16.11.2014 Views

Design Build Contract Template - The City of San Antonio

Design Build Contract Template - The City of San Antonio

Design Build Contract Template - The City of San Antonio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

completion <strong>of</strong> the Construction Work, including Project construction and payment to<br />

<strong>Design</strong>-<strong>Build</strong>er, as designed and in accordance with this <strong>Contract</strong>, liability for and payment<br />

<strong>of</strong> such additional amounts shall be the sole responsibility <strong>of</strong> <strong>Design</strong>-<strong>Build</strong>er and its<br />

<strong>Contract</strong> Surety herein, and Owner never shall be liable for same. <strong>Design</strong>-<strong>Build</strong>er's<br />

absolute responsibility for the completion <strong>of</strong> the Project, in accordance with the <strong>Contract</strong><br />

Documents/Plans/Specifications, within the agreed cost constraints, as well as <strong>Design</strong>-<br />

<strong>Build</strong>er's <strong>Contract</strong> to bear all costs in excess <strong>of</strong> the approved Fixed Price without recourse<br />

to Owner if such excess costs are necessary for the completion <strong>of</strong> the Construction Work,<br />

shall be incontrovertible and undisputable, and shall take precedence over all other terms<br />

and provisions <strong>of</strong> this <strong>Contract</strong> and the Exhibits hereto, no part <strong>of</strong> which shall be deemed to<br />

alter, diminish or waive such obligations.<br />

GUARANTEED MAXIMUM PRICE OPTION<br />

8.4 <strong>Contract</strong> Price. <strong>The</strong> <strong>Contract</strong> Price is the Not-to-Exceed amount <strong>of</strong><br />

__________________________ and ZERO/100 Dollars ($_________________.00), shall<br />

consist <strong>of</strong> the <strong>Design</strong> Services Fee and the Guaranteed Maximum Price (GMP) for<br />

Construction work, as set out herein. <strong>The</strong> quantities <strong>of</strong> the various elements <strong>of</strong> the Work to<br />

be done and material to be furnished are determined by <strong>Design</strong>-<strong>Build</strong>er. It is expressly<br />

understood and agreed by Owner and <strong>Design</strong>-<strong>Build</strong>er that the <strong>Contract</strong> Price, including<br />

authorized adjustments, is the total amount payable by Owner to <strong>Design</strong>-<strong>Build</strong>er and shall<br />

cover the cost for all design and all Work required to complete the Project in accordance<br />

with the <strong>Contract</strong> Documents, regardless <strong>of</strong> what the final measurement <strong>of</strong> quantities is<br />

determined to be.<br />

8.5 <strong>The</strong> GMP is intended to address all items for the performance <strong>of</strong> all design and<br />

Construction Work required by the <strong>Contract</strong>, and the performance <strong>of</strong> all other requirements<br />

<strong>of</strong> this <strong>Contract</strong>, to include preconstruction services fees, design costs, General Conditions<br />

costs, Pass Through costs, assumptions, Owner-controlled contingencies, schedules and<br />

other matters necessary and relevant for proper execution and completion <strong>of</strong> the Work for<br />

the GMP. <strong>Design</strong>-<strong>Build</strong>er shall provide a fully functional and operational facility as<br />

intended in the GMP.<br />

8.6 <strong>The</strong> GMP shall adopt and incorporate all <strong>of</strong> the terms and conditions <strong>of</strong> this <strong>Contract</strong> and all<br />

other documents that comprise the <strong>Contract</strong> between the Owner and <strong>Design</strong>-<strong>Build</strong>er. Any<br />

exceptions to or modifications <strong>of</strong> such terms and conditions proposed by <strong>Design</strong>-<strong>Build</strong>er in<br />

the GMP shall not be effective unless they are expressly stated and conspicuously<br />

identified in the GMP and specifically are accepted and approved by Owner.<br />

8.6.1 <strong>The</strong> GMP shall consist <strong>of</strong> the Cost <strong>of</strong> <strong>Design</strong> Services and the Cost <strong>of</strong> the<br />

Construction Work, as defined in the <strong>Contract</strong>, plus <strong>Design</strong>-<strong>Build</strong>er’s Management<br />

Fee, which is ____________________________ and ZERO/100 Dollars<br />

($_____________.00). Owner agrees to perform its responsibilities so as to assist<br />

<strong>Design</strong>-<strong>Build</strong>er to facilitate the completion <strong>of</strong> the Construction Work and represents<br />

to <strong>Design</strong>-<strong>Build</strong>er that there will be sufficient funds available to pay <strong>Design</strong>-<strong>Build</strong>er<br />

up to the GMP <strong>of</strong> ________________________________ZERO/100 Dollars<br />

($_______________.00), as adjusted by any Change Order. <strong>The</strong> GMP, unless<br />

<strong>Design</strong>-<strong>Build</strong> Services for Las Moras Prefabricated Metal Facility<br />

Page 18 <strong>of</strong> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!