16.11.2014 Views

Design Build Contract Template - The City of San Antonio

Design Build Contract Template - The City of San Antonio

Design Build Contract Template - The City of San Antonio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.4 <strong>The</strong> <strong>Design</strong>-<strong>Build</strong>er shall submit the <strong>Design</strong> Documents to Owner and obtain Owner’s<br />

acceptance and approval <strong>of</strong> the <strong>Design</strong> Documents at the percentage <strong>of</strong> completion levels<br />

stated in Section 4.1 herein. <strong>Design</strong>-<strong>Build</strong>er shall submit two full size and two half size<br />

sets <strong>of</strong> the <strong>Design</strong> Documents and two sets <strong>of</strong> any accompanying reports. All models and<br />

other related documents also shall be provided to Owner in electronic format<br />

4.5 Upon acceptance, review and final approval <strong>of</strong> said <strong>Design</strong> Documents, <strong>Design</strong>-<strong>Build</strong>er<br />

shall provide and submit to Owner the following:<br />

4.5.1 <strong>Design</strong>-<strong>Build</strong>er shall submit Three (3) sets <strong>of</strong> approved Plans and<br />

Specifications addressed to <strong>City</strong> Engineer’s Office; for <strong>City</strong>’s Engineer,<br />

and Project Manager.<br />

4.5.2 <strong>Design</strong>-<strong>Build</strong>er shall deliver one (1) set <strong>of</strong> approved Plans and<br />

Specifications in electronic format (PDF format) to Owner’s Plans and<br />

Records Office c/o CIMS <strong>Contract</strong> Services.<br />

4.5.3 <strong>The</strong> <strong>Design</strong>-<strong>Build</strong>er shall submit the Permit Application, signed and sealed<br />

Construction Document Drawings, Specifications, Special Inspection<br />

letter and copies <strong>of</strong> the site survey, geotechnical report, Environmental<br />

Clean Letter, and any other documents required, to Owner <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />

Planning and Development Services Department for the building permit.<br />

<strong>Design</strong>-<strong>Build</strong>er shall respond to questions from the Planning and<br />

Development Services Department and shall be responsible for receipt <strong>of</strong><br />

all required permits. Permit fees shall be paid by Owner. Any additional<br />

review fees required due to improper submittal will be the responsibility<br />

<strong>of</strong> <strong>Design</strong>-<strong>Build</strong>er.<br />

ARTICLE V<br />

CONSTRUCTION SERVICES<br />

5.1 General Intent. <strong>Design</strong>-<strong>Build</strong>er shall perform all Construction Work necessary to<br />

construct the Project in accordance with this <strong>Contract</strong> and to render the Project and all its<br />

components operational and functionally and legally usable for their intended purpose.<br />

5.2 <strong>The</strong> <strong>Design</strong>-<strong>Build</strong>er shall ensure that the Engineer <strong>of</strong> Record and/or the Engineering<br />

Representative make periodic visits to the site to ensure that all facilities have been<br />

constructed in strict compliance with the Construction Documents and endeavor to guard<br />

Owner against defects in the work.<br />

ARTICLE VI<br />

TIME FOR CONSTRUCTION: THE CONTRACT TIME<br />

6.1 Work Progress Schedule. <strong>Design</strong>-<strong>Build</strong>er shall submit <strong>Design</strong>-<strong>Build</strong>er’s Work Progress<br />

Schedule for the Construction Work no later than ten (10) calendar days after the effective<br />

<strong>Design</strong>-<strong>Build</strong> Services for Las Moras Prefabricated Metal Facility<br />

Page 12 <strong>of</strong> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!