9.16.2 the quantity <strong>of</strong> <strong>Design</strong>-<strong>Build</strong>er's <strong>Design</strong> Services and/or Construction Work not<br />
being as represented in <strong>Design</strong>-<strong>Build</strong>er's pay request, or otherwise;<br />
9.16.3 <strong>Design</strong>-<strong>Build</strong>er's rate <strong>of</strong> progress being such that, in Owner's opinion, Substantial<br />
Completion, Final Completion or both may inexcusably be delayed;<br />
9.16.4 <strong>Design</strong>-<strong>Build</strong>er's failure to use <strong>Contract</strong> funds, previously paid to <strong>Design</strong>-<strong>Build</strong>er<br />
by Owner, to pay <strong>Design</strong>-<strong>Build</strong>er's Project-related obligations including, but not<br />
limited to, Sub-Consultants, Subcontractors, laborers and material and equipment<br />
Suppliers;<br />
9.16.5 evidence that the balance <strong>of</strong> the Construction Work cannot be completed, in<br />
accordance with the <strong>Contract</strong>, for the unpaid balance <strong>of</strong> the <strong>Contract</strong> Price;<br />
9.16.6 claims made, or likely to be made, against Owner or its property;<br />
9.16.7 loss or damage caused by <strong>Design</strong>-<strong>Build</strong>er;<br />
9.16.8 <strong>Design</strong>-<strong>Build</strong>er's failure or refusal to perform any <strong>of</strong> its obligations to Owner; or<br />
9.16.9 any other basis for withholding <strong>of</strong> payment specified in the General Conditions.<br />
In the event that Owner makes written demand upon <strong>Design</strong>-<strong>Build</strong>er for amounts<br />
previously paid by Owner, as contemplated in this Section 9.15, <strong>Design</strong>-<strong>Build</strong>er promptly<br />
shall comply with such demand.<br />
9.17 Limitation on Duty to Pay. In addition to the grounds for withholding payment, as set<br />
forth in Section 9.15 herein, Owner and <strong>Design</strong>-<strong>Build</strong>er further agree as follows:<br />
9.17.1 Prior to beginning <strong>Design</strong> Services on the Project, <strong>Design</strong>-<strong>Build</strong>er shall submit to<br />
Owner a <strong>Design</strong> Services Schedule <strong>of</strong> Values, allocating <strong>Design</strong>-<strong>Build</strong>er’s allocated<br />
percentage <strong>of</strong> the Not-To-Exceed <strong>Contract</strong> Price to the design phase <strong>of</strong> the Project.<br />
During the <strong>Design</strong> Services phase, <strong>Design</strong>-<strong>Build</strong>er shall invoice, at minimum,<br />
monthly to Owner and each submitted invoice shall reflect the percentage <strong>of</strong><br />
completion <strong>of</strong> <strong>Design</strong> Services. Upon completion <strong>of</strong> <strong>Design</strong> Services, <strong>Design</strong>-<br />
<strong>Build</strong>er shall include its allocated <strong>Design</strong> Services total costs in <strong>Design</strong>-<strong>Build</strong>er’s<br />
Guaranteed Maximum Price Proposal.<br />
9.17.2 Prior to Owner’s approval <strong>of</strong> the Guaranteed Maximum Price or and Fixed Price<br />
Proposal, as applicable, and execution <strong>of</strong> any supplemental agreement, <strong>Design</strong>-<br />
<strong>Build</strong>er shall submit to Owner a Schedule <strong>of</strong> Values allocating the Guaranteed<br />
Maximum Price or Fixed Price Proposal, as applicable, to the various portions <strong>of</strong><br />
the Construction Work to include the <strong>Design</strong> Services fee addressed in Section<br />
9.17.1 herein. Such Schedule <strong>of</strong> Values shall be prepared in such form, with such<br />
detail and supported by such data as Owner may require substantiating its accuracy.<br />
<strong>Design</strong>-<strong>Build</strong> Services for Las Moras Prefabricated Metal Facility<br />