7. Sequence / Special Precautions 8. Sketch <strong>of</strong> the zone <strong>of</strong> operation<br />
(It is recommended that you include the initial location<br />
<strong>of</strong> the load, the final location <strong>and</strong> path <strong>of</strong> the load. It is<br />
also important to indicate any obstructions or<br />
equipment that may obstruct the lifting operation).<br />
Applied by:<br />
Name:<br />
Prepared by:<br />
Name:<br />
Assessed by:<br />
Name:<br />
Approved by:<br />
Name:<br />
Signature:<br />
Signature:<br />
Signature:<br />
Signature:<br />
Date:<br />
Time :<br />
Date:<br />
Time:<br />
Date:<br />
Time:<br />
Date:<br />
Time:<br />
Note:<br />
1. This is only a sample Lifting Plan/ PTW. The content is by no mean comprehensive. Users<br />
would have to include key critical document <strong>and</strong> information such as load capacity chart, range<br />
diagram, rigging method, sling angle etc to ensure safe lifting operations.<br />
2. Further guidance can be obtained from the following collaterals:<br />
• Guidebook for Lifting Supervisors<br />
• Worker’s H<strong>and</strong>book for Crane Operator<br />
• Worker’s H<strong>and</strong>book for Rigger <strong>and</strong> Signalman<br />