15.11.2014 Views

IBM China Services Capability

IBM China Services Capability

IBM China Services Capability

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> <strong>China</strong> <strong>Services</strong> <strong>Capability</strong><br />

Mark Zhou<br />

Integrated Technology <strong>Services</strong> Manager<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> GTS in 2007<br />

<strong>IBM</strong> Global Technology <strong>Services</strong><br />

GTS,<br />

the Collaborative Innovation Partner<br />

GTS is the leader/expert in transforming IT infrastructure to generate business advantage for growth<br />

1<br />

2<br />

3<br />

Themes<br />

“Enabling Biz Flexibility”<br />

Client Pain Points:<br />

• Align IT infra. with biz<br />

strategy<br />

“Mitigating Risk”<br />

Client Pain Points:<br />

• Make IT infra. adapt to biz<br />

change<br />

• Maintain a HA system<br />

“Optimizing IT”<br />

Client Pain Points:<br />

• Integrate legacy &<br />

heterogeneous systems<br />

• Protect IT Investment<br />

A. Partner for<br />

Innovation<br />

Abundance of resources<br />

to help you for<br />

innovative breakthrough<br />

• Global Innovation<br />

and R&D<br />

capabilities<br />

• Industry /technology<br />

partners that <strong>IBM</strong><br />

integrated<br />

• Intellectual assets<br />

as a power tool<br />

B. Authentic Blue<br />

Professionals<br />

Certified, experienced<br />

Blue professionals with<br />

expanded coverage<br />

• Certified with SI<br />

Certification and<br />

awards recognition<br />

from market<br />

• <strong>Services</strong> coverage<br />

over 20 cities in<br />

<strong>China</strong><br />

• More than 2000 <strong>IBM</strong><br />

professionals with<br />

solid skills<br />

• Global expertise &<br />

standardized<br />

services<br />

C. Localized<br />

“<strong>China</strong>” <strong>Services</strong><br />

Well-established<br />

infrastructure and team<br />

for <strong>China</strong> needs<br />

• Extensive coverage,<br />

support scheme for<br />

big and small<br />

enterprises<br />

• Experienced in<br />

helping clients in<br />

past decade<br />

• Excelled<br />

Competency<br />

cultivated by <strong>IBM</strong><br />

trainings /<br />

methodology with<br />

localized insights<br />

Benefits to Clients<br />

• Drive business model<br />

innovation<br />

• Ignite technology &<br />

business integration<br />

• Reduce operational risks<br />

• Protect vital assets and<br />

improve internal<br />

governance of legal and<br />

regulatory compliance<br />

• Increase operational<br />

leverage on IT<br />

• Optimize legacy systems<br />

4<br />

“Enhancing IT”<br />

Client Pain Points:<br />

• Complex IT project<br />

implementation<br />

Innovation<br />

IT Skills<br />

Experience<br />

• Fulfill business<br />

requirement on IT<br />

• Enable internal & external<br />

collaboration<br />

2<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Our People:<br />

Certified, experienced blue professionals<br />

3<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Global Technology <strong>Services</strong> consists of ten service product<br />

lines that address the breadth of our clients’ IT needs<br />

IT Strategy and<br />

Architecture<br />

Middleware<br />

End User<br />

Maintenance and<br />

Technical Support<br />

Provide single assess/plan<br />

capability, roadmap, and<br />

technical design for client IT<br />

environment and<br />

infrastructure<br />

Offer client services related<br />

to middleware infrastructure<br />

to unlock business potential<br />

Support the end user<br />

environment across the<br />

lifecycle and for all end user<br />

devices<br />

Integrated<br />

Communications<br />

Support services from product<br />

maintenance through solution support to<br />

maintain and improve the availability of<br />

your IT infrastructure.<br />

Design, implement, and<br />

manage networking<br />

environments/applications<br />

optimized for anytime/<br />

anywhere integrated<br />

communications<br />

Storage and Data<br />

Our clients<br />

Business Continuity<br />

and Resiliency<br />

Simplify storage and data<br />

management while enabling<br />

business growth and<br />

regulatory compliance<br />

Enable business and IT<br />

availability and continuity, for<br />

both normal day-to-day and<br />

unusual/crisis operations<br />

Server<br />

Security and Privacy<br />

Site and Facilities<br />

Optimize IT server capacity,<br />

cost, and integrity across the<br />

lifecycle –in both data<br />

centers and the field<br />

Help safeguard client<br />

information assets, anticipate<br />

future risks, and respond<br />

Help clients manage their<br />

data center and IT facilities,<br />

from plan and build out to<br />

consolidate and upgrade<br />

4<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> <strong>China</strong> Customer Support Center<br />

