<strong>City</strong> <strong>of</strong> <strong>Oxnard</strong> | <strong>Bicycle</strong> <strong>and</strong> <strong>Pedestrian</strong> <strong>Master</strong> <strong>Plan</strong><br />

Existing<br />

Existing<br />

Meets<br />

Route<br />

Between<br />

Direction<br />

<strong>Bicycle</strong> Lane<br />

With/On<br />

Parking<br />

Bike<br />

Lane<br />

Width<br />

(ft)<br />

Bike<br />

Lane<br />

Length<br />

(ft)<br />

St<strong>and</strong>ard<br />

(Preferred<br />

or Min.<br />

Design)<br />

Comments/<br />

Recommendations<br />

minimum design.<br />

Estimate<br />

Cost<br />

Pacific Avenue Statham Boulevard Wooley Road<br />

Pacific Avenue Statham Boulevard Emerson Avenue NB No On-Street Parking 8 to 12 796<br />

Pacific Avenue Emerson Avenue Beacon Place NB No On-Street Parking 12 614<br />

Pacific Avenue Beacon Place Westar Drive NB No On-Street Parking 12 709<br />

Pacific Avenue Westar Drive Titan Place NB No On-Street Parking 12 958<br />

Pacific Avenue Titan Place Wooley Road NB No On-Street Parking 12 377<br />

Pacific Avenue Wooley Road Statham Boulevard<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design. $16,800<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design.<br />

Construct <strong>Bicycle</strong> Lane per A.3.4. at<br />

Beacon Place. Will require two-way<br />

left turn lane reduction or removal. $22,200<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design.<br />

Construct <strong>Bicycle</strong> Lane per A.3.4. at<br />

Westar Drive. Will require two-way<br />

left turn lane reduction or removal. $22,200<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design.<br />

Construct <strong>Bicycle</strong> Lane per A.3.4. at<br />

Titan Place. Will require two-way left<br />

turn lane reduction or removal. $25,250<br />

Median or sidewalk reduction<br />

required to meet A.3.4. at Wooley<br />

Road.<br />

Alta <strong>Plan</strong>ning + Design | C-25