong>come tax return.<br />
v) Average annual f<strong>in</strong>ancial turn over dur<strong>in</strong>g FY 2009-10 to 2011-12 should be at least <strong>for</strong> 25% <strong>of</strong><br />
estimated cost.<br />
vi)<br />
vii)<br />
Valid Service Tax Registration Certificate.<br />
The bidder should have to pay the cost <strong>of</strong> tender document and EMD as per NIT <strong>in</strong> favour <strong>of</strong><br />
A.O. (cash), O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) <strong>in</strong> shape <strong>of</strong> A/c Payee Demand Draft / Banker’s<br />
Cheque payable at Sr<strong>in</strong>agar (<strong>Gwl</strong>.).<br />
3. COST OF BIDDING :<br />
The bidder shall bear all costs associated with the preparation and submission <strong>of</strong> the bid. The<br />
tender<strong>in</strong>g authority will <strong>in</strong> no case be responsible or liable <strong>for</strong> these costs, regardless <strong>of</strong> the<br />
conduct or outcome <strong>of</strong> the bidd<strong>in</strong>g process.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
B. THE BID DOCUMENTS:<br />
4. BID DOCUMENTS :<br />
4.1 The works required, bidd<strong>in</strong>g procedures and contract terms are prescribed <strong>in</strong> the bid documents.<br />
The bid documents <strong>in</strong>clude:<br />
a) Notice Invit<strong>in</strong>g <strong>Tender</strong>.<br />
b) Instruction to Bidders.<br />
c) Conditions <strong>of</strong> the Contract.<br />
d) Construction, Specification and Job description.<br />
e) Bid <strong>for</strong>m.<br />
f) Technical Bid<br />
g) F<strong>in</strong>ancial Bid (Rate Sheet)<br />
h) Undertak<strong>in</strong>g and declaration.<br />
i) Per<strong>for</strong>mance Security Bond Form.<br />
j) Letter <strong>of</strong> authorization to attend Bid open<strong>in</strong>g.<br />
k) Undertak<strong>in</strong>g <strong>in</strong> respect <strong>of</strong> non-work<strong>in</strong>g <strong>of</strong> relatives <strong>in</strong> BSNL.<br />
l) In<strong>for</strong>mation about <strong>Tender</strong>ers.<br />
4.2 The bidder is expected to exam<strong>in</strong>e all <strong>in</strong>structions, <strong>for</strong>ms, terms and specifications <strong>in</strong> the bid<br />
documents. Failure to furnish all <strong>in</strong><strong>for</strong>mation required as per the bid documents or<br />
submission <strong>of</strong> bids not substantially responsive to the bid documents <strong>in</strong> every respect will<br />
be at the bidder’s risk and shall result <strong>in</strong> rejection <strong>of</strong> the bid.<br />
5 CLARIFICATION OF BID DOCUMENTS :<br />
5.1 A prospective bidder, requir<strong>in</strong>g any clarification <strong>of</strong> the bid documents shall notify the tender<strong>in</strong>g<br />
authority <strong>in</strong> writ<strong>in</strong>g or FAX at the tender<strong>in</strong>g authority’s mail<strong>in</strong>g address <strong>in</strong>dicated <strong>in</strong> the<br />
<strong>in</strong>vitation <strong>for</strong> bids. The tender<strong>in</strong>g authority shall respond <strong>in</strong> writ<strong>in</strong>g to any request <strong>for</strong><br />
clarification <strong>of</strong> the bid documents, which it receives not later than 10(Ten) days prior to the<br />
last date <strong>for</strong> the submission <strong>of</strong> bids. Copies <strong>of</strong> the query (without identify<strong>in</strong>g the source) and<br />
clarifications by the tender<strong>in</strong>g authority shall be sent <strong>in</strong>dividually to all the prospective bidders<br />
who have received the bid documents. Bidder download<strong>in</strong>g the tender document from BSNL<br />
website will <strong>in</strong>timate to tender<strong>in</strong>g authority his mail<strong>in</strong>g address, FAX No so that any clarification<br />
may be <strong>in</strong>timated to all prospective bidder.<br />
5.2 Any clarification issued by BSNL <strong>in</strong> response to query raised by prospective bidders shall <strong>for</strong>m<br />
an <strong>in</strong>tegral part <strong>of</strong> bid documents and it may amount an amendment <strong>of</strong> relevant clauses <strong>of</strong> the bid<br />
document.<br />
5.3 The correction/modification, if any, <strong>in</strong> the tender document will be uploaded <strong>in</strong> the website i.e.<br />
www.uttaranchal.bsnl.co.<strong>in</strong><br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
6. AMENDMENT OF BID DOCUMENTS :<br />
6.1 At any time, prior to the date <strong>for</strong> submission <strong>of</strong> bids, the tender<strong>in</strong>g authority may, <strong>for</strong> any reason<br />
whether at its own <strong>in</strong>itiative or <strong>in</strong> response to a clarification requested by a prospective Bidder,<br />
modify the bid documents by amendments.<br />
6.2 The amendments shall be notified <strong>in</strong> writ<strong>in</strong>g or by FAX or at our website as the case may be to<br />
all prospective bidders on the address <strong>in</strong>timated at the time <strong>of</strong> purchase <strong>of</strong> bid document from the<br />
tender<strong>in</strong>g authority and these amendments will be b<strong>in</strong>d<strong>in</strong>g on them.<br />
6.3 In order to af<strong>for</strong>d prospective bidders reasonable time to take the amendments <strong>in</strong>to account <strong>in</strong><br />
prepar<strong>in</strong>g their bids, the <strong>Tender</strong><strong>in</strong>g authority may, at its discretion, extend the deadl<strong>in</strong>e <strong>for</strong> the<br />
submission <strong>of</strong> bids suitably.<br />
C. PREPARATION OF BIDS:<br />
7. DOCUMENTS COMPRISING THE BID:<br />
It is a two-bid system and the bid prepared by the bidder shall comprise the follow<strong>in</strong>g components:<br />
i) TECHNICAL BID:<br />
Technical bid shall comprise the follow<strong>in</strong>g components:<br />
a) Documentary evidence established <strong>in</strong> accordance with Clause 2 and 10 <strong>of</strong> Section-II that the<br />
bidder is eligible to bid and is qualified to per<strong>for</strong>m the contract if his bid is accepted.<br />
b) Bid <strong>for</strong>m (Sec-V) completed <strong>in</strong> accordance with Clause 8 <strong>of</strong> Section-II.<br />
c) Bid Security furnished <strong>in</strong> accordance with Clause 11.<br />
ii) FINANCIAL BID:<br />
F<strong>in</strong>ancial bid shall comprise the completed “PRICE SCHEDULE” (Section-VII) <strong>in</strong> accordance<br />
with Clause-9.<br />
8. BID FORM :<br />
The bidder shall complete the Bid Form and the appropriate Price schedule furnished <strong>in</strong> the Bid<br />
Documents, <strong>in</strong>dicat<strong>in</strong>g the works to be done, a brief description <strong>of</strong> the works and prices are as per<br />
Section-V & VII respectively.<br />
9. BID PRICES :<br />
9.1 The bidder shall give the total composite price <strong>in</strong>clusive <strong>of</strong> all levies & taxes i.e. Sales Tax and<br />
Excise, pack<strong>in</strong>g, <strong>for</strong>ward<strong>in</strong>g, freight and <strong>in</strong>surance charges etc but exclusive <strong>of</strong> Service Tax if<br />
any. Service Tax, if any, should be shown separately, shall be paid as applicable. The basic unit<br />
price & other component price need to be <strong>in</strong>dividually <strong>in</strong>dicated aga<strong>in</strong>st the works under the<br />
contract as per price schedule given <strong>in</strong> Section VII. The <strong>of</strong>fer shall be firm <strong>in</strong> Indian Rupees.<br />
Bidders shall have to quote price(s) aga<strong>in</strong>st all the items, <strong>for</strong> tenders where numbers <strong>of</strong> items are<br />
more than one.<br />
9.2 The prices quoted by the bidder shall rema<strong>in</strong> fixed dur<strong>in</strong>g the entire period <strong>of</strong> contract and shall<br />
not be subject to variation on any account. A bid submitted with an adjustable price quotation<br />
will be treated as non-responsive and rejected.<br />
9.3 In case <strong>of</strong> any discrepancies <strong>of</strong> quot<strong>in</strong>g rate <strong>in</strong> figures and words, the rate quoted <strong>in</strong> words, the<br />
rate quoted <strong>in</strong> words will be considered.<br />
9.4 Any erasures/corrections <strong>of</strong> price bid should be <strong>in</strong>itialed by the bidder with date.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
10. DOCUMENTS ESTABLISHING BIDDER’S ELIGIBLITY & QUALIFICATION:<br />
10.1 i) The bidder should have experience <strong>of</strong> successfully complet<strong>in</strong>g survey “<strong>in</strong>stallation &<br />
commission<strong>in</strong>g’’ /<strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong> OR any Satellite Equipment <strong>for</strong> any telecom operator <strong>in</strong><br />
BSNL/MTNL/DOT/Central/State PSU <strong>for</strong> 25% <strong>of</strong> the tender amount <strong>for</strong> the zone concerned. A<br />
certificate to this effect issued by the company may be furnished along with the copies <strong>of</strong> such<br />
work orders<br />
ii) The bidder should submit an undertak<strong>in</strong>g to the effect that none <strong>of</strong> their relatives are work<strong>in</strong>g<br />
<strong>in</strong> BSNL as per the <strong>for</strong>mat <strong>in</strong> Section-XII.<br />
iii) The bidder should have authenticated partnership deed, <strong>in</strong> case <strong>of</strong> partnership firm and power<br />
<strong>of</strong> attorney to the representative <strong>of</strong> the firm to operate the tender.<br />
iv) Copy <strong>of</strong> PAN card or latest <strong>in</strong>come tax return.<br />
v) Average annual f<strong>in</strong>ancial turn over dur<strong>in</strong>g FY 2009-10 to 2011-12 should be at least <strong>for</strong> 25%<br />
<strong>of</strong> estimated cost.<br />
vi) Valid Service Tax Registration Certificate.<br />
vii) The bidder should have to pay the cost <strong>of</strong> tender document and EMD as per NIT <strong>in</strong> favour <strong>of</strong><br />
A.O. (cash), O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) <strong>in</strong> shape <strong>of</strong> A/c Payee Demand Draft / Banker’s<br />
Cheque payable at Sr<strong>in</strong>agar (<strong>Gwl</strong>.).<br />
11. BID SECURITY:<br />
11.1 i) EMD shall be paid as mentioned <strong>in</strong> NIT should be submitted <strong>in</strong> the <strong>for</strong>m <strong>of</strong> an account payee<br />
Bank Draft/Banker Cheque drawn on any scheduled bank payable at Sr<strong>in</strong>agar (<strong>Gwl</strong>.) <strong>in</strong> favor <strong>of</strong><br />
Accounts Officer (cash), O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) along with the tender document. The<br />
EMD is required to protect the company aga<strong>in</strong>st the risk <strong>of</strong> bidder’s conduct, which would<br />
warrant the security <strong>for</strong>feiture.<br />
ii) A bid not secured as above shall be rejected by the accept<strong>in</strong>g authority as non-responsive.<br />
iii) The successful bidder’s EMD will be discharged upon the bidders acceptance <strong>of</strong> the LOI and<br />
furnish<strong>in</strong>g Bank Guarantee <strong>for</strong> an amount <strong>of</strong> 10% <strong>of</strong> the contract value with validity up to one<br />
and half years on request.<br />
iv) The EMD may be <strong>for</strong>feited if bidder withdraws his bid dur<strong>in</strong>g the period <strong>of</strong> bid validity fails,<br />
to sign the contract and furnish per<strong>for</strong>mance security.<br />
v) In case <strong>of</strong> (iv) above, the bidder will not be eligible to participate <strong>in</strong> the tender <strong>for</strong> same work<br />
<strong>for</strong> one year from the date <strong>of</strong> acceptance <strong>of</strong> LOI. The bidder will not approach the court aga<strong>in</strong>st<br />
the decision <strong>of</strong> GMTD, <strong>in</strong> this regard.<br />
vi) No <strong>in</strong>terest shall be allowed on the EMD to the Bidder.<br />
11.2 The bid security is required to protect the tender<strong>in</strong>g authority aga<strong>in</strong>st the risk <strong>of</strong> bidder’s conduct,<br />
which would warrant the security’s <strong>for</strong>feiture pursuant to clause 11.5.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
11.3 BID NOT SECURED IN ACCORDANCE WITH PARA 11.1(i) SHALL BE TREATED AS<br />
NON-RESPONSIVE AND SHALL BE REJECTED BY THE TENDERING AUTHORITY.<br />
11.4 The bid security <strong>of</strong> the unsuccessful bidder will be discharged/returned as promptly as possible<br />
as but not later than 30 days after the expiry <strong>of</strong> the period <strong>of</strong> bid validity prescribed by the<br />
<strong>Tender</strong><strong>in</strong>g authority.<br />
11.5 The bid security may be <strong>for</strong>feited:<br />
(a) If bidder withdraws his bid dur<strong>in</strong>g the period <strong>of</strong> bid validity specified by the bidder on the Bid<br />
Form, OR<br />
(b) In case <strong>of</strong> a successful bidder, if the bidder fails:<br />
i. To sign the contract.<br />
ii. To furnish per<strong>for</strong>mance security.<br />
12. PERIOD OF VALIDITY OF BIDS :<br />
12.1 Bid shall rema<strong>in</strong> valid <strong>for</strong> 150 days from the date <strong>of</strong> bid open<strong>in</strong>g prescribed by the <strong>Tender</strong><strong>in</strong>g<br />
authority, pursuant to Clause 18.1. A BID VALID FOR A SHORTER PERIOD SHALL BE<br />
REJECTED BY THE TENDERING AUTHORITY AS NON-RESPONSIVE.<br />
12.2 In exceptional circumstances, the <strong>Tender</strong><strong>in</strong>g authority may request the bidder’s consent <strong>for</strong> an<br />
extension to the period <strong>of</strong> bid validity. The request and the responses thereto shall be made <strong>in</strong><br />
writ<strong>in</strong>g. The bid security provided under Clause 11 shall also be suitably extended. The bidder<br />
