<strong>Julian</strong> <strong>Marks</strong><br />
<strong>Managing</strong> <strong>Director</strong><br />
<strong><strong>Barfoot</strong>s</strong> <strong>of</strong> <strong>Botley</strong> <strong>Ltd</strong>/<strong>Barfoot</strong> Energy <strong>Ltd</strong>
Founded by Fifth Generation Grower Peter<br />
<strong>Barfoot</strong><br />
5,000 acres field vegetables in UK 2011<br />
<br />
<br />
33 Products from 32 countries around the<br />
world,365 days a year .<br />
Large farming developments in Senegal.<br />
75 million sweetcorn cobs sold in 2010<br />
<br />
Supplying all the major retailers.
Why Anaerobic Digestion ?<br />
<br />
Waste Problem. (20,000 tpa green waste & rising)<br />
<br />
Not enough Cows to eat Sweetcorn By-product.<br />
<br />
<br />
Considered alternatives,<br />
◦ Landfill<br />
◦ Composting<br />
◦ Own beef lot<br />
Legislation changing, Government support increasing.<br />
(Renewable Obligation Certificates, RDPE Grants, Feed in<br />
Tariffs)
What is Anaerobic Digestion ?
‘Domestic’ AD Plants in Use across the developing world.
Environmental<br />
Permitting/<br />
Legislation<br />
PPA<br />
Finance<br />
Highways<br />
Equity /<br />
Investment<br />
Hook up<br />
Private<br />
Wire<br />
Heat Use<br />
Planning<br />
County/<br />
District<br />
Digestate<br />
Treatment<br />
liquid/solid<br />
Feedstock<br />
Availability/<br />
Storage<br />
Construction<br />
Site<br />
Technology<br />
Project Criteria
Summer Cornfest<br />
with up to 5,000<br />
visitors.<br />
Farm Tours (2010<br />
400 visitors)<br />
Talks to farming<br />
groups, site visits,<br />
liaison with local<br />
interest groups,<br />
Parish Councils, WI<br />
and other<br />
organisations.
Environmental<br />
Permitting/<br />
Legislation<br />
PPA<br />
Finance<br />
Highways<br />
Equity /<br />
Investment<br />
Hook up<br />
Private<br />
Wire<br />
Heat Use<br />
Planning<br />
County/<br />
District<br />
Digestate<br />
Treatment<br />
liquid/solid<br />
Feedstock<br />
Availability/<br />
Storage<br />
Construction<br />
Site<br />
Technology<br />
Project Criteria
Project Design & Execution<br />
Construction, Design & Management Regulations (CDM)2007<br />
Construction Regulations (Health & Safety) 2006<br />
Electricity at Work Regulations (Construction)<br />
Working on Construction Sites (Prevention <strong>of</strong> Pollution) PPG6<br />
HSE<br />
The Management <strong>of</strong> Health & Safety at Work Regulations 1999<br />
(Risk Assessments for Operations personnel)<br />
The Work at Height Regulations 2005 (Tank Construction).<br />
Dangerous Substances & Explosive Atmospheres Regulations<br />
(DSEAR) 2002
Equipment & Protective Equipment for use in Explosive<br />
Atmospheres (EPS) Regulations 1996<br />
ATEX EU Directives 137 & 95 (Explosive Atmospheres<br />
directives) 1995<br />
The Gas (Safety & Installation) Regulations 1998 (Gas<br />
Pipework & Compressor).<br />
Control <strong>of</strong> Pollution (Storage <strong>of</strong> Silage, Slurry & Fuel Oil)<br />
Regulations 2009 (Silage Clamps).<br />
Control <strong>of</strong> Substances Hazardous to Health (COSHH) 2002<br />
(AD Plant additives)<br />
Noise at Work Regulations 2005 (CHP Unit)
Environmental :<br />
Environmental Permitting Regulations 2007 (EPR)<br />
EPR Permit Application Parts, A, B & F (standard permit for AD)<br />
EPR Permit (Mobile plant for farm slurry spreading) Application Parts,<br />
A,B,F<br />
Environmental Permitting Guidance Notes<br />
Technical :<br />
Energy Meters Regulations 2006<br />
Generator Application Form (HV Hook up)<br />
OFGEM Guidance Notes (ROC’s FIT’S)<br />
OFGEM Fuel Management Questionaire (online macro) [part <strong>of</strong><br />
accreditation]<br />