5<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

We have 5 Customer Support Centers in <strong>China</strong><br />

Beijing<br />

Tianjin<br />

Shanghai Pudong<br />

Shanghai CNC<br />

To be ready by year end<br />

Shenzhen<br />

6<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Table of <strong>IBM</strong> Shanghai Data Center Infrastructure & Levels<br />

Features Levels<br />

3<br />

3+<br />

4<br />

Hogan Data Centre<br />

Dual Electric Utility Feed<br />

<br />

<br />

<br />

<br />

Dual Power Path Above 600V<br />

<br />

<br />

<br />

<br />

UPS System<br />

N+1<br />

N+1<br />

2N<br />

500kVA in N+1<br />

Standby Generators<br />

N<br />

N+1<br />

N+1<br />

1,000kVA in N+1<br />

Fuel Pump Systems<br />

N+1<br />

N+1<br />

N+1<br />

<br />

Dual Power Path to PDU<br />

<br />

<br />

Dual Power Path for Dual Power Cord Loads<br />

<br />

<br />

<br />

<br />

Dual Feed CAC Units<br />

<br />

<br />

<br />

<br />

Chiller Plant – N+1 Redundancy<br />

<br />

<br />

N+1<br />

4 sets of chillers in 3+1<br />

Redundant Tower Water Make up Supply<br />

<br />

<br />

<br />

<br />

Raised Floor – CAC Units<br />

<br />

<br />

<br />

Critical Load – Cooling Systems – N+1<br />

<br />

<br />

<br />

In 5+1 configuration<br />

Automation & Monitoring<br />

<br />

<br />

<br />

<br />

Single Points of Failure Eliminated<br />

<br />

Designed, achieve on Demand<br />

7 x 24 Facility Operator Coverage<br />

<br />

<br />

<br />

<br />

Mechanical Systems – Concurrent maintenance<br />

<br />

<br />

<br />

<br />

Electrical Systems – Concurrent maintenance<br />

<br />

<br />

<br />

7<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Server Managed <strong>Services</strong><br />