may refuse the request without <strong>for</strong>feit<strong>in</strong>g his bid security. In such case(s), his/her bid shall be<br />
rejected without <strong>for</strong>feit<strong>in</strong>g the bid security. A bidder accept<strong>in</strong>g the request and grant<strong>in</strong>g extension<br />
will not be permitted to modify his bid.<br />
13. POWER OF ATTORNEY :<br />
i) a) The power <strong>of</strong> attorney should be submitted and executed on the non-judicial stamp paper <strong>of</strong><br />
appropriate value as prevail<strong>in</strong>g <strong>in</strong> the respective states (s) and the same be attested by a Notary<br />
Public or registered be<strong>for</strong>e Sub-Registrar <strong>of</strong> the sate(s) concerned.<br />
b) The power <strong>of</strong> Attorney be executed by a person who has been authorized by the Board <strong>of</strong><br />
Directors <strong>of</strong> the firm <strong>in</strong> this regard, on behalf <strong>of</strong> the Company / <strong>in</strong>stitution / body corporate.<br />
ii)<br />
FORMAT AND SIGNING OF BID:<br />
The bid shall conta<strong>in</strong> no <strong>in</strong>terl<strong>in</strong>eations, erasures or overwrit<strong>in</strong>g except as necessary to correct<br />
errors made by the bidder <strong>in</strong> which case such corrections shall be signed by the person(s) sign<strong>in</strong>g<br />
the bid with date.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
D. SUBMISSION OF BIDS:<br />
14. SEALING AND MARKING OF BIDS :<br />
14.1 The Bidders are specifically required to submit their <strong>of</strong>fers <strong>in</strong> three parts, each <strong>in</strong> different sealed<br />
envelopes duly marked as:-<br />
i) “Envelope-A: Conta<strong>in</strong><strong>in</strong>g (a) Bid Security & (b) Cost <strong>of</strong> Bid Document” (<strong>in</strong> case<br />
the tender document is downloaded from our website).<br />
ii) “Envelope-B: Technical Bid”<br />
iii) “Envelope-C: F<strong>in</strong>ancial/ Price Bid”<br />
All the above three envelopes (A, B & C) should be submitted <strong>in</strong> a large cover.<br />
14.2 Above three covers are to be properly sealed (pack<strong>in</strong>g PVC tape/seal<strong>in</strong>g wax) and marked with<br />
PERSONAL SEAL. All the three covers (A, B & C) shall be kept <strong>in</strong> one outer cover which will<br />
also be properly sealed as mentioned above.<br />
14.3 If the envelopes are not properly sealed and marked as required above, the bid is subjected <strong>for</strong><br />
rejection <strong>in</strong> tender open<strong>in</strong>g stage itself.<br />
14.4 Envelope-A should conta<strong>in</strong> (i) Bid Security as per clause-11 & (ii) Cost <strong>of</strong> Bid Document (if the<br />
tender document is downloaded from website)<br />
14.5 Envelope-B should conta<strong>in</strong> all the Technical bid along with related document establish<strong>in</strong>g<br />
bidders eligibility as per clause-10<br />
14.6 Envelope-C should conta<strong>in</strong> F<strong>in</strong>ancial/ Price Bid i.e. the rates duly quoted by the bidder <strong>in</strong> the<br />
prescribed <strong>for</strong>mat (Section-VII “F<strong>in</strong>ancial Bid”).<br />
14.7 If any <strong>of</strong> the document required to be submitted <strong>in</strong> envelope A is found to be want<strong>in</strong>g, the<br />
concerned bid shall be rejected at the open<strong>in</strong>g stage itself and the rema<strong>in</strong><strong>in</strong>g envelopes B & C<br />
will not be opened.<br />
14.8 The envelopes should be addressed to the follow<strong>in</strong>g address:<br />
(a) The AGM (CFA)<br />
O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
(b) On the envelop cover mention the Item Name, the tender number and the words ‘DO NOT<br />
OPEN BEFORE’ (due date and scheduled open<strong>in</strong>g time), and<br />
(c) Shall <strong>in</strong>dicate the name and address <strong>of</strong> the bidder to enable the bid to be returned unopened <strong>in</strong><br />
case it is declared ‘late’.<br />
14.8.1 Bids shall either be sent by registered post or delivered <strong>in</strong> person. The responsibility <strong>for</strong> ensur<strong>in</strong>g<br />
that Bids are delivered <strong>in</strong> time would vest with the bidder.<br />
14.8.2 Bids delivered <strong>in</strong> person shall be delivered to above <strong>in</strong>dicated address on or be<strong>for</strong>e the time<br />
hours <strong>of</strong> due date. The <strong>Tender</strong><strong>in</strong>g authority shall not be responsible if the bids are delivered<br />
elsewhere.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
15. SUBMISSION OF BIDS :<br />
15.1 Bids (Envelopes A, B and C, all enclosed <strong>in</strong> another large envelope ) must be received by the<br />
<strong>Tender</strong><strong>in</strong>g authority at the address specified under clause 14.8(a) not later than the time as<br />
specified <strong>in</strong> NIT.<br />
15.2 The <strong>Tender</strong><strong>in</strong>g authority may, at its discretion, extend this deadl<strong>in</strong>e <strong>for</strong> the submission <strong>of</strong> bids by<br />
amend<strong>in</strong>g the Bid Documents <strong>in</strong> accordance with Clause 6 <strong>in</strong> which case all rights and<br />
obligations <strong>of</strong> the <strong>Tender</strong><strong>in</strong>g authority and bidders previously subject to the deadl<strong>in</strong>e will<br />
thereafter be subject to the deadl<strong>in</strong>e as extended.<br />
15.3 The bidder shall submit his bid <strong>of</strong>fer aga<strong>in</strong>st a set <strong>of</strong> bid documents purchased by him <strong>for</strong> all or<br />
some systems/equipment as per requirement <strong>of</strong> the Bid Documents. He may <strong>in</strong>clude alternate<br />
<strong>of</strong>fer if permissible as per the bid. However not more than one <strong>in</strong>dependent and complete <strong>of</strong>fer<br />
shall be permitted from the bidder.<br />
16. LATE BIDS :<br />
Any bid received by the tender<strong>in</strong>g authority after the deadl<strong>in</strong>e <strong>for</strong> submission <strong>of</strong> bids prescribed<br />
by the tender<strong>in</strong>g authority, shall be rejected and returned unopened to the bidder.<br />
17. MODIFICATION AND WITH DRAWAL OF BIDS :<br />
17.1 The bidder may modify or withdraw his bid after submission provided that the written notice <strong>of</strong><br />
the modification or withdrawal is received by the tender<strong>in</strong>g authority prior to the deadl<strong>in</strong>e<br />
prescribed <strong>for</strong> submission <strong>of</strong> bids.<br />
17.2 The bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched<br />
as required <strong>in</strong> the case <strong>of</strong> bid submission <strong>in</strong> accordance with the provision <strong>of</strong> clause 14.A<br />
withdrawal notice may also be sent by FAX but followed by a signed confirmation copy, post<br />
marked not later than the deadl<strong>in</strong>e <strong>for</strong> submission <strong>of</strong> bids.<br />
17.3 Subject to clause 19, no bid shall be modified subsequent to the deadl<strong>in</strong>e <strong>for</strong> submission <strong>of</strong> bids.<br />
E. BID OPENING AND EVALUATION :<br />
18. OPENING OF BIDS BY TENDERING AUTHORITY<br />
18.1<br />
i. Bids shall be opened by the tender<strong>in</strong>g authority <strong>in</strong> the presence <strong>of</strong> bidders or their authorized<br />
representatives who choose to attend, at specified time and date. The bidder’s representatives,<br />
who are present, shall sign an attendance register/<strong>Tender</strong> open<strong>in</strong>g Register. Authority letter shall<br />
be submitted by the bidder be<strong>for</strong>e they are allowed to participate <strong>in</strong> bid open<strong>in</strong>g (The <strong>for</strong>mat as<br />
given <strong>in</strong> Section-X <strong>of</strong> the Bid Document).<br />
ii. The <strong>Tender</strong><strong>in</strong>g authority will first ensure the availability <strong>of</strong> Bid Security and cost <strong>of</strong> tender<br />
document (if downloaded from website) <strong>in</strong> envelope ‘A’, if any <strong>of</strong> these are not available the<br />
rema<strong>in</strong><strong>in</strong>g “B&C” envelopes will not be opened and the bid will be rejected at that stage itself.<br />
iii. The <strong>Tender</strong><strong>in</strong>g authority shall then open the technical bid conta<strong>in</strong>ed <strong>in</strong> envelope-B and check the<br />
availability <strong>of</strong> all the documents as per clause 10.1. Dur<strong>in</strong>g this open<strong>in</strong>g <strong>of</strong> technical bids,<br />
<strong>Tender</strong><strong>in</strong>g authority shall check availability <strong>of</strong> required document <strong>in</strong> general. Evaluation <strong>of</strong> the<br />
technical bids <strong>in</strong> details shall be done by the <strong>Tender</strong><strong>in</strong>g authority on a later date be<strong>for</strong>e open<strong>in</strong>g<br />
<strong>of</strong> the f<strong>in</strong>ancial/price bid.<br />
iv. For technically responsive bids the F<strong>in</strong>ancial/ Price bids (Envelope-C) will be opened on the<br />
due date and time.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
18.2 Only one representative <strong>for</strong> any bidder shall be authorized and permitted to attend the bid<br />
open<strong>in</strong>g.<br />
18.3 The Bidder’s names, Bid prices, Modifications, bid withdrawals and such other details as the<br />
<strong>Tender</strong><strong>in</strong>g authority, at its discretion, may consider appropriate; will be announced at the time <strong>of</strong><br />
open<strong>in</strong>g.<br />
18.4 The date fixed <strong>for</strong> open<strong>in</strong>g <strong>of</strong> bids, if subsequently declared as holiday by BSNL the revised date<br />
<strong>of</strong> schedule will be notified. However, <strong>in</strong> absence <strong>of</strong> such notification the bids will be opened on<br />
the next work<strong>in</strong>g day, time and venue rema<strong>in</strong><strong>in</strong>g unaltered.<br />
19. CLARIFICATION OF BIDS :<br />
To assist <strong>in</strong> the exam<strong>in</strong>ation, evaluation and comparison <strong>of</strong> bids, the <strong>Tender</strong><strong>in</strong>g authority may, at<br />
its discretion ask the bidder <strong>for</strong> the clarification <strong>of</strong> its bid. The request <strong>for</strong> clarification and the<br />
response shall be <strong>in</strong> writ<strong>in</strong>g. However, no post bid clarification at the <strong>in</strong>itiative <strong>of</strong> the bidder;<br />
shall be enterta<strong>in</strong>ed.<br />
20. PRELIMINARY EVALUATION:<br />
20.1 <strong>Tender</strong><strong>in</strong>g authority shall evaluate the bids to determ<strong>in</strong>e whether they are complete, whether any<br />
computational errors have been made, whether required sureties have been furnished, whether<br />
the documents have been properly signed and whether the bids are generally <strong>in</strong> order.<br />
20.2 Prior to the detailed valuation, pursuant to clause 21, the <strong>Tender</strong><strong>in</strong>g authority will determ<strong>in</strong>e the<br />
substantial responsiveness <strong>of</strong> each bid to the Bid documents. For purposes <strong>of</strong> these clauses, a<br />
substantially responsive bid is one, which con<strong>for</strong>ms, to all the terms and conditions <strong>of</strong> the Bid<br />
documents without material deviations. The <strong>Tender</strong><strong>in</strong>g authority’s determ<strong>in</strong>ation <strong>of</strong> bid’s<br />
responsiveness is to be based on the contents <strong>of</strong> the bid itself without recourse <strong>of</strong> extr<strong>in</strong>sic<br />
evidence.<br />
20.3 A bid, determ<strong>in</strong>ed as substantially non-responsive will be rejected by the <strong>Tender</strong><strong>in</strong>g authority<br />
and shall not subsequent to the bid open<strong>in</strong>g be made responsive by the bidder by correction <strong>of</strong><br />
the noncon<strong>for</strong>mity also the <strong>Tender</strong><strong>in</strong>g authority shall not be bound to show the reasons/causes <strong>of</strong><br />
rejection <strong>of</strong> the bid.<br />
20.4 The <strong>Tender</strong><strong>in</strong>g authority may waive any m<strong>in</strong>or <strong>in</strong>firmity or non-con<strong>for</strong>mity or irregularity <strong>in</strong> a<br />
bid, which does not constitute a material deviation, provided such waiver, does not prejudice or<br />
affect the relative rank<strong>in</strong>g <strong>of</strong> any bidder.<br />
21. EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS :<br />
21.1 The <strong>Tender</strong><strong>in</strong>g authority shall evaluate <strong>in</strong> detail and compare the bids previously determ<strong>in</strong>ed to<br />
be substantially responsive pursuant to clause 20.<br />
21.2 Arithmetical errors shall be rectified on the follow<strong>in</strong>g basis. If there is a discrepancy between the<br />
unit price and total price that is obta<strong>in</strong>ed by multiply<strong>in</strong>g the unit price and quantity, the unit price<br />
shall prevail and the total price shall be corrected by the tender<strong>in</strong>g authority. If there is a<br />
discrepancy between words and figures, the amount <strong>in</strong> words shall prevail. If the bidder does<br />
not accept the correction <strong>of</strong> the errors, his bid shall be rejected. The evaluation <strong>of</strong> bid will be<br />
done on total cost.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
22. CONTACTING THE TENDERING AUTHORITY:<br />
22.1 Subject to Clause 19, no bidder shall try to <strong>in</strong>fluence the <strong>Tender</strong><strong>in</strong>g authority on any matter<br />
