3.6 The follow<strong>in</strong>g ma<strong>in</strong>tenance should be per<strong>for</strong>med at 3 monthly <strong>in</strong>tervals <strong>for</strong> CCU.<br />

(i) Clean the enclosure us<strong>in</strong>g a s<strong>of</strong>t cloth/brush<br />

(ii) Check cables <strong>for</strong> damages or deterioration <strong>of</strong> the sheath and repair any such defect with<br />

<strong>in</strong>sulat<strong>in</strong>g tape.<br />

(iii) Verify that all cable connections are tight and corrosion free and that adequate stra<strong>in</strong><br />

relief are provided <strong>for</strong> the cables.<br />

(iv) Measure the battery, array and load voltage as described <strong>in</strong> relevant sections.<br />

3.7 Measure the voltage present at the array cable plug <strong>in</strong> term<strong>in</strong>al quarterly. Verify that this voltage<br />

is greater than 17 V. Record the voltage as the “Array Open Circuit Voltage” and keep proper<br />

record at each <strong>DSPT</strong> Site.<br />

3.8 Measure the current be<strong>in</strong>g generated by the array and record this read<strong>in</strong>g. Under bright sunny<br />

conditions the solar array should generate more than 0.5A<br />

3.9 The electricity generated by the solar module is reduced if a large amount <strong>of</strong> dust is allowed to<br />

be accumulated on the module front surface. Wash the front surface <strong>of</strong> the solar modules at least<br />

once <strong>in</strong> a month with clean water & non abrasive cloth.<br />

3.10 The battery be<strong>in</strong>g ma<strong>in</strong>tenance free does not require any rout<strong>in</strong>e ma<strong>in</strong>tenance. However, batteries<br />

are to be ensured to be kept <strong>in</strong> charged condition. If the system is not <strong>in</strong> use,still the batteries<br />

have to be charged.<br />

Hence, the solar charge controller will prevent the battery from be<strong>in</strong>g over charged and keep the<br />

battery healthy.<br />

3.11 The controller also has monitor<strong>in</strong>g po<strong>in</strong>ts to measure the load voltage, battery voltage SPV<br />

voltage, Load current, Battery current and SPV current. The current is measured across a<br />

30A/75mV shunt, hence the 25mV <strong>of</strong> read<strong>in</strong>g across the mentioned po<strong>in</strong>ts <strong>for</strong> currents will be<br />

equal to 1A. that is the scale <strong>of</strong> read<strong>in</strong>g current is 25mV/Amp. These monitor<strong>in</strong>g po<strong>in</strong>t values are<br />

approximate <strong>for</strong> reference only.<br />

3.12 The controller has a solar charge controller which will disconnect the SPV module after the<br />

battery charges to 14.1V and reconnect the SPV module when the battery voltage falls below<br />

13.6V thus keep<strong>in</strong>g the battery under float charge between 13.6V and 14.1V to be checked.<br />

3.13 Ensure the SPV module connection is firm to Array connector. Clean any evidence <strong>of</strong> corrosion<br />

<strong>of</strong> battery connections and ensure that the term<strong>in</strong>als are tight.<br />

3.14 Verify the other connection to the PCB connectors.<br />

Check the load and allow the battery to be charged adequately by solar array be<strong>for</strong>e<br />

reconnect<strong>in</strong>g.<br />

3.15 Check the SPV connection and clean the SPV panel. Charge battery to required level (<strong>for</strong> about 3<br />

days) by SPV disconnect<strong>in</strong>g the load<br />

3.16 Collect the <strong>DSPT</strong>/Equipment spare accessories from SSA Centre to replace the faulty part and<br />

return <strong>of</strong> the faulty equipment to SSA centre with proper receipt with<strong>in</strong> 3 days on receipt <strong>of</strong><br />

compla<strong>in</strong>t by the <strong>in</strong>charge <strong>of</strong> <strong>DSPT</strong>.<br />

3.17 Any other work assigned by the <strong>DSPT</strong> <strong>in</strong>charge to contractor.<br />