Hotline <strong>Services</strong><br />

• 24x7 single point of contact<br />

• Technical assistance and onsite operation<br />

Security <strong>Services</strong><br />

Network<br />

Management<br />

<strong>Services</strong><br />

Backup and<br />

Restore <strong>Services</strong><br />

System Administration<br />

and Operation <strong>Services</strong><br />

Network<br />

Monitoring <strong>Services</strong><br />

• Physical security control<br />

• Logic access control<br />

• System security services<br />

• Managed security services<br />

• Monitor availability<br />

• Backup/restore setting<br />

• Scanning switch<br />

• Policy design<br />

• Daily Operation<br />

• Report<br />

• Ping<br />

• Threshold<br />

• Report<br />

• Server installation<br />

• OS installation<br />

• Network installation<br />

Server<br />

Management<br />

<strong>Services</strong><br />

Server<br />

Monitoring <strong>Services</strong><br />

• Platform support<br />

• Patch installation<br />

• Performance mgmt<br />

• Capacity planning<br />

• System administration<br />

• Trouble ticket system<br />

• Ping/URL/<br />

Threshold/Process<br />

• Report<br />

<strong>Services</strong><br />

Management<br />

<strong>Services</strong><br />

• Problem<br />

Management<br />

• Change<br />

Management<br />

• <strong>Services</strong> Level<br />

Management<br />

Asset Management<br />

• HW asset tracking<br />

• SW asset tracking<br />

• Reporting<br />

Data Center Infrastructure<br />

8<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

A Chian Local Super Market --- Supply Chain Management<br />

System Hosting<br />

• Industry: Distribution<br />

• Country: <strong>China</strong><br />

• XXX Supermarket Holdings Co., Ltd. is<br />

the largest retailer in <strong>China</strong>.<br />

Company Challenges<br />

• Unhealthy composition of revenues<br />

• High competition from foreign players<br />

• Encounter the bottleneck of sustaining the<br />

growth and leading position<br />

• Big international retail groups such as Walmart<br />

and Carrefour have built their own<br />

powerful supply chain management<br />

platforms<br />

• Customer needs to implement its crossregional<br />

development strategy, and<br />

improve its operational and management<br />

efficiency<br />

<strong>IBM</strong> Solution<br />

• 6-year Hosting project, server hosted in <strong>IBM</strong> Managed<br />

Shanghai CNC IDC<br />

• Full Managed Server Support<br />

• Server threshold monitoring / performance management<br />

and capacity planning<br />

• Backup / restore design, implement and operation<br />

• DB2 administration, WebSphere middleware support<br />

• Network threshold monitoring and internet VPN mgmt<br />

Benefit<br />

• Increase the accuracy and timeliness of information exchange<br />

on “placing order-supplying goods-checking accounts”, and the<br />

sales/inventory data can be accessed by suppliers<br />

transparently, therefore the operational cost is greatly reduced,<br />

efficiency and productivity is highly enhanced.<br />

• <strong>Capability</strong> of supporting sustaining growth – the SCM platform<br />

is capable of processing over RMB70 billion (est.) of<br />

transaction vol.<br />

9<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

BCRS Managed <strong>Services</strong><br />

BCRS Consultant<br />

‣ Risk Analysis / Business Impact Analysis / Recoverability Analysis<br />

‣ Disaster Recovery Strategy & Solution Design<br />

‣ Disaster Recovery Plan & Maintenance<br />

BCRS Managed <strong>Services</strong> – Dedicated Mode<br />

‣ Dedicated equipment and environment at <strong>IBM</strong> Support Center (equipment can be<br />

owned by <strong>IBM</strong> or customer)<br />

‣ Provide consultant, design, implementation, maintenance, operation, and project<br />

management services<br />

‣ Data backup thru network connection (customer to sign a separate contract with<br />

Teleco provider)<br />

‣ 24x7 operation and helpdesk services<br />

BCRS Managed <strong>Services</strong> – Shared Mode<br />

‣ Disaster recovery equipment (server, storage, tape library, networking, seats, etc) is<br />

shared among client.<br />

‣ Price is much cheaper than dedicated mode; first come first serve.<br />

‣ Use tape for recovery.<br />

‣ Basic services not including consultant, disaster recovery planning (DRP), <strong>IBM</strong> offers<br />

shared mode equipment, seats, fix hours drill test and disaster usage, fee services is<br />

available for additional hours.<br />

10<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<br />

DR <strong>Services</strong> – (Share mode))<br />

<br />

<strong>IBM</strong><br />

<br />

<strong>Services</strong><br />

Provide DR facilities<br />

within 24 hours<br />

DR Center<br />

<strong>IBM</strong> Customer Support Center<br />

Beijing BDA, Yi Zhuang, Beijing.<br />

Drill Support <strong>Services</strong><br />

48 hours drill every year.<br />

Machines for recovery<br />

ServeriSeries * 1<br />

pSeries * 1<br />

xSeries * 4<br />

StorageDS4200<br />

Tape LibTS3200<br />

Data backup<br />

Data back up solution<br />

Workplace Recover<br />

18 seats<br />

Convenient lodge and Transportation<br />

11<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Network, Site and Facility<br />

12<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Qualification and Certification in Intelligent Building Market<br />

• <strong>IBM</strong> global service china<strong>IBM</strong> IT infrastructure and architecture service adhere to<br />

integrating information technology and customer business value . Provide solution for<br />

network, cabling, datacenter, intelligent building or manufacture site.<br />

• By now<strong>IBM</strong> in <strong>China</strong> completed many huge system integration, and obtained intelligent<br />

building profession design class A certification. Construction intelligent chemical project<br />

contract Class 2 certification( Electronic project contract Class 3 certification) and<br />