relat<strong>in</strong>g to its bid, from the time <strong>of</strong> the bid open<strong>in</strong>g till the time the contract is awarded.<br />
22.2 Any ef<strong>for</strong>t by a bidder to <strong>in</strong>fluence the <strong>Tender</strong><strong>in</strong>g authority <strong>in</strong> the <strong>Tender</strong><strong>in</strong>g authority’s bid<br />
evaluation, bid comparison or contract award decisions shall result <strong>in</strong> the rejection <strong>of</strong> the bid.<br />
F. CONTRACT<br />
23. AWARD OF CONTRACT :<br />
The <strong>Tender</strong><strong>in</strong>g authority shall consider placement <strong>of</strong> orders <strong>for</strong> execute the work only on those<br />
eligible bidders whose <strong>of</strong>fers have been found technically, commercially and f<strong>in</strong>ancially<br />
acceptable.<br />
24. TENDERING AUTHORITY’S RIGHT TO VARY QUANTITIES AT THE TIME OF AWARD :<br />
The <strong>Tender</strong><strong>in</strong>g authority will have the right to <strong>in</strong>crease or decrease the quantity by up to 25% <strong>of</strong><br />
the total quantity <strong>of</strong> works without any change <strong>in</strong> unit price <strong>of</strong> the ordered quantity or other,<br />
terms and conditions at the time <strong>of</strong> award <strong>of</strong> contract with<strong>in</strong> the validity period <strong>of</strong> the contract.<br />
25. VALIDITY OF CONTRACT<br />
The contract shall normally be valid <strong>for</strong> One Year from the date <strong>of</strong> sign<strong>in</strong>g <strong>of</strong> the agreement.<br />
26. TENDERING AUTHORITY’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY<br />
OR ALL BIDS :<br />
The <strong>Tender</strong><strong>in</strong>g authority reserves the right to accept or reject any bid, and to annul the bidd<strong>in</strong>g<br />
process and reject all bids, at any time prior to award <strong>of</strong> contract without assign<strong>in</strong>g any reason<br />
whatsoever and without thereby <strong>in</strong>curr<strong>in</strong>g any liability to the affected bidder or bidders on the<br />
grounds <strong>for</strong> the <strong>Tender</strong><strong>in</strong>g authority’s action.<br />
27. ISSUE OF Letter Of Intent (LOI) :<br />
27.1 The issue <strong>of</strong> an LOI shall constitute the <strong>in</strong>tention <strong>of</strong> the <strong>Tender</strong><strong>in</strong>g authority to enter <strong>in</strong>to the<br />
contract with the bidder.<br />
27.2 The bidder shall with<strong>in</strong> 15 days <strong>of</strong> issue <strong>of</strong> the LOI give his unconditional acceptance to the<br />
terms & Conditions <strong>of</strong> tender <strong>in</strong> writ<strong>in</strong>g along with per<strong>for</strong>mance security <strong>for</strong> an amount <strong>of</strong> 10 %<br />
<strong>of</strong> the contract value <strong>for</strong> a period <strong>of</strong> one and half a year(18 months) <strong>in</strong> con<strong>for</strong>mity with Section<br />
IX provided with the bid documents.<br />
28. SIGNING OF CONTRACT :<br />
28.1 The issue <strong>of</strong> Work order shall constitute the award <strong>of</strong> contract on the bidder.<br />
28.2 Upon the successful bidder furnish<strong>in</strong>g the per<strong>for</strong>mance security <strong>of</strong> equal amount, the <strong>Tender</strong><strong>in</strong>g<br />
authority shall discharge its bid security, pursuant to Clause 11.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
29. ANNULMENT OF AWARD :<br />
Failure <strong>of</strong> the successful bidder to sign the agreement shall constitute sufficient ground <strong>for</strong> the<br />
annulment <strong>of</strong> the award and <strong>for</strong>feiture <strong>of</strong> the bid security <strong>in</strong> which event the <strong>Tender</strong><strong>in</strong>g authority may<br />
make the award to any other bidder at the discretion <strong>of</strong> the <strong>Tender</strong><strong>in</strong>g authority or call <strong>for</strong> new bids.<br />
30. COURT JURISDICTION :<br />
The contract shall be governed by Indian Laws and Courts at Sr<strong>in</strong>agar (<strong>Gwl</strong>.) will have the<br />
jurisdiction to enterta<strong>in</strong> any dispute or claim aris<strong>in</strong>g out <strong>of</strong> this tender till issue <strong>of</strong> Work order<br />
31 While all the conditions specified <strong>in</strong> the Bid Documents are critical and are to be complied,<br />
special attention <strong>of</strong> bidder is <strong>in</strong>vited to the follow<strong>in</strong>g clauses <strong>of</strong> the bid document, noncompliance<br />
<strong>of</strong> any one <strong>of</strong> which shall result <strong>in</strong> out right rejection <strong>of</strong> the bid.<br />
i. Clause 14.1 <strong>of</strong> Section II - The bids will be recorded/ returned unopened, if covers are not<br />
properly sealed with “Personal seal” <strong>of</strong> the bidder.<br />
ii. Clause 11.1 & 12.1 <strong>of</strong> Section II - The bids will be rejected at open<strong>in</strong>g stage if bid security is not<br />
submitted as per Clauses 11.1 bid validity is less than the period prescribed <strong>in</strong> Clause 12.1<br />
mentioned above.<br />
iii. Clause 2 & 10 <strong>of</strong> Section II - If the eligibility condition as per clause 2, Section II is not met<br />
and/or documents prescribed to establish the eligibility as per Clause 10 <strong>of</strong> Section II are not<br />
enclosed, the bids will be rejected without further evaluation.<br />
iv. Section VII: Price schedule- Prices are not filled <strong>in</strong> properly as prescribed <strong>in</strong> price schedule.<br />
a) Be<strong>for</strong>e outright rejection <strong>of</strong> the bid <strong>for</strong> non-compliance <strong>of</strong> any <strong>of</strong> the provisions mentioned <strong>in</strong><br />
clause 31 (i) and (ii) <strong>of</strong> section-II, the <strong>Tender</strong><strong>in</strong>g authority may extend opportunity to the<br />
Bidder(s)/Companies to expla<strong>in</strong> it’s/ their position. However if the person represent<strong>in</strong>g the<br />
company is not satisfied with the decision <strong>of</strong> the Bid-open<strong>in</strong>g team, he/they can submit the<br />
representation to Bid-open<strong>in</strong>g team immediately but <strong>in</strong> no case after clos<strong>in</strong>g <strong>of</strong> the tender process<br />
with full justification quot<strong>in</strong>g specifically the violation <strong>of</strong> tender conditions, if any.<br />
b) The representations received <strong>in</strong> bid open<strong>in</strong>g day shall be submitted to the competent authority <strong>for</strong><br />
review if the bid open<strong>in</strong>g team is satisfied with the arguments <strong>of</strong> the bidder(s)/companies<br />
mentioned <strong>in</strong> their representations and feel that there is prima-facie fact <strong>for</strong> consideration as early<br />
as possible and decision to this effect shall be communicated to the bidder company. If the<br />
review<strong>in</strong>g <strong>of</strong>ficer f<strong>in</strong>ds it fit to open the bid <strong>of</strong> the petitioner, the bid(s) shall be opened by giv<strong>in</strong>g<br />
three (work<strong>in</strong>g) days notice to all the participat<strong>in</strong>g bidders to give opportunity to desirous<br />
participants to be present on the occasion.<br />
c) The <strong>Tender</strong><strong>in</strong>g authority shall not return the bids submitted by the bidders on the date <strong>of</strong> tender<br />
open<strong>in</strong>g even if it is liable <strong>for</strong> rejection. Such bids shall be kept preserved <strong>in</strong> sealed cover as<br />
submitted by the bidder(s), however; desirous representatives <strong>of</strong> the participat<strong>in</strong>g bidders/<br />
companies present on the occasion may put their signatures on the sealed envelopes if they<br />
<strong>in</strong>tend to do so. Bids found liable <strong>for</strong> rejection will be returned to the bidders after issue <strong>of</strong> w.o.<br />
aga<strong>in</strong>st <strong>in</strong>stant tender.<br />
32. <strong>Tender</strong><strong>in</strong>g authority reserves the right to disqualify the bidder <strong>for</strong> suitable period who habitually<br />
failed to complete the work <strong>in</strong> time. Further, the bidders whose work do not per<strong>for</strong>m<br />
satisfactorily <strong>in</strong> the field <strong>in</strong> accordance with the specifications may also be disqualified <strong>for</strong> a<br />
suitable period as decided by the <strong>Tender</strong><strong>in</strong>g authority.<br />
33. <strong>Tender</strong><strong>in</strong>g authority reserves the right to black list a bidder <strong>for</strong> a suitable period <strong>in</strong> case he fails to<br />
honour his bid without sufficient grounds.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
34. The bidder should give a certificate that none <strong>of</strong> his / her near relative is work<strong>in</strong>g <strong>in</strong> the units as<br />
def<strong>in</strong>ed below where he/she is go<strong>in</strong>g to apply <strong>for</strong> the tender. In case <strong>of</strong> proprietorship firm certificate<br />
will be given by the proprietor. For the partnership firm, certificate will be given by all the partners and<br />
<strong>in</strong> case <strong>of</strong> limited company by all the directors <strong>of</strong> the company exclud<strong>in</strong>g Government <strong>of</strong> India/<br />
F<strong>in</strong>ancial <strong>in</strong>stitutions nom<strong>in</strong>ees and <strong>in</strong>dependent non-<strong>of</strong>ficial part time Directors appo<strong>in</strong>ted by<br />
Government <strong>of</strong> India or the Governor <strong>of</strong> the state. Due to any breach <strong>of</strong> these conditions by the company<br />
or firm or any other person, the tender will be cancelled and bid security will be <strong>for</strong>feited at any stage<br />
whenever it is noticed and BSNL will not pay any damage to the company or the firm or the concerned<br />
person.<br />
The company or firm or the person will also be debarred <strong>for</strong> further participation <strong>in</strong> the<br />
concerned unit.<br />
The near relatives <strong>for</strong> this purpose are def<strong>in</strong>ed as:-<br />
(a) Members <strong>of</strong> a H<strong>in</strong>du undivided family.<br />
(b) They are husband and wife.<br />
(c) The one is related to the other <strong>in</strong> the manner as Father, Mother, Son(s) and Son’s wife<br />
(Daughter-<strong>in</strong>-law), Daughter(s) and Daughter’s husband (Son-<strong>in</strong>-law), Brother(s) and<br />
Brother’s wife, Sister(s) & Sister’s husband (Brother-<strong>in</strong>-law).<br />
The <strong>for</strong>mat <strong>of</strong> the certificate to be given is as follows –<br />
I,________________________ ,s/o _____________________ R/o _____________________ do<br />
here by certify that non <strong>of</strong> my relative(s) as def<strong>in</strong>ed <strong>in</strong> the tender document is/are employed <strong>in</strong> BSNL<br />
unit as per details given <strong>in</strong> tender document. Incase at any stage, it is found that the <strong>in</strong><strong>for</strong>mation given by<br />
me is false/<strong>in</strong>correct, BSNL shall have the absolute right to take any action as deemed fit without any<br />
prior <strong>in</strong>timation to me.”<br />
As per Section- XII.<br />
*********************************************<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
1. DEFINITIONS<br />
Section-III<br />
CONDITION OF CONTRACT<br />
The contract means the document <strong>for</strong>m<strong>in</strong>g the tender and acceptance there<strong>of</strong> and the <strong>for</strong>mal<br />
agreement executed between the BSNL and the contractor together with the documents referred<br />
to there<strong>in</strong> <strong>in</strong>clud<strong>in</strong>g the conditions <strong>of</strong> contract, the specifications, designs, draw<strong>in</strong>gs and<br />
<strong>in</strong>struction issue from time to time by the GMTD and all these documents taken together shall be<br />
deemed to <strong>for</strong>m one contract and shall be complementary to one another. In the contract, the<br />
follow<strong>in</strong>g expressions shall unless where the context otherwise required, have the mean<strong>in</strong>g<br />
hereby respectively assigned to them.<br />
a) The expression WORK or WORKS shall unless there be someth<strong>in</strong>g either <strong>in</strong> the subject or<br />
context repugnant to such construction be construed and taken to mean the works by or by virtue<br />
<strong>of</strong> the contract to be executed whether temporary or permanent and whether orig<strong>in</strong>al, altered,<br />
substituted or additional.<br />
b) The SITE shall mean the location and/or other places on which work is to be executed under the<br />
contract.<br />
c) SITE ENGINEER shall mean any supervisory <strong>of</strong>ficer <strong>of</strong> the Bharat Sanchar Nigam Limited who<br />
may be placed by the DE / AGM /SDE as <strong>in</strong> charge <strong>of</strong> the work at site at any particular period <strong>of</strong><br />
time.<br />
d) The contractor shall mean the <strong>in</strong>dividual or firm or company whether <strong>in</strong>corporated or not,<br />
undertak<strong>in</strong>g the works and shall <strong>in</strong>clude the local personal representative or such <strong>in</strong>dividual or<br />
the persons compos<strong>in</strong>g such firm or company or the successors <strong>of</strong> such firm or company and the<br />
permitted assignees or such <strong>in</strong>dividual or firm or firms or company.<br />
e) The DE/AGM/SDE In-charge means, the DE/AGM/SDE who shall supervise and shall be<br />
