NAME OF WORK : Operation and comprehensive maintenance of 5ESS, NIB, BB Multiplay, OCB PAC plants at<br />
TE Haddows Road, <strong>Chennai</strong>. (2013-15)<br />
INVENTORY DETAILS<br />
Location / Type of Plant<br />
Year of<br />
Installation<br />
Total<br />
TR<br />
Package AC [6 x 7TR] NIB,<br />
2nd floor 2002 42 TR<br />
Package AC [4 x 7TR] BB<br />
Multi play, 2nd floor 2007 28 TR<br />
Package AC [5 x 7TR] OCB,<br />
5th floor 2008 35 TR<br />
Package AC [3 x 10TR] & [3 x<br />
7TR] OCB TAX, 5th floor 2007 51 TR<br />
SCOPE OF MAINTENANCE GENERAL<br />
GENERAL CONDITIONS<br />
Comprehensive Maintenance of Ac plants of Technical building means that all items required for and forming<br />
part of the Ac plant included in the schedule of work are kept in healthy and clean condition and carrying out<br />
operation of the plant. Specific <strong>details</strong> of maintenance activities required are detailed under sections-II.<br />
METHODOLOGY<br />
It is presumed that contractor will provide at least minimum qualified staff at the site, which will be adequate<br />
to perform routine maintenance and operational functions. Also maintenance staff has to be available round<br />
the clock round the year even on holidays. Scheme for staff employed shall be got approved by the Engineerin-charge.<br />
In case of faults beyond the capacity of the staff provided as above, contractor shall immediately provide extra<br />
specialized work-force so as to attend to the faults in minimum reasonable time. The operation and<br />
Maintenance work shall be carried out in such a way that the essential services are not affected at any time by<br />
attending the faults reported within the time period as specified by Engineer-in-Charge.<br />
QUALIFICATIONS<br />
Air-conditioning:<br />
1. Pass in Matriculation for AC plant operator.<br />
2. All Tools and Plants required for carrying out various tasks relevant to operations and maintenance<br />
have to be arranged at his own cost.<br />
3. All materials needed for maintenance i/c replacement of compressors are to be arranged by the firm<br />
at own cost. Materials arranged by contractor shall be of makes as per list attached, otherwise shall<br />
be of good quality and ISI mark duly referring sections relevant to service.<br />
4. Required T&P to be arranged by the firm.<br />