Information industry department Class 2 integration certification.<br />

13<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

e-Workplace solution<br />

e-WorkPlace Solutions<br />

Support office<br />

Shared office<br />

Satellite office<br />

Private<br />

workspace<br />

Collaboration space<br />

Data center<br />

Free address seat<br />

<br />

Solution Space<br />

Network<br />

Home office<br />

Smart Home<br />

KN work seat<br />

(concentration)<br />

Work/life support space<br />

(common space)<br />

On-demand workplace<br />

Mobile<br />

environment<br />

Knowledge DB<br />

e-Environmental Solutions<br />

Physical e-Place<br />

Virtual e-Place<br />

14<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

e-Factory Solution and sub-systems<br />

• LAN —factory office automation, manufacture, industry control management<br />

system platform.<br />

• Green data center<br />

• Cabling<br />

• IP telephone and PABX<br />

• Wireless system<br />

• Power monitoring system<br />

• Security system<br />

- Access door control and work attendance.<br />

- Factory perimeter and infrared alarm system<br />

- CCTV monitoring and Critical manufacturing area CCTV<br />

• Facility equipment control system such as FMCS or BMS.( Control air<br />

conditioning ,exhaust ,process cooling water, chiller, ultra water system, waste<br />

water, gas)<br />

• Intelligent integration management system.<br />

15<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

e-Factory system Architect<br />

16<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Network Service Introduction in <strong>China</strong><br />

• Before 1999, <strong>IBM</strong> sales itself network products mainly.<br />

• After 1999, Focus on providing solution and integration.<br />

• Over 10,000+network experts, designers and deliver engineers in the world<br />

• In <strong>China</strong> <strong>IBM</strong> network service reaches 0.4billion RMB per year, over 100<br />

contracts per year.<br />

• In <strong>China</strong> maintain 45000 network equipment. Cisco equipment occupies 40000<br />

• 2004/2007 year – Cisco Asia pacific best integrator.<br />

17<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> ACS Series Products<br />

<strong>IBM</strong> ACS takes response to European Union environment<br />

specification actively. <strong>IBM</strong> ACS products meet the restriction of the<br />

use of certain hazardous substances RoHSThe Restriction of<br />

the use of certain hazardous substances in electrical and<br />

electronic equipment <br />

<strong>IBM</strong> ACS successful cases<br />

Shanghai SECCO petrol 10000 points<br />

Yang Zi-BASF fiber backbone 76 KM<br />

Bank of <strong>China</strong> 13000 points<br />

Capital international airport 13000 points<br />

Shanghai Pudong international airport phase II 30000 points<br />

Shenzhen city plaza 24000 points<br />

Shanghai world finance center 10000 points<br />

SuZhou telecommunication center building 12000 points<br />

Shenzhen Huawei R&D center 44000 points<br />

Daya power plant 12000 points<br />

<strong>China</strong> Petroleum headquarter over 20000 points, 5000 points on the table<br />

18<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> <strong>China</strong> Unified Communication Case: Audio(IP telephone), Data, Video<br />

Applications<br />

Lotus Notes<br />

Intranet LDAP Portal<br />

Integrating voice,<br />

video, and<br />

collaboration on<br />

the desktop<br />

Any HTML Document<br />

Click to Call a Notes sender<br />

Click to Call anyone<br />

in BluePages<br />

Lotus Sametime<br />

Click to Call a<br />

document author<br />

Click to Call anyone<br />

in Sametime<br />

19<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Infrastructure Virtualization<br />

20<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

PC Server Virtualization Solution<br />

Solution<br />

• 4-way Virtual SMP allows single virtual<br />

machine to use up to four processors<br />

simultaneously<br />

• Extended memory for virtual machines – up to<br />

16GB RAM per VM<br />

Customer Value:<br />

‣ Lower cost<br />

‣ Better utilization<br />

‣ Easier management<br />

• Performance improvements across the board -<br />

up to 50% better for targeted workloads<br />

21<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Virtual client computing – the difference from desktops<br />

Client<br />

OS / App<br />

Image<br />

Client<br />

OS / App<br />

Image<br />

Enterprise<br />

Servers<br />

Client<br />

OS / App<br />

Image<br />

Desktop Clients<br />

Computing resources and<br />

applications are no longer<br />

tied to a location, a device or<br />

a user<br />

22<br />

| 13 December 2007<br />

Client<br />

OS / App<br />

Image<br />

Client<br />

OS / App<br />

Image<br />

Client<br />

OS / App<br />

Image<br />

Enterprise<br />

Servers<br />

Mouse clicks &<br />

keyboard strokes<br />

Existing cabling and<br />

Network Infrastructure<br />

Thin Clients<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> Virtual Infrastructure Access is a key component within<br />

the user platform environment—a “virtualized client” service<br />

Mobile and wireless<br />

Provides real-time, convenient access using a<br />

wide range of device and network types<br />

Portals<br />

Delivers a single point of personalized access to<br />

applications, content, processes and people<br />

Partners<br />

Suppliers<br />

Rich<br />

clients<br />

Transaction<br />

workers<br />

Developers<br />

Virtualized client and desktop management<br />

Proactively manages a diverse desktop environment through serverbased<br />

client technology<br />

Collaboration<br />

Simplifies customer, employee, supplier and<br />

partner interaction with content, applications<br />

and people to improve communication<br />

23<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> ISS Security <strong>Services</strong><br />