<strong>in</strong>charge <strong>of</strong> the work, at any time or who shall sign the contract on behalf <strong>of</strong> BSNL.<br />
f) The Bharat Sanchar Nigam Limited means the department <strong>of</strong> Telecommunications, Government<br />
<strong>of</strong> India Enterprise under M<strong>in</strong>istry <strong>of</strong> Communication. All references <strong>of</strong> Department, CGMT,<br />
DGM, AGM/DE, SDE, JTO, and Accounts Officer <strong>in</strong> various clauses shall be taken to mean<br />
respectively.<br />
2. PERIOD OF VALIDITY<br />
The approved rates will rema<strong>in</strong> valid <strong>for</strong> a period <strong>of</strong> One Year from the date <strong>of</strong> execution <strong>of</strong><br />
agreement<br />
3. MANPOWER / MATERIAL / EQUIPMENTS / SUPPLIES<br />
a. The contractor shall be responsible <strong>for</strong> the transportation, storage and safe custody <strong>of</strong> all<br />
materials supplied to him by the department. The contractor shall satisfy himself regularly the<br />
quality and quantity <strong>of</strong> the materials supplied to him and he will be responsible <strong>for</strong> any<br />
subsequent deterioration and discrepancy (<strong>in</strong>clusive <strong>of</strong> theft) <strong>in</strong> the quality/quantity <strong>of</strong> the<br />
materials.<br />
b. The contractor shall submit a proper account every <strong>for</strong>tnight <strong>of</strong> all the materials supplied to him<br />
by the department and those consumed <strong>for</strong> items <strong>of</strong> work. Any discrepancy or difference<br />
between the material issued to the contractor and those consumed <strong>in</strong> the work as per the<br />
department’s calculation (which shall be f<strong>in</strong>al) will be charged to the contractor or deducted from<br />
his bills at cost price <strong>in</strong>clusive <strong>of</strong> any escalation and <strong>in</strong>clud<strong>in</strong>g freight, handl<strong>in</strong>g charges, storage<br />
charges etc.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
4. GUARANTEES<br />
In addition to any and all other guarantees and warranty mentioned <strong>in</strong> the contract documents,<br />
the contractor guarantees that the entire work will be done <strong>in</strong> a satisfactory manner and free from<br />
any defects <strong>in</strong> workmanship and f<strong>in</strong>ish and <strong>in</strong> con<strong>for</strong>mity <strong>in</strong> all respects with the specifications<br />
and direction. The contractor also undertakes to repair or replace, as the case may be at his own<br />
cost and risk any part <strong>of</strong> the works which may be damaged or that may develop any defects due<br />
to bad workmanship or otherwise due to the fault <strong>of</strong> the contractor with<strong>in</strong> a period <strong>of</strong> one month<br />
notice .<br />
5. METHOD AND MANNER OF PERFORMANCE<br />
The contractor shall be an <strong>in</strong>dependent contractor and shall have complete charge <strong>of</strong> the men<br />
engaged <strong>in</strong> the per<strong>for</strong>mance <strong>of</strong> the works to be per<strong>for</strong>med hereunder and shall per<strong>for</strong>m the works<br />
<strong>in</strong> accordance with his own methods and his own risk, subject to compliance with the contract<br />
execute the works <strong>in</strong> the best and most substantial workman like manner and both as regards<br />
material and otherwise <strong>in</strong> respect <strong>in</strong> strict accordance with the contract documents or such other<br />
additional particulars, <strong>in</strong>structions as may be found requisite to be given dur<strong>in</strong>g carry<strong>in</strong>g out the<br />
works, en<strong>for</strong>ce good order among his employees and shall not employ on the work any unfit<br />
person or any one not capable or not properly qualified to properly per<strong>for</strong>m the work assigned to<br />
him. The contractor shall also not employ <strong>in</strong> respect <strong>of</strong> the works any employee that the<br />
SDE/DE/AGM/Site Eng<strong>in</strong>eer may <strong>for</strong> any reason object to.<br />
6. SUB - CONTRACTOR<br />
a. No sub contract <strong>in</strong> any circumstance is permissible.<br />
b. The contractor shall <strong>in</strong>demnify and save harmless to the BSNL from and aga<strong>in</strong>st all actions,<br />
suits, proceed<strong>in</strong>gs, losses, costs damages, charges, claims and demands what so ever, either <strong>in</strong><br />
law or <strong>in</strong> equity and all cost (<strong>in</strong>clusive between attorney and client) and charges and expenses<br />
that the BSNL may susta<strong>in</strong> out <strong>of</strong> or <strong>in</strong>cidental (to <strong>in</strong> connection with any act (s) or<br />
commissions) <strong>of</strong> the contractor, his agents, employees.<br />
7. GENERAL TERMS AND CONDITIONS<br />
a).<br />
b).<br />
c).<br />
d).<br />
e).<br />
The bidder shall <strong>in</strong>timate the contact number & address <strong>of</strong> service center locate <strong>in</strong> Sr<strong>in</strong>agar<br />
(<strong>Gwl</strong>.) SSA where the compla<strong>in</strong>ts regard<strong>in</strong>g faults/defects are to be reported by the consignee/<br />
field staff <strong>of</strong> BSNL and the bidder should have own at least one motor Vehicle.<br />
The contractor has to arrange one technical qualified person along with contact No. & fax etc. at<br />
service centre located <strong>in</strong> the Sr<strong>in</strong>agar (<strong>Gwl</strong>.) SSA<br />
All safety measures are to be taken while do<strong>in</strong>g the work.<br />
All tools and man power required <strong>for</strong> <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s will be arranged by the vendor on his own<br />
cost.<br />
Preventive ma<strong>in</strong>tenance- Once <strong>in</strong> three month <strong>for</strong> check<strong>in</strong>g functional aspects and adjustments.<br />
This requirement can also be adjusted with corrective ma<strong>in</strong>tenance wherever possible.<br />
f) Travel<strong>in</strong>g expenses <strong>of</strong> <strong>DSPT</strong> vendor personal: Journey to location <strong>of</strong> <strong>DSPT</strong> unit and back and the<br />
expenses on their board<strong>in</strong>g and lodg<strong>in</strong>g will be borne by <strong>DSPT</strong> vendor.<br />
g) In case any additional man power or resources become necessary dur<strong>in</strong>g <strong>AMC</strong> period will be<br />
provided by the vendor with out any extra charge.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
h) Certification by the user - Official <strong>of</strong> BSNL on duty at site shall sign on customer call slip. This<br />
will be taken as certificate <strong>for</strong> work done by vendor.<br />
i) Compla<strong>in</strong>ts booked by <strong>DSPT</strong> customer through 199 (a charge free access to HUB) from <strong>DSPT</strong>s<br />
or to direct dial<strong>in</strong>g HUB Helpl<strong>in</strong>e no. These compla<strong>in</strong>ts shall be given by Hub team to SSAs<br />
<strong>DSPT</strong> team by way <strong>of</strong> E mail/Fax.<br />
j) The circle/ SSA may ensure the generation <strong>of</strong> the periodic management report at call centre <strong>for</strong><br />
monitor<strong>in</strong>g <strong>of</strong> fault/ compla<strong>in</strong>t and its rectification.<br />
k) All other terms and condition <strong>of</strong> tender document will also apply.<br />
l) The successful tenderer shall not sublet the said contract work to any other party.<br />
m) The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) has got power to award the contract <strong>in</strong> parts or <strong>in</strong> whole.<br />
n) The tender document also <strong>for</strong>m a part <strong>of</strong> the agreement/contract.<br />
o) Normally the lowest bidder shall receive the consideration <strong>for</strong> award the work but it should also<br />
be clearly understood that the GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) shall not necessarily be bound to accept<br />
the lowest bidder. If considered necessary the GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) shall be free to reject any<br />
or all the tenders without assign<strong>in</strong>g any reasons there<strong>of</strong>.<br />
p) The approved tenderer shall be required to execute an agreement on non judicial stamp paper <strong>of</strong><br />
Rs.100/- at the cost <strong>of</strong> supplier <strong>for</strong> carry<strong>in</strong>g out the work, which will be normally valid <strong>for</strong> a<br />
period <strong>of</strong> one year from the date <strong>of</strong> sign<strong>in</strong>g agreement but GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) will reserve<br />
the right to cancel it <strong>in</strong> between or enhance it further without assign<strong>in</strong>g any reason to the<br />
tenderer.<br />
q) The accepted rates will operative <strong>for</strong> a period <strong>of</strong> one year from the date <strong>of</strong> sign<strong>in</strong>g the contract.<br />
The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) reserves the right to extend or reduce the period, if necessary or<br />
accord<strong>in</strong>g to requirement from time to time. The accepted rates will be valid <strong>for</strong> the entire period<br />
<strong>of</strong> contract and no escalation will be allowed on account <strong>of</strong> any reason, whatsoever.<br />
8. GENERAL<br />
01. The tenders shall be evaluated by a committee to be appo<strong>in</strong>ted by the GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) .<br />
i) The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) shall evaluate the bids to determ<strong>in</strong>e whether they are complete,<br />
whether any-computational errors have been made, whether required sureties have been<br />
furnished, whether the documents have been properly signed and whether the bids are generally<br />
<strong>in</strong> order.<br />
ii) If there is discrepancy between words and figures, the amount <strong>in</strong> words shall prevail. If the<br />
contractor does not accept the correction <strong>of</strong> errors, his bid shall be rejected.<br />
iii) A bid, determ<strong>in</strong>ed as substantially non-responsive will be rejected by the GMTD Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
and shall not subsequent to the bid open<strong>in</strong>g be made responsive by the bidder by correction <strong>of</strong><br />
the noncon<strong>for</strong>mity.<br />
iv) The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) may waive any m<strong>in</strong>or <strong>in</strong>firmity or non-con<strong>for</strong>mity or irregularity <strong>in</strong><br />
a bid, which does not constitute a material deviation, provided such waiver, does not prejudice or<br />
affect the relative rank<strong>in</strong>g <strong>of</strong> the bidder.<br />
v) The tender shall be evaluated based on the rates quoted <strong>in</strong> f<strong>in</strong>ancial bid on the basis <strong>of</strong> overall<br />
lowest bidder <strong>for</strong> total work.<br />
vi) The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) shall not be responsible <strong>for</strong> any escalation <strong>in</strong> prices <strong>of</strong> technical<br />
person or materials, mach<strong>in</strong>ery, equipment, etc. whatsoever or any <strong>in</strong>crease <strong>in</strong> any duties, levies,<br />
or taxes <strong>in</strong> respect there<strong>of</strong> whatsoever and the contractor rates and contractor’s obligation shall<br />
rema<strong>in</strong> unaffected by such escalation and/or <strong>in</strong>crease.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
02. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) reserves the right to reject one or all the tenders without assign<strong>in</strong>g<br />
any reason there<strong>of</strong>.<br />
03. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) reserves the right to cancel/reject any tender if the same is found to<br />
be conta<strong>in</strong><strong>in</strong>g any false/fabricated document/statement. Orig<strong>in</strong>al <strong>of</strong> all documents shall be<br />
produced, if required, at the time <strong>of</strong> purchase <strong>of</strong> tender documents <strong>for</strong> scrut<strong>in</strong>y without which<br />
documents will not be issued.<br />
04. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) reserves the right to apportion the total work amongst a number <strong>of</strong><br />
contractors at the approved rates and on uni<strong>for</strong>m terms and conditions.<br />
05. All tools and tackles <strong>for</strong> the work shall be provided by the contractor.<br />
06. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) will not be responsible to provide residential accommodation<br />
technical persons employed by the contractor. All arrangement <strong>in</strong> this regard will be the<br />
responsibility <strong>of</strong> the contractor.<br />
07. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) reserves the right to <strong>in</strong>crease or decrease or delete the scope <strong>of</strong> the<br />
work without assign<strong>in</strong>g any reasons.<br />
08. Conditional and <strong>in</strong>complete tenders are liable <strong>for</strong> rejection.<br />
09. <strong>Tender</strong> without EMD will summarily be rejected.<br />
10. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) will not be responsible <strong>for</strong> any mispr<strong>in</strong>t<strong>in</strong>g by the newspaper<br />
concerned. <strong>Tender</strong>ers are to contact the tender<strong>in</strong>g authority and verify the facts <strong>in</strong> case <strong>of</strong><br />
confusion.<br />
11. Issue <strong>of</strong> tender document does not automatically mean that the tenderer is qualified <strong>for</strong> the award<br />