OFGEM Sustainability Report (online macro)[part <strong>of</strong> accreditation]<br />
Engineering Recommendations G59/1 (Generator Safety Systems)
Waste<br />
European Waste Framework Directive<br />
The Management <strong>of</strong> Waste Regulations (Licensing <strong>of</strong> personnel)<br />
1994<br />
European Waste Catalogue (EWC codes)<br />
PAS 110 Specification for Certified Digestate (HACCP & QMS)<br />
WRAP ADQP Waste Protocol for Digestate<br />
Animal By Products Regulations Revised 2009 (HACCP)<br />
The Duty <strong>of</strong> Care (Waste Management) Regulations 2002
Concept & Feasibility – Dev Risk<br />
Geotechnical & Topography Surveys<br />
Environmental Impact Assessment<br />
Local Pressure groups<br />
Local Government<br />
Project Execution - Construction<br />
Risk<br />
Civils & Tanks contractor greatest risk<br />
CDM, H&S – German culture different<br />
Running an AD Plant - Operational<br />
Risk
All Construction Sites begin with an Access Road
Lagoon Construction Jan 2009<br />
3.6Million Gallon Capacity
Silage Clamp Construction<br />
8,000 tonne storage capacity to meet Winter feedstock demand
Silage Clamp Construction
Piling Tank Bases<br />
246 (300mm X 300mm) Percussion DrivenReinforced Concrete Piles.<br />
20m Depth
Tank Base Steelwork, Leak Pro<strong>of</strong> membrane,<br />
with leak monitoring system.
Tank Base Concrete Pour Oct 2009<br />
Poured in situ concrete base.
Tank Building November 2009<br />
Pre-cast Concrete Segments, Cable Tensioned.
Tank Insulation in Place Feb 2010
View over top <strong>of</strong> Fermenters prior to Ro<strong>of</strong> Installation April 2010
Completed Biogas Plant
Loading Shredded Sweetcorn into the Feedhoppers
Digestate Solids & Liquid Separation Plant
The public view from the road .
The CHP Unit<br />
Jenbacher1063 Kwhr (1500hp 20 Cylinder Gas Engine)
Management and Control
Tank Interior<br />
Agitator
Plant Outputs<br />
<br />
Engine Capacity 1.063MW<br />
Available Hours 8,760<br />
Budget Operating Hours 8,060<br />
<br />
Electricity Output 8,567 Mwh per annum<br />
<br />
Heat Output per annum 4300Mwh per annum<br />
Parasitic Load 5%
April to<br />
June are<br />
projected<br />
figures<br />
<strong><strong>Barfoot</strong>s</strong> energy generated from AD Plant is far in excess <strong>of</strong><br />
energy use from grid for factory operations.<br />
35
Achievements to date:-<br />
Carbon neutral electricity and heat. Self sufficient<br />
100% green waste utilisation<br />
Up to 800 acres <strong>of</strong> reduced fertiliser input<br />
Reduce carbon footprint <strong>of</strong> overall business by 97%<br />
Removed 5000 vehicle movements from local roads,<br />
previously involved in moving waste .
Future Plans<br />
Increasing capacity <strong>of</strong> existing plant to<br />
generate1.5MwH equivalent output<br />
Biogas direct to gas Grid for second phase<br />
Phosphate capture. Adding value to digestate<br />
Pelleting system to create a fuel pellet from solid<br />
digestate for burning in biomass generation plant<br />
Development work with local growers on utilising<br />
digestate as a peat alternative in propagation.
<strong>Barfoot</strong> Energy Projects <strong>Ltd</strong> formed July 2010<br />
Providing technical advice, concept and feasibility<br />
studies<br />
Development <strong>of</strong> five or more on farm AD plants<br />
digesting a combination <strong>of</strong> food waste, crop waste<br />
and rotational crops within the next five years
Guaranteed Feed in Tariffs<br />
Crop Rotation options.<br />
Reduce reliance on artificial fertilisers.<br />
Secure income.<br />
Rental returns.<br />
Capital Investment High<br />
Requires detailed management.<br />
Long term project.<br />
Legislative Compliance.