24<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

What set’s <strong>IBM</strong> ISS Managed <strong>Services</strong> Apart?<br />

7 Security<br />

Operations<br />

Centers<br />

6 Security<br />

Research<br />

Centers<br />

+ +<br />

133<br />

Monitored<br />

Countries<br />

15,200+<br />

managed<br />

devices<br />

2200+ MSS<br />

Customers<br />

world wide<br />

+ + +<br />

400,000,000<br />

Events per<br />

day<br />

Zurich, CH<br />

Brussels, BE<br />

Toronto, CA<br />

Alamden, US<br />

Boulder, US<br />

Detroit, US<br />

TJ Watson, US<br />

Tokyo, JP<br />

Tokyo, JP<br />

Atlanta, US<br />

Haifa,IL<br />

New Delhi, IN<br />

Brisbane, AU<br />

25<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

<strong>IBM</strong> ISS X-Force Security Research & Development<br />

• Over 100 dedicated security engineers<br />

• Independent and unbiased trusted advisor<br />

• World’s largest proprietary security knowledge<br />

base<br />

• Regular X-Press Updates (XPUs)<br />

• Threat Intelligence<br />

• Supports <strong>IBM</strong> ISS’ Professional and Managed<br />

<strong>Services</strong><br />

• Emergency Response (ERS)<br />

• Advanced research programs<br />

• Security advisory services and media alerts<br />

26<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Virtual Security Operations Center (VSOC)<br />

27<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

BlueExpress Service Introduction<br />

28<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

BlueExpress is taking critical service delivery responsibility<br />

GTS<br />

Global Technical<br />

<strong>Services</strong><br />

Delivery<br />

HVP<br />

High Volume<br />

Product<br />

PC<br />

x-Series<br />

p-Series<br />

POS<br />

ATM<br />

DMS<br />

Blue Express<br />

29<br />

© Copyright <strong>IBM</strong> Corporation 2007


30<br />

<strong>IBM</strong> Global Technology <strong>Services</strong><br />

BlueExpress – <strong>Services</strong> Location Coverage<br />

BE has 200 services Centers with service coverage capability of 2000+ cities nationwide<br />