<strong>of</strong> the contract. These will be reviewed and exam<strong>in</strong>ed dur<strong>in</strong>g the evaluation <strong>of</strong> the bid.<br />
12. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) is not bound to accept the lowest tender.<br />
13. The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) is not responsible <strong>for</strong> non-receipt/late receipt and loss <strong>of</strong> tender<br />
documents.<br />
14. In case <strong>of</strong> any dispute aris<strong>in</strong>g out <strong>of</strong> the contract between the two contract<strong>in</strong>g parties, the<br />
decision <strong>of</strong> the GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g.<br />
********************<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION IV<br />
SCOPE OF <strong>AMC</strong> OF <strong>DSPT</strong>s<br />
1. The works to be carried out under <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s will be as under:<br />
1.1 Visual Inspection on periodic basis at least once <strong>in</strong> three (3) months <strong>for</strong> Reflector, Mount and<br />
Reflector support Structure- <strong>in</strong> case <strong>of</strong> failure, the mount members that are damaged should be<br />
repaired or replaced.<br />
1.2 Feed Horn and Feed support- visual <strong>in</strong>spection is required to ensure that all hardware is secure and<br />
no moisture is collected <strong>in</strong>side the Feed Horn. Wash the front surface <strong>of</strong> the solar modules at least<br />
once <strong>in</strong> a month with clean water & non abrasive cloth.<br />
1.3 Check the support structure to ensure that all fix<strong>in</strong>g are tight. Touch up any scratches/ marks on the<br />
structure with suitable pa<strong>in</strong>t.<br />
1.4 Inspect the solar array cable <strong>for</strong> signs <strong>of</strong> damage <strong>of</strong> chatt<strong>in</strong>g; repair any such damage with <strong>in</strong>sulat<strong>in</strong>g<br />
tape.<br />
1.5 The follow<strong>in</strong>g ma<strong>in</strong>tenance should be per<strong>for</strong>med at 3 monthly <strong>in</strong>tervals <strong>for</strong> CCU.<br />
(i) Clean the enclosure us<strong>in</strong>g a s<strong>of</strong>t cloth/brush<br />
(ii) Check cables <strong>for</strong> damages or deterioration <strong>of</strong> the sheath and repair any such defect with<br />
<strong>in</strong>sulat<strong>in</strong>g tape.<br />
(iii) Verify that all cable connections are tight and corrosion free and that adequate stra<strong>in</strong> relief are<br />
provided <strong>for</strong> the cables.<br />
(iv) Measure the battery, array and load voltage as described <strong>in</strong> relevant sections.<br />
1.6 Measure the voltage present at the array cable plug <strong>in</strong> term<strong>in</strong>al quarterly. Verify that this voltage is<br />
greater than 17 V. Record the voltage as the “Array Open Circuit Voltage” and keep proper record at<br />
each <strong>DSPT</strong> Site.<br />
1.7 Check the SPV connection and clean the SPV panel. Charge battery to required level ( <strong>for</strong> about 3<br />
days) by SPV disconnect<strong>in</strong>g the load. Measure the current be<strong>in</strong>g generated by the array and record<br />
this read<strong>in</strong>g. The Solar Array should generate more than 0.5A.<br />
1.8 The electricity generated by the solar module is reduced if a large amount <strong>of</strong> dust is allowed to be<br />
accumulated on the module front surface. Wash the front surface <strong>of</strong> the solar modules at least once <strong>in</strong><br />
a month with clean water & non abrasive cloth.<br />
1.9 The battery be<strong>in</strong>g ma<strong>in</strong>tenance free does not require any rout<strong>in</strong>e ma<strong>in</strong>tenance. However, batteries are<br />
to be ensured to be kept <strong>in</strong> charged condition. If the system is not <strong>in</strong> use, still the batteries have to be<br />
charged. Hence, the solar charge controller will prevent the battery from be<strong>in</strong>g over charged and keep<br />
the battery healthy.<br />
1.10 The controller also has monitor<strong>in</strong>g po<strong>in</strong>ts to measure the load voltage, battery voltage SPV voltage,<br />
Load current, Battery current and SPV current. The current is measured across a 30A/75mV shunt,<br />
hence the 25mV <strong>of</strong> read<strong>in</strong>g across the mentioned po<strong>in</strong>ts <strong>for</strong> currents will be equal to 1A. that is the<br />
scale <strong>of</strong> read<strong>in</strong>g current is 25mV/Amp. These monitor<strong>in</strong>g po<strong>in</strong>t values are approximate <strong>for</strong> reference<br />
only.<br />
1.11 The controller has a solar charge controller which will disconnect the SPV module after the battery<br />
charges to 14.1V and reconnect the SPV module when the battery voltage falls below 13.6V thus<br />
keep<strong>in</strong>g the battery under float charge between 13.6V and 14.1V to be checked.<br />
1.12 Ensure the SPV module connection is firm to Array connector. Clean any evidence <strong>of</strong> corrosion <strong>of</strong><br />
battery connections and ensure that the term<strong>in</strong>als are tight.<br />
1.13 Verify the other connection to the PCB connectors. Check the load and allow the battery to be<br />
charged adequately by solar array be<strong>for</strong>e reconnect<strong>in</strong>g.<br />
1.14 Collect the <strong>DSPT</strong>/Equipment spare accessories from SSA Centre to replace the faulty part and return<br />
<strong>of</strong> the faulty equipment to SSA centre with proper receipt with<strong>in</strong> 3 days on receipt <strong>of</strong> compla<strong>in</strong>t by<br />
the <strong>in</strong>charge <strong>of</strong> <strong>DSPT</strong>. Repair <strong>of</strong> spare accessories & supply to the contractor will be done by the<br />
department.<br />
1.15 Any other work assigned by the <strong>DSPT</strong> <strong>in</strong>charge to contractor.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
2. GENERAL TERMS AND CONDITIONS<br />
2.1 Warranty <strong>of</strong> <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s shall start from the date <strong>of</strong> sign<strong>in</strong>g agreement/work order.<br />
2.2 Terms and condition <strong>of</strong> <strong>AMC</strong> shall be applicable dur<strong>in</strong>g contract period <strong>in</strong>clud<strong>in</strong>g imposition <strong>of</strong><br />
penalties. Amount <strong>for</strong> penalties will be deducted from the pend<strong>in</strong>g payments aga<strong>in</strong>st or if that<br />
amount is <strong>in</strong>sufficient then by <strong>in</strong>vok<strong>in</strong>g the PBG available <strong>of</strong> <strong>AMC</strong> <strong>of</strong> from the charges due <strong>for</strong><br />
<strong>AMC</strong>.<br />
2.3 It shall be mandatory <strong>for</strong> the bidders to undertake the Annual ma<strong>in</strong>tenance contract <strong>for</strong> one year<br />
to be selected bidders has to submit a signed copy <strong>of</strong> the <strong>AMC</strong> agreement along with the work<br />
order.<br />
2.4 For this purpose the bidder shall quote all <strong>in</strong>clusive comprehensive <strong>AMC</strong> charges <strong>for</strong> each year.<br />
However, service tax shall be paid extra as applicable.<br />
2.5 The bidder shall <strong>in</strong>timate the contact number & address <strong>of</strong> service center where the compla<strong>in</strong>ts<br />
regard<strong>in</strong>g faults/defects are to be reported by the consignee/ field staff <strong>of</strong> BSNL.<br />
2.6 An <strong>AMC</strong> agreement is to be signed between the GMTD <strong>of</strong>fice and the vendor be<strong>for</strong>e completion<br />
<strong>of</strong> warranty period.<br />
2.7 All safety measures are to be taken while do<strong>in</strong>g the work.<br />
2.8 All tools and man power required <strong>for</strong> <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s will be arranged by the vendor on his own<br />
cost.<br />
2.9 Preventive ma<strong>in</strong>tenance- Once <strong>in</strong> three month <strong>for</strong> check<strong>in</strong>g functional aspects and adjustments.<br />
This requirement can also be adjusted with corrective ma<strong>in</strong>tenance wherever possible.<br />
2.10 Travel<strong>in</strong>g expenses <strong>of</strong> <strong>DSPT</strong> vendor personal: Journey to location <strong>of</strong> <strong>DSPT</strong> unit and back and the<br />
expenses on their board<strong>in</strong>g and lodg<strong>in</strong>g will be borne by <strong>DSPT</strong> vendor.<br />
2.11 In case any additional man power or resources become necessary dur<strong>in</strong>g <strong>AMC</strong> period will be<br />
provided by the vendor without any extra charge.<br />
2.12 Certification by the user circle – Official <strong>of</strong> BSNL on duty at site shall sign on customer call slip.<br />
This will be taken as certificate <strong>for</strong> work done by vendor.<br />
2.13 Compla<strong>in</strong>ts booked by <strong>DSPT</strong> customer through 199 (a charge free access to HUB) from <strong>DSPT</strong>s<br />
or to direct dial<strong>in</strong>g HUB Helpl<strong>in</strong>e no. These compla<strong>in</strong>ts shall be given by Hub team to SSAs<br />
<strong>DSPT</strong> team by way <strong>of</strong> E mail/Fax.<br />
2.14 The circle/ SSA may ensure the generation <strong>of</strong> the periodic management report at call centre <strong>for</strong><br />
monitor<strong>in</strong>g <strong>of</strong> fault/ compla<strong>in</strong>t and its rectification.<br />
2.15 All other terms and condition <strong>of</strong> tender document will also apply.<br />
2.16 Work Order will be issued on quarterly basis.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
3. PERFORMANCE SECURITY:<br />
3.1 The bidder shall submit a per<strong>for</strong>mance security towards fulfillment <strong>of</strong> obligations under <strong>AMC</strong><br />
equivalent to 10% <strong>of</strong> the contract value <strong>in</strong> the <strong>for</strong>m <strong>of</strong> Bank Guarantee issued by a nationalized<br />
bank <strong>in</strong> favour <strong>of</strong> Account Officer (Cash), O/o GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) payable at Sr<strong>in</strong>agar<br />
(<strong>Gwl</strong>.) <strong>for</strong> a period <strong>of</strong> eighteen months.<br />
3.2 The per<strong>for</strong>mance bank guarantee aga<strong>in</strong>st work order will be released only after submission <strong>of</strong><br />
PBG aga<strong>in</strong>st <strong>AMC</strong> and fulfillment <strong>of</strong> other obligations <strong>of</strong> <strong>AMC</strong> <strong>of</strong> work which are prerequisite<br />
<strong>for</strong> release <strong>of</strong> the PBG.<br />
3.3 The Bank guarantee towards PERFORMANCE SECURITY as stipulated above shall be<br />
furnished (<strong>in</strong> the <strong>for</strong>mat <strong>in</strong>dicated at Section IX) duly issued by a Scheduled bank <strong>in</strong> favour <strong>of</strong><br />
the Purchaser on non- judicial stamp Paper <strong>of</strong> Rs. 100/- only.<br />
3.4 The Per<strong>for</strong>mance Bank Guarantee shall be submitted <strong>in</strong> favour <strong>of</strong> A.O. Cash O/o GMTS,Sr<strong>in</strong>agar<br />
<strong>for</strong> the <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s<br />
3.5 The purchaser shall have the absolute right to <strong>for</strong>feit the Per<strong>for</strong>mance Guarantee <strong>for</strong><br />
unsatisfactory per<strong>for</strong>mance <strong>of</strong> the CONTRACTOR or <strong>for</strong> any non-compliance <strong>of</strong> any <strong>of</strong> the<br />
conditions <strong>of</strong> this agreement.<br />
3.6 The Bank Guarantee shall be discharged after successful completion <strong>of</strong> CONTRACTOR’s<br />
per<strong>for</strong>mance obligations under the Agreement and subsequent extension if any.<br />
3.7 In the event <strong>of</strong> any default <strong>in</strong> the execution <strong>of</strong> Agreement by the CONTRACTOR under the<br />
contract, the Bank Guarantee shall be <strong>in</strong>voked either <strong>in</strong> part or <strong>in</strong> full. The proceeds <strong>of</strong><br />
per<strong>for</strong>mance security shall be payable to BSNL as compensation <strong>for</strong> any loss result<strong>in</strong>g from the<br />
contractors failure to complete obligation under the contract Agreement.<br />
4. PAYMENT<br />
4.1 100% payment to be done <strong>for</strong> <strong>AMC</strong> on quarterly basis at SSA HQ normally after submission <strong>of</strong><br />
bills duly certified by the site Incharge <strong>of</strong> the concerned unit.<br />
4.2 In case the vendor fails to rectify / remove the fault/ defects with<strong>in</strong> stipulated turn around time <strong>of</strong><br />
3 (three) days, he shall be liable to pay penalty at the rate <strong>of</strong> Rs. 100/ per day per site <strong>for</strong> the<br />
entire period counted after three days from date <strong>of</strong> compla<strong>in</strong>t to till date <strong>of</strong> rectify the faults/<br />
defects . Capp<strong>in</strong>g on penalty will be upto 25% <strong>of</strong> the <strong>AMC</strong> value <strong>of</strong> the equipment <strong>for</strong> the<br />
correspond<strong>in</strong>g quarter period. Delay <strong>for</strong> more than 10 days to rectify the fault/defect, total <strong>AMC</strong><br />
amount <strong>for</strong> that quarter will be <strong>for</strong>feited <strong>in</strong> addition other action if required to be taken aga<strong>in</strong>st<br />
contractor as per tender terms & conditions.<br />
4.3 The contractor shall submit bill on completion <strong>of</strong> the <strong>AMC</strong> work <strong>of</strong> <strong>DSPT</strong> site wise and work<br />
duly verified by the Site Incharge <strong>of</strong> the SSA.<br />
