16.11.2014 Views

Code of Practice - Workplace Safety and Health Council

Code of Practice - Workplace Safety and Health Council

Code of Practice - Workplace Safety and Health Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SAMPLE CHECKLIST FOR LORRY CRANE<br />

APPENDIX 5<br />

This checklist provides an overview <strong>of</strong> the basic requirements to be checked which would help to ensure that a lorry crane is<br />

safe for use. Lorry crane users should consult manufacturers, suppliers <strong>and</strong> owners to check on minimum requirements <strong>and</strong><br />

address any concerns before using the equipment. These items in this checklist are non-exhaustive <strong>and</strong> users are<br />

recommended to make the necessary modification <strong>and</strong> customisation to suit your work processes <strong>and</strong> conditions at the<br />

workplace.<br />

A) EQUIPMENT APPROVED FOR USE SUGGESTED EVIDENCE YES/NO REMARKS<br />

1 Lorry crane is registered with MOM. LM Certificate or equivalent Yes No<br />

2 Lifting Gear is registered with MOM. LG Certificate or equivalent Yes No<br />

B) RISK ASSESSMENT SUGGESTED EVIDENCE YES/NO REMARKS<br />

3<br />

Risk assessment conducted for the<br />

various work processes (e.g., use,<br />

maintenance)<br />

Completed risk assessment form<br />

for the various work processes<br />

Yes No<br />

4<br />

Risk assessment team comprised <strong>of</strong><br />

representatives from the occupier,<br />

equipment supplier, equipment operator<br />

etc.<br />

Risk assessment form indicating<br />

the composition <strong>of</strong> risk<br />

assessment team<br />

Yes No<br />

Safe work procedures<br />

Safe work procedures are developed <strong>and</strong><br />

implementation plan<br />

5<br />

implemented before work is being carried<br />

out.<br />

Inspection to verify<br />

implementation <strong>of</strong> safe work<br />

Yes No<br />

procedures<br />

Safe work procedures are effectively<br />

6<br />

communicated to all relevant parties<br />

(e.g., crane operator, lifting supervisor,<br />

Records <strong>of</strong> briefing / training to<br />

relevant parties<br />

Yes No<br />

signalman, rigger etc.)<br />

C) OPERATION OF CRANE SUGGESTED EVIDENCE YES/NO REMARKS<br />

Crane operator registration card,<br />

Only trained <strong>and</strong> competent persons are<br />

training records <strong>and</strong> certificate<br />

7<br />

to be involved in the lifting operation (i.e.,<br />

crane operator, lifting supervisor,<br />

Lifting supervisor, signalman <strong>and</strong><br />

Yes No<br />

signalman <strong>and</strong> rigger)<br />

rigger’s training records <strong>and</strong><br />

certificates<br />

8 Lifting Plan is developed <strong>and</strong> made Written Lifting Plan <strong>and</strong> Yes No<br />

Page 36 <strong>of</strong> 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!