Blue Express Service Stations<br />

Northwest Area<br />

St at i on Pr op St af f<br />

Xi ' an M G P 10/ 3<br />

Lanzhou M 6/ 1<br />

Ur umqi M S 6/ 1<br />

Xi ' ni ng M 6/ 2<br />

Yi nzhou M 5/ 2<br />

Southwest Area<br />

St at i on Pr op Staff<br />

Chengdu 1 M P 12/ 1<br />

Chengdu 2 M 5/ 1<br />

Gui yang 2 M 12/ 2<br />

Chongqi ng M 9/ 1<br />

Xi c hang M 3/ 1<br />

Xi z ang X 4/ 1<br />

Gui yang 2 M 3/ 1<br />

South Area<br />

200 Total<br />

Golden Station<br />

Silver Station<br />

Standard Station<br />

Service Station<br />

St at i on Pr op St af f<br />

Guangzhou 1 M P 12/ 1<br />

Guangzhou 2 M 6/ 1<br />

Guangzhou 3 X 5/ 1<br />

Guangzhou 4 M 3/ 1<br />

Huai hua M 3/ 1<br />

Ma o mi n g M 3/ 1<br />

Zhaoqi ng M 3/ 1<br />

Zhuhai X 3/ 1<br />

Shenzhen 1 M 3/ 1<br />

Shenzhen 2 M 3/ 1<br />

Li uzhou M 5/ 1<br />

Nanni ng M 7/ 1<br />

Hengyang M 2/ 1<br />

Shant ou M 5/ 1<br />

Zhuzhou M 3/ 1<br />

Shaoguan M 4/ 1<br />

Hai k ou X 6/ 2<br />

Gui zhou M 2/ 1<br />

Parts Centre<br />

XJ<br />

XZ<br />

Urumqi<br />

Lhasa<br />

| 13 December 2007<br />

North Area<br />

St at i on Pr op St af f<br />

Northeast<br />

Beijing 1 M G P 28/ 4<br />

St at i on Pr op St af f<br />

Beijing 2 X 2/ 1<br />

Shenyang 1 M G P 7/ 1<br />

Beijing 3 M 11/ 2<br />

Shenyang 2 M 4/ 1<br />

Beijing 4 X 7/ 1<br />

Shenyang 3 X 4/ 1<br />

Beijing 5 M 5/ 1<br />

Dalian<br />

Har bi n 1<br />

M<br />

M G<br />

7/ 1<br />

6/ 2<br />

Qiqihaer<br />

Beijing 7<br />

Jiamu Tianjin s i<br />

M<br />

M<br />

3/ 1<br />

11/ 2<br />

Daqing<br />

Zhengzhou 1 M 1<br />

Har bi n 2 M 3/ 1<br />

HLJ<br />

Mudanj i ang M 2/ 1<br />

Zhengzhou 2 M 4/ 2<br />

Harbin Mudanjiang<br />

Ji amusi M 3/ 1<br />

Ji ' nan 1 M 7/ 2<br />

Ji ' nan 2 M 8/ 1<br />

Qi qi haer M 6/ 1<br />

Hulunbeier JL<br />

Tai yuan M 10/ 1<br />

Changchun M 4/ 1<br />

Ji lin<br />

Changchun Tumen Dat ong M 3/ 1<br />

Jilin M 4/ 2<br />

Tumen M 2/ 1<br />

Tongliao<br />

Shi j i azhuang M 10/ 1<br />

Li nf en M 5/ 1<br />

Dandong M 4/ 1<br />

LN Shenyang<br />

Huhehot M 6/ 1<br />

Ji nzhou M 4/ 1<br />

HB<br />

Jinzhou<br />

NMG<br />

Dandong<br />

Luoyang M 2/ 1<br />

Hulunbeier M 2/ 1 Huhehot<br />

Datong BJ<br />

Dalian<br />

Qi ngdao M 4/ 1<br />

Daqi ng M 2/ 1<br />

QH<br />

Tongliao SX<br />

Shijiazhuang<br />

Yant ai M 3/ 1<br />

GS<br />

M 3/ 1<br />

Yinzhou<br />

Zibo Yantai<br />

Wei f ang M 2/ 1<br />

NX SX<br />

Taiyuan<br />

Weifang<br />

Tianjin<br />

Linfen<br />

SD<br />

Zi bo M 2/ 1<br />

Lanzhou<br />

Ji'n an<br />

Qingdao<br />

East Area X 18<br />

Xi'ning<br />

St at i on Pr op St af f<br />

Weifang<br />

Zhengzhou<br />

Yueyang M 2/ 1<br />

Xuzhou<br />

Huai hua M 3/ 1<br />

HN<br />

JS<br />

Xi'an<br />

AH<br />

Shanghai 1 M G P 19/ 0<br />

BF<br />

Nanjing<br />

Ankang<br />

Shanghai 2 M 3/ 1<br />

Luoyang<br />

Wuxi<br />

Chengdu<br />

Xiangfan Hefei<br />

Shanghai 3 X 6/ 2<br />

Chongqing<br />

SH<br />

HB<br />

Suzhou<br />

SC<br />

Wuhan<br />

ZJ Hangzhou<br />

Ningbo<br />

Shanghai 4 X 8/ 2<br />

Yueyang<br />

Shanghai Pudong M 3/ 1<br />

Xichang<br />

Nanchang<br />

Changsha<br />

Changzhou<br />

Nanj i ng 1 M G 16/ 1<br />

Jinhua<br />

HN<br />

Nanping<br />

Nanj i ng 2 M 7/ 2<br />

GZ<br />

Luodi<br />

JX<br />

Wenzhou<br />

Hangzhou M 13/ 1<br />

Yueyang Hengyang Yongan<br />

FJ<br />

Guiyang<br />

Fuzhou<br />

Bangf u M 6/ 2<br />

Huaihua<br />

Xuzhou M 4/ 1<br />

YN Kunming<br />

Shaoguan Xiamen<br />

GD<br />

Hef ei M 3/ 1<br />

Kaiyuan<br />

GX<br />

TW<br />

Liuzhou<br />

Huizhou<br />

Shantou<br />

Wuxi M 6/ 1<br />

Nanning GZ<br />

Zhuhai<br />