4.4 Income tax at the prevail<strong>in</strong>g rates with applicable surcharge & education cess <strong>for</strong> which the bill<br />
has been passed will be deducted as tax at source, under relevant BSNL Rules. However, if any<br />
new legislation comes <strong>in</strong>to effect <strong>for</strong> deduction <strong>of</strong> tax at source at any other rate, deduction will<br />
be made at that rate.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
4.5 Necessary Income tax Deduction certificate will be issued by Accounts Officer (cash), Office <strong>of</strong><br />
the GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.) detail<strong>in</strong>g the amount so deducted as tax at source at the time <strong>of</strong><br />
payment <strong>of</strong> each bill.<br />
4.6 The <strong>AMC</strong> contractor will ensure <strong>for</strong> timely payment <strong>of</strong> EPF contribution relat<strong>in</strong>g to Employees<br />
and Employers share to EPF authorities <strong>in</strong> respect all the Staff engaged by the agency. Each<br />
claim bill <strong>of</strong> <strong>AMC</strong> contractor must accompany the (i) list show<strong>in</strong>g the details <strong>of</strong> employees<br />
engaged (ii) dur<strong>in</strong>g <strong>of</strong> their engagement (iii) the amount <strong>of</strong> wages paid to such employees <strong>for</strong> the<br />
duration <strong>in</strong> question (iv) amount <strong>of</strong> EPF contribution (both employees contribution) <strong>for</strong> the<br />
duration <strong>of</strong> engagement <strong>in</strong> question, paid to the EPF Authorities (V) copies <strong>of</strong> authenticated<br />
documents <strong>of</strong> payments <strong>of</strong> such contribution to EPF authorities (vi) a declaration regard<strong>in</strong>g<br />
compliance <strong>of</strong> the conditions <strong>of</strong> EPF Act 1952.<br />
4.7 Sales tax as applicable will be deducted.<br />
4.8 The bills are to be submitted <strong>in</strong> DUPLICATE and <strong>in</strong> the manner and <strong>for</strong>m that may be prescribed<br />
by the Sr<strong>in</strong>agar SSA. Payments will be made only by Account Payee cheques. The contractor<br />
has to <strong>in</strong>timate his bank account number and branch details <strong>for</strong> issu<strong>in</strong>g the cheque.<br />
4.9 Any liquidated damages due shall also be recoverable from the bills submitted <strong>for</strong> payment, by<br />
the a<strong>for</strong>esaid <strong>of</strong>ficers.<br />
410 The Per<strong>for</strong>mance Security Deposit shall be considered <strong>for</strong> adjustment aga<strong>in</strong>st liquidated damages<br />
only at the time <strong>of</strong> f<strong>in</strong>al conclusion <strong>of</strong> the contract and f<strong>in</strong>al settlement <strong>of</strong> account.<br />
4.11 The f<strong>in</strong>al settlement <strong>of</strong> the bills and refund adjustment/appropriation <strong>of</strong> any amount reta<strong>in</strong>ed, the<br />
contractor shall be made fully free after the DE/AGM is satisfied that all the contractual<br />
obligations have been fully met and no amount rema<strong>in</strong>s due <strong>for</strong> recovery from the contractor on<br />
any count.<br />
4.12 The bill shall have to be submitted by the contractor with<strong>in</strong> one month <strong>of</strong> the date <strong>of</strong> completion<br />
<strong>of</strong> the work. Total billed amount will be paid after successful completion <strong>of</strong> <strong>AMC</strong> work.<br />
4.13 Any defect noticed dur<strong>in</strong>g this period has to be attended without any extra payment. The EMD<br />
reta<strong>in</strong>ed as security deposit will be refunded after term<strong>in</strong>ation <strong>of</strong> the contract period.<br />
5. PENALTY<br />
In case the vendor fail to rectify/ removed the fault/ defect with<strong>in</strong> stipulated turn around time <strong>of</strong><br />
3 days from the date <strong>of</strong> compla<strong>in</strong>t. He shall be liable to pay penalty at the rate <strong>of</strong> Rs. 25/- per day<br />
per site <strong>for</strong> the entire period counted upto the date <strong>of</strong> rectification <strong>of</strong> the faults/defect. Capp<strong>in</strong>g<br />
on penalty will be upto 25% <strong>of</strong> <strong>AMC</strong> value <strong>of</strong> the equipment <strong>for</strong> the correspond<strong>in</strong>g period <strong>of</strong> as<br />
decided on case to case basis <strong>of</strong> the <strong>AMC</strong> value <strong>for</strong> that period penalty time.<br />
6. Term<strong>in</strong>ation<br />
In case the per<strong>for</strong>mance <strong>of</strong> the CONTRACTOR dur<strong>in</strong>g <strong>AMC</strong> is not satisfactory, BSNL shall be<br />
free to term<strong>in</strong>ate the <strong>AMC</strong> dur<strong>in</strong>g its currency either <strong>in</strong> full or <strong>in</strong> part, after giv<strong>in</strong>g one month<br />
notice to the CONTRACTOR and encash and <strong>for</strong>feit the Per<strong>for</strong>mance Bank Guarantee.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
7. Force Majure:<br />
1. Neither the BSNL nor CONTRACTOR shall be liable to the other <strong>for</strong> any delay <strong>in</strong> or<br />
failure <strong>of</strong> per<strong>for</strong>mance <strong>of</strong> their respective obligation under the agreement caused by<br />
occurrences beyond the control <strong>of</strong> BSNL or the CONTRACTOR (as the case may be)<br />
<strong>in</strong>clud<strong>in</strong>g but not limited to fire (<strong>in</strong>clud<strong>in</strong>g failure or reductions),acts <strong>of</strong> God, acts to the<br />
public enemy, war, <strong>in</strong>surrections, riots, strikes, lockouts, sabotage, any law ,status or<br />
ord<strong>in</strong>ance there<strong>of</strong> <strong>of</strong> any other local authority, or any compliance therewith or any other<br />
causes, cont<strong>in</strong>gencies <strong>of</strong> circumstances similar to the above. Either party shall promptly<br />
but not later than twenty days thereafter notify the above <strong>of</strong> the commencement and<br />
cessation <strong>of</strong> such cont<strong>in</strong>gencies and if such cont<strong>in</strong>gencies cont<strong>in</strong>ue beyond three months<br />
both parties agree upon the equitable solution <strong>for</strong> term<strong>in</strong>ation <strong>of</strong> this agreement or<br />
otherwise decide the course <strong>of</strong> action to be adopted.<br />
8. Disputes & Arbitration<br />
1. In the event <strong>of</strong> any question, dispute or difference aris<strong>in</strong>g under this agreement or <strong>in</strong><br />
connection there-with (except as to matter the decision <strong>of</strong> which is specifically provided<br />
under this agreement), the same shall be referred to the Sole arbitration <strong>of</strong> the CGMT<br />
Uttrakhand Circle Dehradun or <strong>in</strong> case his designation is changed or his <strong>of</strong>fice is<br />
abolished then <strong>in</strong> such case to the sole arbitration <strong>of</strong> the <strong>of</strong>ficer <strong>for</strong> the time be<strong>in</strong>g<br />
entrusted(whether <strong>in</strong> addition to his own duties or otherwise) with the functions <strong>of</strong> the<br />
CGMT Uttrakhand Circle Dehradun or by whatever designations these <strong>of</strong>ficers may be<br />
called( here<strong>in</strong>after referred to as the said <strong>of</strong>ficer) and if the CGMT Uttrakhand Circle<br />
Dehradun or the said <strong>of</strong>ficer is unable or unwill<strong>in</strong>g to act as such the sole arbitration <strong>of</strong><br />
some other person appo<strong>in</strong>ted by the CGMT Uttrakhand Circle Dehradun or the said<br />
<strong>of</strong>ficer. The agreement to appo<strong>in</strong>t an arbitrator will be <strong>in</strong> accordance with the Arbitration<br />
and Conciliation Act 1996.<br />
2. There will be no objection to any such appo<strong>in</strong>tment on the ground that the arbitrator is<br />
BSNL servant or that he has to deal with the matter to which the agreement relates or that<br />
<strong>in</strong> the course <strong>of</strong> his duties as BSNL servant he has expressed views on all or any <strong>of</strong> the<br />
matter under dispute. The award <strong>of</strong> the arbitrator shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the parties<br />
to the agreement. In the event <strong>of</strong> such arbitrator to whom the matter is orig<strong>in</strong>ally referred,<br />
be<strong>in</strong>g transferred or vacat<strong>in</strong>g his <strong>of</strong>fice or be<strong>in</strong>g unable to act <strong>for</strong> any reasons whatsoever<br />
the CGMT Uttrakhand Circle Dehradun or the said <strong>of</strong>ficer shall appo<strong>in</strong>t another person to<br />
act as arbitrator <strong>in</strong> accordance to the terms <strong>of</strong> the agreement and the person so appo<strong>in</strong>ted<br />
shall be entitled to proceed from the stage at which it was left out by his predecessors.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
3. The arbitrator may from time to time with the consent <strong>of</strong> parties enlarge the time <strong>for</strong> mak<strong>in</strong>g and<br />
publish<strong>in</strong>g the award. Subject to a<strong>for</strong>esaid Arbitration and Conciliation Act 1996 and the rules<br />
made there under, any modification there<strong>of</strong> <strong>for</strong> the time be<strong>in</strong>g <strong>in</strong> <strong>for</strong>ce shall be deemed to apply<br />
to the arbitration proceed<strong>in</strong>g under this clause.<br />
4. The venue <strong>of</strong> the arbitration proceed<strong>in</strong>g shall be the Office <strong>of</strong> the CGMT Uttrakahand Circle<br />
Dehradun or such other places as the arbitrator may decide<br />
5 Both parties shall use their best ef<strong>for</strong>ts <strong>in</strong> good faith and best <strong>in</strong>tention to resolve disputes by<br />
mutual negotiation and consultation and shall settle amicably any dispute that may arise or relate<br />
to this agreement or a breach there<strong>of</strong> pend<strong>in</strong>g resolution <strong>of</strong> a dispute the CONTRACTOR shall<br />
cont<strong>in</strong>ue to fulfill its obligations under this agreement.<br />
9. Set Off<br />
Any sum <strong>of</strong> money due and payable to the refundable to him under the contract may be<br />
appropriated by the purchaser <strong>of</strong> BSNL or any other person or person contract<strong>in</strong>g through<br />
Government <strong>of</strong> India and set <strong>of</strong>f the same aga<strong>in</strong>st any claim <strong>of</strong> the Purchaser or BSNL or such<br />
other person or persons <strong>for</strong> payment <strong>of</strong> a sum <strong>of</strong> money aris<strong>in</strong>g out <strong>of</strong> the contract or under any<br />
other contract made by the CONTRACTOR with the purchaser or the BSNL or such other<br />
person or persons contract<strong>in</strong>g through BSNL<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
AGREEMENT ANNEXURE – A<br />
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR <strong>DSPT</strong><br />
Ref: ……………………………….. issued on……………and opened on ..<br />
This agreement is made on ……..day <strong>of</strong> (Month and year) between M/s Bharat Sanchar Nigam<br />
Limited, a company registered under the Companies Act 1956 hav<strong>in</strong>g license to provide all types <strong>of</strong><br />
telecom services and hav<strong>in</strong>g its registered <strong>of</strong>fice at Bharat Sanchar Bhawan , H C Mathur Lane, Janpath<br />
New Delhi - 11000 (here<strong>in</strong>after called the BSNL) <strong>of</strong> the ONE PART<br />
AND<br />
M/s …………………..a company registered under the Companies Act 1956 and hav<strong>in</strong>g its registered<br />
<strong>of</strong>fice …………………………………………………………(here<strong>in</strong>after called CONTRACTOR which<br />
expression shall unless repugnant to the context, <strong>in</strong>clude its successors <strong>in</strong> bus<strong>in</strong>ess, legal representatives<br />
and adm<strong>in</strong>istrators or permitted assigns) <strong>of</strong> the OTHER PART <strong>for</strong> Comprehensive Annual Ma<strong>in</strong>tenance<br />
<strong>of</strong> <strong>DSPT</strong> <strong>in</strong>stalled and commissioned <strong>in</strong> Uttaranchal Telecom Circle.<br />
WHEREAS, BSNL has placed work order on the CONTRACTOR <strong>for</strong> <strong>in</strong>stallation and<br />
commission<strong>in</strong>g <strong>of</strong> <strong>DSPT</strong> referred to as <strong>DSPT</strong> jo<strong>in</strong>tly or severally and its comprehensive Annual<br />
Ma<strong>in</strong>tenance <strong>for</strong> (3) years.<br />
WHEREAS as per the provisions <strong>of</strong> the <strong>Tender</strong> number ………………………………………<br />
Dated:………………….. (here<strong>in</strong>after called the “Bid Document”) and PO/LOI<br />
No……………………………………. dated……………….. & PO/LOI/LOI No<br />
……………………………………………. dated………………….. <strong>in</strong> Uttaranchal Telecom Circle (a<br />
BSNL’s field Unit), the CONTRACTOR <strong>for</strong> <strong>DSPT</strong> is contractually required to enter <strong>in</strong>to an agreement<br />
<strong>for</strong> Comprehensive Annual Ma<strong>in</strong>tenance Contract, (here<strong>in</strong>after called <strong>AMC</strong>) <strong>for</strong> Post Warranty<br />
comprehensive ma<strong>in</strong>tenance <strong>of</strong> <strong>DSPT</strong>.<br />
WHEREAS, the Agreement <strong>for</strong> <strong>AMC</strong> has been prepared based on the relevant clauses <strong>of</strong> the said<br />
Bid Document Purchase Order.<br />
WHEREAS, the CONTRACTOR has agreed to fully comply with all the provisions <strong>of</strong> the Bid<br />
Document Purchase Order, <strong>in</strong>clud<strong>in</strong>g those perta<strong>in</strong><strong>in</strong>g to <strong>AMC</strong>, after mak<strong>in</strong>g himself fully aware and<br />
understand<strong>in</strong>g fully the implications <strong>of</strong> the terms and conditions and specifications mentioned there<strong>in</strong>.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
NOW the AGREEMENT WITNESSED as follows:<br />
1. Validity Period <strong>of</strong> the Contract :<br />
1.1 <strong>AMC</strong> shall come <strong>in</strong>to effect after sign<strong>in</strong>g <strong>of</strong> agreement shall rema<strong>in</strong> valid <strong>for</strong> one year &<br />
extendable <strong>for</strong> further one year on same terms & condition subject to satisfactory per<strong>for</strong>mance<br />
mutual concerned.<br />
1.2 Dur<strong>in</strong>g warranty, the CONTRACTOR shall per<strong>for</strong>m all the functions as enunciated under <strong>AMC</strong>.<br />
In case <strong>of</strong> any failure <strong>in</strong> fulfill<strong>in</strong>g contractual obligations under <strong>AMC</strong> dur<strong>in</strong>g warranty period, all<br />
penalty clauses shall be applicable under the contract. However no payments shall be made<br />
dur<strong>in</strong>g warranty period.<br />
1.3 Terms and conditions <strong>of</strong> <strong>AMC</strong> will be applicable <strong>for</strong> all <strong>DSPT</strong>.<br />
1.4 BSNL may divert <strong>DSPT</strong> from one SSA to another SSA with<strong>in</strong> the same Circle. For the <strong>DSPT</strong><br />
diverted be<strong>for</strong>e start <strong>of</strong> <strong>AMC</strong>, the <strong>AMC</strong> shall be separately applicable <strong>for</strong> the <strong>DSPT</strong> <strong>in</strong>dividually<br />
<strong>for</strong> the quantities available with each <strong>of</strong> the SSA.<br />
.<br />
2. Extension <strong>of</strong> Contract<br />
2.1 Extension <strong>of</strong> this contract beyond term <strong>of</strong> one year shall be negotiable, depend<strong>in</strong>g on the<br />
per<strong>for</strong>mance <strong>of</strong> the CONTRACTOR dur<strong>in</strong>g the term. However, it shall be optional <strong>for</strong> BSNL not<br />
to enter <strong>in</strong>to the <strong>AMC</strong> agreement further, with the CONTRACTOR.<br />
3. SCOPE OF <strong>AMC</strong> OF <strong>DSPT</strong>s<br />
3.1 The works to be carried out under <strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s will be as under:<br />
3.2 Visual Inspection on periodic basis at least once <strong>in</strong> a month <strong>for</strong> Reflector, Mount and Reflector<br />
support Structure- <strong>in</strong> case <strong>of</strong> failure, the mount members that are damaged should be repaired or<br />
replaced.<br />
3.3 Feed and Feed support- visual <strong>in</strong>spection is required to ensure that all hardware is secure and no<br />
moisture is collected <strong>in</strong>side the Feed Horn. Wash the front surface <strong>of</strong> the solar modules at least<br />
once <strong>in</strong> a month with clean water & non abrasive cloth.<br />
3.4 Check the support structure to ensure that all fix<strong>in</strong>g are tight. Touch up any scratches/ marks on<br />
the structure with suitable pa<strong>in</strong>t.<br />
3.5 Inspect the solar array cable <strong>for</strong> signs <strong>of</strong> damage <strong>of</strong> chatt<strong>in</strong>g; repair any such damage with<br />
<strong>in</strong>sulat<strong>in</strong>g tape.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
3.6 The follow<strong>in</strong>g ma<strong>in</strong>tenance should be per<strong>for</strong>med at 3 monthly <strong>in</strong>tervals <strong>for</strong> CCU.<br />
(i) Clean the enclosure us<strong>in</strong>g a s<strong>of</strong>t cloth/brush<br />
(ii) Check cables <strong>for</strong> damages or deterioration <strong>of</strong> the sheath and repair any such defect with<br />
<strong>in</strong>sulat<strong>in</strong>g tape.<br />
(iii) Verify that all cable connections are tight and corrosion free and that adequate stra<strong>in</strong><br />
relief are provided <strong>for</strong> the cables.<br />
(iv) Measure the battery, array and load voltage as described <strong>in</strong> relevant sections.<br />
3.7 Measure the voltage present at the array cable plug <strong>in</strong> term<strong>in</strong>al quarterly. Verify that this voltage<br />
is greater than 17 V. Record the voltage as the “Array Open Circuit Voltage” and keep proper<br />
record at each <strong>DSPT</strong> Site.<br />
3.8 Measure the current be<strong>in</strong>g generated by the array and record this read<strong>in</strong>g. Under bright sunny<br />
conditions the solar array should generate more than 0.5A<br />
3.9 The electricity generated by the solar module is reduced if a large amount <strong>of</strong> dust is allowed to<br />
be accumulated on the module front surface. Wash the front surface <strong>of</strong> the solar modules at least<br />
once <strong>in</strong> a month with clean water & non abrasive cloth.<br />
3.10 The battery be<strong>in</strong>g ma<strong>in</strong>tenance free does not require any rout<strong>in</strong>e ma<strong>in</strong>tenance. However, batteries<br />
are to be ensured to be kept <strong>in</strong> charged condition. If the system is not <strong>in</strong> use,still the batteries<br />
have to be charged.<br />
Hence, the solar charge controller will prevent the battery from be<strong>in</strong>g over charged and keep the<br />
battery healthy.<br />
3.11 The controller also has monitor<strong>in</strong>g po<strong>in</strong>ts to measure the load voltage, battery voltage SPV<br />
voltage, Load current, Battery current and SPV current. The current is measured across a<br />
30A/75mV shunt, hence the 25mV <strong>of</strong> read<strong>in</strong>g across the mentioned po<strong>in</strong>ts <strong>for</strong> currents will be<br />
equal to 1A. that is the scale <strong>of</strong> read<strong>in</strong>g current is 25mV/Amp. These monitor<strong>in</strong>g po<strong>in</strong>t values are<br />
approximate <strong>for</strong> reference only.<br />
3.12 The controller has a solar charge controller which will disconnect the SPV module after the<br />
battery charges to 14.1V and reconnect the SPV module when the battery voltage falls below<br />
13.6V thus keep<strong>in</strong>g the battery under float charge between 13.6V and 14.1V to be checked.<br />
3.13 Ensure the SPV module connection is firm to Array connector. Clean any evidence <strong>of</strong> corrosion<br />
<strong>of</strong> battery connections and ensure that the term<strong>in</strong>als are tight.<br />
3.14 Verify the other connection to the PCB connectors.<br />
Check the load and allow the battery to be charged adequately by solar array be<strong>for</strong>e<br />
reconnect<strong>in</strong>g.<br />
3.15 Check the SPV connection and clean the SPV panel. Charge battery to required level (<strong>for</strong> about 3<br />
days) by SPV disconnect<strong>in</strong>g the load<br />
3.16 Collect the <strong>DSPT</strong>/Equipment spare accessories from SSA Centre to replace the faulty part and<br />
return <strong>of</strong> the faulty equipment to SSA centre with proper receipt with<strong>in</strong> 3 days on receipt <strong>of</strong><br />
compla<strong>in</strong>t by the <strong>in</strong>charge <strong>of</strong> <strong>DSPT</strong>.<br />
3.17 Any other work assigned by the <strong>DSPT</strong> <strong>in</strong>charge to contractor.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
Section-V<br />
BID FORM<br />
NIT- No:- W-202/<strong>Tender</strong>/<strong>AMC</strong>-<strong>DSPT</strong>/2012- 13/ Dated at SG, 14 th Feb. 2013<br />
To<br />
The GMTD, Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
Dear Sir,<br />
1. Hav<strong>in</strong>g exam<strong>in</strong>ed the conditions <strong>of</strong> contract and specifications <strong>in</strong>clud<strong>in</strong>g addenda Nos.<br />
............................................................................, the receipt <strong>of</strong> which is hereby duly<br />
acknowledged, we, undersigned, <strong>of</strong>fer to execute the <strong>in</strong>stallation and commission<strong>in</strong>g work <strong>of</strong><br />
<strong>DSPT</strong>’s <strong>in</strong> Uttaranchal <strong>in</strong> con<strong>for</strong>mity with the conditions <strong>of</strong> contract and specifications <strong>for</strong> the<br />
sum shown <strong>in</strong> the schedule <strong>of</strong> prices attached herewith and made part <strong>of</strong> this bid.<br />
2. If our Bid is accepted, we will obta<strong>in</strong> the guarantee <strong>of</strong> a Scheduled Bank <strong>for</strong> a sum not exceed<strong>in</strong>g<br />
(10% <strong>of</strong> the contract sum) <strong>for</strong> the due per<strong>for</strong>mance <strong>of</strong> the Contract.<br />
3. We agree to abide by this bid <strong>for</strong> a period <strong>of</strong> 150 days from the date fixed <strong>for</strong> Bid open<strong>in</strong>g and it<br />
shall rema<strong>in</strong> b<strong>in</strong>d<strong>in</strong>g upon us and may be accepted at any time be<strong>for</strong>e the expiry <strong>of</strong> that period.<br />
4. Until a <strong>for</strong>mal work order <strong>of</strong> contract is prepared and executed, this Bid together with your<br />
written acceptance there<strong>of</strong> <strong>in</strong> your notification <strong>of</strong> award shall constitute a b<strong>in</strong>d<strong>in</strong>g contract<br />
between us.<br />
5. Bid submitted by us is properly sealed and prepared so as to prevent any subsequent alteration<br />
and replacement.<br />
6. We understand that you are not bound to accept the lowest or any bid, you may receive.<br />
Dated this....................... Day <strong>of</strong>................. 2013<br />
Signature <strong>of</strong> Bidder <strong>in</strong> capacity <strong>of</strong><br />
Name <strong>of</strong> the Firm with full address<br />
-------------------------------------------<br />
-------------------------------------------<br />
-------------------------------------------<br />
Telephone & Fax Nos.-<br />
Duly authorized to sign the bid <strong>for</strong> and on behalf <strong>of</strong> ____________________________________<br />
Witness _______________________________________________________________________<br />
Address _______________________________________________________________________<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION – VI<br />
TECHNICAL BID<br />
Attested Xerox copy <strong>of</strong> experience certificate<br />
issued by any telecom company <strong>of</strong> hav<strong>in</strong>g the<br />
experience <strong>of</strong> successfully complet<strong>in</strong>g <strong>in</strong>stallation<br />
01<br />
and commission<strong>in</strong>g/<strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong>s OR any<br />
satellite equipment <strong>for</strong> any Telecom Operator<br />
(copies <strong>of</strong> work order must be enclosed)<br />
Attested Xerox copy <strong>of</strong> authenticated partnership<br />
deed, <strong>in</strong> case <strong>of</strong> partnership firm and power <strong>of</strong><br />
02<br />
attorney to the representative <strong>of</strong> the firm to operate<br />
the tender.( If required )<br />
Attested Xerox copy <strong>of</strong> PAN Card. In case <strong>of</strong><br />
proprietorship PAN should be <strong>in</strong> the Individual’s<br />
03<br />
name and <strong>in</strong> case <strong>of</strong> firm/partnership the PAN <strong>in</strong><br />
firm’s name<br />
04 Attested Xerox copy <strong>of</strong> Service Tax registration<br />
Cost <strong>of</strong> tender document and EMD as per NIT <strong>in</strong><br />
favour <strong>of</strong> A.O. (cash), O/o GMTD, Sr<strong>in</strong>agar<br />
(<strong>Gwl</strong>.) <strong>in</strong> shape <strong>of</strong> A/c Payee Demand Draft /<br />
05<br />
Banker’s Cheque, BG (valid <strong>for</strong> 180 days from the<br />
date <strong>of</strong> open<strong>in</strong>g <strong>of</strong> Bid <strong>for</strong> EMD only) payable at<br />
Sr<strong>in</strong>agar (<strong>Gwl</strong>.)<br />
Certificate to the effect that no near relative <strong>of</strong> the<br />
06<br />
bidder is work<strong>in</strong>g <strong>in</strong> BSNL<br />
07 In<strong>for</strong>mation sheet about the bidder<br />
Cost <strong>of</strong> tender document <strong>in</strong> case downloaded from<br />
08<br />
website<br />
09 Pro<strong>of</strong> Document <strong>for</strong> hav<strong>in</strong>g own vehicle<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
Section VII<br />
FINANCIAL BID<br />
(Rate Sheet)<br />
(To be submitted duly filled <strong>in</strong> by the bidder separately <strong>for</strong> each zone i.e. zone-I,II&III)<br />
Zone ________<br />
Sl.No.<br />
1<br />
Description <strong>of</strong> work<br />
<strong>AMC</strong> <strong>of</strong> <strong>DSPT</strong> equipment <strong>in</strong> Sr<strong>in</strong>agar<br />
(<strong>Gwl</strong>.) SSA<br />
<strong>AMC</strong> Rate per <strong>DSPT</strong> per month<br />
(<strong>in</strong> Rs.)<br />
In figures<br />
In words<br />
Note:- Service tax will be paid extra by BSNL wherever applicable.<br />
Place –<br />
Date –<br />
Signature <strong>of</strong> the bidder<br />
With stamp<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION –VIII<br />
UNDERTAKING & DECLARATION<br />
The tenderer hereby covenants and declares that all the <strong>in</strong><strong>for</strong>mation, Documents, Xerox copies <strong>of</strong><br />
the Documents/ Certificates enclosed along with the <strong>Tender</strong> document are correct and if any th<strong>in</strong>g found<br />
false and/or <strong>in</strong>correct and/or any suppression <strong>of</strong> fact is detected at any time, tender will be term<strong>in</strong>ated<br />
and EMD/SD/Bills pend<strong>in</strong>g with Department will stand <strong>for</strong>feited to BSNL and the contractor will be<br />