Suzhou M 5/ 1<br />

Maoming SZ HK<br />

Ni ngbo X 5/ 1<br />

Fu Jian Area<br />

Yun Nan Area X<br />

Changzhou X 3/ 1<br />

5<br />

HN<br />

Haikou St at i on Pr op St af f<br />

Ji Central nhua Area X 9<br />

M 3/ 1<br />

St at i on Pr op Staff<br />

Nanchang M 3/ 1<br />

Fuz hou M P 7/ 1<br />

Kunmi ng 1 M P 4/ 1<br />

St at i on Pr op St af f<br />

Property:<br />

Xi amen M 3/ 1<br />

Kunmi ng 2 M 2/ 1<br />

M= MOR G= Golden<br />

Wuhan M G P 10/ 1<br />

Yongan M 2/ 1<br />

Kai y uan M 2/ 1<br />

X= Non-MOR S= Silver<br />

Changsha 1 M 7/ 1<br />

P= Parts Centre X 9<br />

Nanpi ng M 2/ 1<br />

Changsha 2 X 7/ 2<br />

Yuy ang M 2/ 1<br />

Xi angf an M 2/ 1<br />

Ank ang M 2/ 2<br />

Nanchang M 7/ 1<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

BlueExpress – Trained and Certified Engineers<br />

20 Top Technical<br />

Support Engineers<br />

Tech<br />

Support<br />

130 Engineers Certified<br />

PSS/MCSE/UNIX<br />

Certify<br />

500 Engineers Certified<br />

Professional <strong>Services</strong><br />

2000+ Engineers Certified<br />

Common Technical Skills<br />

31<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Desktop Support Service<br />

Set Service Baseline<br />

• How many Desktop / Notebook<br />

are in customer site?<br />

• Related peripherals<br />

Current Volume<br />

• How many PC do you have?<br />

• Related peripherals<br />

• How many site/locations<br />

Helpdesk<br />

Perform Task<br />

• Desktop/ Notebook Support<br />

• PC peripheral Support<br />

• IMAC<br />

• VIP Support<br />

• Vendor / Maintenance Coordination<br />

• Asset Management<br />

Onsite<br />

Support<br />

- Desktop / Notebook<br />

- PC peripheral<br />

- Standard Software List<br />

- Vendor / Maintenance<br />

Coordination<br />

<strong>IBM</strong> On-Site Support<br />

Team (how many?)<br />

Customer site 1<br />

Customer site 2<br />

Customer site 3<br />

Customer site 4<br />

Customer site …..<br />

IMAC<br />

Asset<br />

management<br />

- Install<br />

- Move<br />

- Add<br />

- Change<br />

- Update Asset Database<br />

32<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

BlueExpress - <strong>Services</strong> Awards<br />

• 2006 “The Most Valuable IT Service Provider in <strong>China</strong>”“The Most Competitive 3rd Party IT<br />

Service Brand in <strong>China</strong>”, “A Gold Medal with Customer Satisfaction for IT Outsourcing<br />

<strong>Services</strong> in <strong>China</strong>”, and “Gold Medal with Customer Satisfaction for POS <strong>Services</strong> in china by<br />

CCID.<br />

• 2005 “The most competitive Third Party Service Brand in <strong>China</strong>”, and “The Best Satisfaction<br />

Prize of IT management services franchised Chains ” in “2005 <strong>China</strong> IT Service Annual<br />

Conference” sponsored by CCID.<br />

• 2004 “The most competitive IT support and maintenance service brand in <strong>China</strong>”, “The Best<br />

Satisfaction Prize of Desktop PC in user services” and “The Best Satisfaction Prize of<br />

Notebook in user service ” in “2004 <strong>China</strong> IT Service Annual Conference” sponsored by CCID.<br />

• 2003 “Best IT Support and Maintenance Award” ;”Best IT Service Customer Sat. Award”<br />

• 2002 “Excellent Professional Service Provider Prize” sponsored by CCID; “Best User Service<br />

Satisfaction Prize” of Thinkpad and POS products.<br />

33<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007


<strong>IBM</strong> Global Technology <strong>Services</strong><br />

Some of Our Customers<br />

34<br />

| 13 December 2007<br />

© Copyright <strong>IBM</strong> Corporation 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!