debarred from participation <strong>of</strong> any tender <strong>of</strong> this Department <strong>in</strong> future.<br />
Certify the I/We read and agree with all the terms and conditions, specifications <strong>in</strong>cluded <strong>in</strong> the<br />
tender documents & <strong>of</strong>fer to execute the work at the rates quoted <strong>in</strong> the schedule. If I/We fail to enter<br />
<strong>in</strong>to the agreement & commence the work <strong>in</strong> time the EMD/SD as deposited will stand <strong>for</strong>feited to the<br />
BSNL.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION - IX<br />
PERFORMANCE SECURITY GUARANTEE (BOND FORM)<br />
In consideration <strong>of</strong> the Bharat Sanchar Nigam Ltd hav<strong>in</strong>g agreed to exempt . . . . . . . . . . . . . . . .<br />
[here<strong>in</strong>after called the "Contractor(s) "] from the demand, under the terms and conditions <strong>of</strong> an<br />
agreement/Purchaser Order) No. .. . . . . . …….. . Dated................. made between . ... . . . . . . and . . . . . .<br />
. . . . . . . . <strong>for</strong> . . . . . . . . . . . . <strong>for</strong> the supply <strong>of</strong> . . . . . . . . . . . . . . . . . . . . . . . (here<strong>in</strong>after called the "the<br />
said agreement"), <strong>of</strong> security deposit <strong>for</strong> the due fulfillment by the said Contractor (s) <strong>of</strong> the terms and<br />
conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement, on production <strong>of</strong> a bank guarantee <strong>for</strong> . . . . . . . . . . . . . . . . ..<br />
we, (Name <strong>of</strong> the Bank) . . . . . .. . . . . . . . (Here<strong>in</strong>after referred to as "the Bank") at the request <strong>of</strong> . . . . . .<br />
. . . . . . . . (contractor(s) do hereby undertake to pay to the BSNL an amount not exceed<strong>in</strong>g . . . . . . . . . . .<br />
aga<strong>in</strong>st any loss or damage caused to or suffered or would be caused to or suffered by the BSNL by<br />
reason or any breach by the said Contractor(s) <strong>of</strong> any <strong>of</strong> the terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said<br />
Agreement.<br />
2. We (Name <strong>of</strong> the Bank) . . . . . . . . . . . . . . do hereby undertake to pay the amounts due and payable<br />
under this guarantee without any demur, merely on a demand from the BSNL stat<strong>in</strong>g that he amount<br />
claimed is due by way <strong>of</strong> loss or damage caused to or would be caused to or suffered by the BSNL by<br />
reason <strong>of</strong> breach by the said contractor(s) <strong>of</strong> any <strong>of</strong> terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement<br />
or by reason <strong>of</strong> the contractor (s) failure to per<strong>for</strong>m the said Agreement. Any such demand made on the<br />
bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee where<br />
the decision <strong>of</strong> the BSNL <strong>in</strong> these counts shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the bank. However, our liability<br />
under this guarantee shall be restricted to an amount not exceed<strong>in</strong>g . . . . .. . . . . . . . .<br />
3. We undertake to pay to the BSNL any money so demanded notwithstand<strong>in</strong>g any dispute or disputes<br />
raised by the Contractor(s) / suppliers <strong>in</strong> any suit or proceed<strong>in</strong>g be<strong>for</strong>e any court or tribunal relat<strong>in</strong>g<br />
thereto our liability under this present be<strong>in</strong>g absolute and unequivocal. The Payment so made by us<br />
under this bond shall be valid discharge <strong>of</strong> our liability <strong>for</strong> payment there under and the contractor(s) /<br />
supplier(s) shall have no claim aga<strong>in</strong>st us <strong>for</strong> mak<strong>in</strong>g such payment.<br />
4. We (name <strong>of</strong> the Bank) . . . . . . . . . . further agree that the guarantee here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong><br />
full <strong>for</strong>ce and effect dur<strong>in</strong>g the period that would be taken <strong>for</strong> the per<strong>for</strong>mance <strong>of</strong> the said agreement and<br />
that it shall cont<strong>in</strong>ue to be en<strong>for</strong>ceable till all the dues <strong>of</strong> the BSNL under or by virtue <strong>of</strong> the said<br />
Agreement have been fully paid and its claims satisfied or discharged or till . . . . . . . . . . .. . . . . . . . . . . .<br />
(Office /BSNL ) . . . . . . . . . . . . . Certifies that the terms and conditions <strong>of</strong> the said Agreement have been<br />
fully and properly carried out by the said contractor(s) and accord<strong>in</strong>gly discharge this guarantee. Unless<br />
a demand or claim under this guarantee is made on us <strong>in</strong> writ<strong>in</strong>g or be<strong>for</strong>e the expiry <strong>of</strong> THREE<br />
YEARS from the date here<strong>of</strong>, we shall be discharged from all liability under this guarantee thereafter.<br />
5. We (name <strong>of</strong> the Bank) . . . . . . . . . . . . further agree with the BSNL that the BSNL shall have the<br />
fullest liberty without our consent and without affect<strong>in</strong>g <strong>in</strong> any manner our obligations hereunder to very<br />
any <strong>of</strong> the terms and conditions <strong>of</strong> the said Agreement or to extend time <strong>of</strong> per<strong>for</strong>mance by the said<br />
contractor(s) from time to time or to postpone <strong>for</strong> any time or from time to time any <strong>of</strong> the powers<br />
exercisable by the BSNL aga<strong>in</strong>st the said contractor(s) and to <strong>for</strong>bear or en<strong>for</strong>ce any <strong>of</strong> the terms and<br />
conditions relat<strong>in</strong>g to the said agreement and we shall not be relieved from our liability by reason <strong>of</strong> any<br />
such variation, or extension be<strong>in</strong>g granted to the said Contractor(s) or <strong>for</strong> any <strong>for</strong>bearance, act or<br />
omission on the part <strong>of</strong> the BSNL or any <strong>in</strong>dulgence by the BSNL to the said contractor(s) or by any<br />
such matter or th<strong>in</strong>g whatsoever which under the law relat<strong>in</strong>g to sureties would, but <strong>for</strong> this provision,<br />
have effect <strong>of</strong> so reliev<strong>in</strong>g us.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
6. This guarantee will not be discharged due to the change <strong>in</strong> the constitution <strong>of</strong> the Bank or the<br />
contractor(s) /<br />
supplier(s).<br />
7. We (Name <strong>of</strong> the Bank) . . . . . . . . . Lastly undertake not to revoke this guarantee dur<strong>in</strong>g its<br />
currency except with the previous consent <strong>of</strong> the BSNL <strong>in</strong> writ<strong>in</strong>g.<br />
Dated the . . . . . . . . . . . . . . . . date . . . . . . . . . . . . . . . . . .<br />
For . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . …..….<br />
(Indicate the name <strong>of</strong> the Bank)<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION – X<br />
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING<br />
Subject :<br />
Authorization <strong>for</strong> attend<strong>in</strong>g Bid open<strong>in</strong>g on …………………… (date) <strong>in</strong> the tender <strong>of</strong><br />
………………………………………………………………………………………………<br />
Follow<strong>in</strong>g person is hereby authorized to attend the bid open<strong>in</strong>g <strong>for</strong> the tender mentioned above on<br />
behalf <strong>of</strong> …………………………………………………….(Bidder) .<br />
Name<br />
Specimen Signature<br />
Alternate Representative<br />
Signature <strong>of</strong> Bidder<br />
Or<br />
Officer authorized to sign the Bid<br />
Document on behalf <strong>of</strong> the Bidder.<br />
Note : 1. Only one representative will be permitted to attend the Bid open<strong>in</strong>g<br />
2. Permission <strong>for</strong> entry to the hall where bids are opened may be refused <strong>in</strong> case<br />
authorization as prescribed above is not recovered.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION - XI<br />
BID SECURITY FORM<br />
Whereas ....................………………..(here<strong>in</strong>after called "the Bidder") has submitted its bid dated<br />
....................... <strong>for</strong> the work <strong>of</strong> ...................as per <strong>Tender</strong> No. ........... .............. ..............................<br />
............ KNOW ALL MEN by these Presents that WE............................... OF .................................<br />
hav<strong>in</strong>g out registered <strong>of</strong>fice at ............... (here <strong>in</strong> after called "the Bank") are bound unto<br />
............................................ (here<strong>in</strong> after called the "the Purchase") <strong>in</strong> the sum <strong>of</strong> ........................ <strong>for</strong><br />
which payment will and truly to be made <strong>of</strong> the said Purchase, the Bank b<strong>in</strong>ds itself, its successors and<br />
assigns by these presents.<br />
THE CONDITIONS <strong>of</strong> the obligation are:<br />
1. If the Bidder withdraws its bid dur<strong>in</strong>g the period <strong>of</strong> bid validity specified by the Bidder on the<br />
Bid <strong>for</strong>m; or<br />
2. If the Bidder, hav<strong>in</strong>g been notified <strong>of</strong> the acceptance <strong>of</strong> its Bid by the Purchaser dur<strong>in</strong>g the<br />
Period <strong>of</strong> Bid validity.<br />
a).<br />
b).<br />
fails, or refuses to execute the Contract, if required, or<br />
fails or refuses to furnish per<strong>for</strong>mance security, <strong>in</strong> accordance with the Instructions to<br />
Bidders.<br />
We undertake to pay to the Purchaser up to the above amount upon receipt <strong>of</strong> its first written demand,<br />
without the Purchaser hav<strong>in</strong>g to substantiate its demand, provided that <strong>in</strong> its demand, the Purchaser will<br />
note that the amount claimed by it is ow<strong>in</strong>g to the occurrence <strong>of</strong> one or all <strong>of</strong> three conditions, specify<strong>in</strong>g<br />
the occurred condition or conditions.<br />
This guarantee will rema<strong>in</strong> <strong>in</strong> <strong>for</strong>ce as specified <strong>in</strong> clauses 12 and 28.2 <strong>of</strong> section II <strong>of</strong> the Bid Document<br />
up to and <strong>in</strong>clud<strong>in</strong>g Thirty (30) days after the period <strong>of</strong> Bid validity, and any demand <strong>in</strong> respect there<strong>of</strong><br />
should reach the Bank not later than the specified date/dates.<br />
Name.....................................<br />
Signed <strong>in</strong> capacity <strong>of</strong><br />
Name <strong>of</strong> Witness<br />
Signature <strong>of</strong> Witness<br />
Address <strong>of</strong> Witness<br />
Full Address <strong>of</strong> Branch<br />
STD Code & Telephone No. <strong>of</strong> Branch<br />
FAX No. <strong>of</strong> Branch<br />
Signature & Seal <strong>of</strong> the Bank<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION - XII<br />
PROFORMA FOR NO NEAR RELATIVES CERTIFICATE IN BSNL<br />
Certificate to be given by the contractor <strong>in</strong> respect <strong>of</strong> no near<br />
relative (s) <strong>in</strong> BSNL <strong>of</strong> the contractor.<br />
I,<br />
………………………………………………………………………………………………………<br />
S/o………………………………………………………………….resident <strong>of</strong> ………………….<br />
………………………………………………………………………………………………………<br />
hereby certify that none <strong>of</strong> my near relative(s) as def<strong>in</strong>ed <strong>in</strong> the tender document is/are employed<br />
any where <strong>in</strong> BSNL as per details given <strong>in</strong> tender document. In case at any stage, it is found that<br />
the <strong>in</strong><strong>for</strong>mation given by me is false/<strong>in</strong>correct, BSNL shall have the absolute right to take any<br />
action as deemed fit, without any prior <strong>in</strong>timation to me.<br />
Signature <strong>of</strong> the tenderer with seal<br />
Note: In case <strong>of</strong> proprietorship firm, certificate will be given by the proprietor, <strong>for</strong> partnership firm,<br />
certificate will be given by all the partners and <strong>in</strong> case <strong>of</strong> Private Ltd. Company, by all the<br />
directors <strong>of</strong> the company.<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf
SECTION – XIII<br />
INFORMATION ABOUT TENDERERS<br />
************************<br />
(To be filled <strong>in</strong> and submitted by the bidder)<br />
1. NAME OF THE INDIVIDUAL/FIRM : _______________________________________<br />
2. PRESENT ADDRESS 3. PERMANENT ADDRESS<br />
________________________<br />
___________________________<br />
________________________<br />
________________________<br />
________________________<br />
___________________________<br />
___________________________<br />
___________________________<br />
Tel. No.<br />
Tel. No.<br />
3. Whether it is sole proprietor / partnership firm /<br />
Private limited company. :<br />
4. Name <strong>of</strong> the sole proprietor/<br />
Name <strong>of</strong> the partners/Name <strong>of</strong> the Director(s) :<br />
5 Name <strong>of</strong> the person authorized to enter <strong>in</strong>to<br />
and execute contract agreement and the<br />
capacity <strong>in</strong> which he is authorized (<strong>in</strong> case <strong>of</strong> partnership/private firm)<br />
6. Permanent Income Tax No.<br />
7. Whether the firm is hav<strong>in</strong>g branches at more than one place? If so details<br />
Place………………….<br />
Date ………………….<br />
Signature……………………..<br />
Name………………………….<br />
http://www.uttaranchal.bsnl.co.<strong>in</strong>/sg/ten_2_16_2_13.pdf