18.11.2014 Views

details.... - Chennai Telephones - BSNL

details.... - Chennai Telephones - BSNL

details.... - Chennai Telephones - BSNL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NAME OF WORK : Operation and comprehensive maintenance of 5ESS, NIB, BB Multiplay, OCB PAC plants at<br />

TE Haddows Road, <strong>Chennai</strong>. (2013-15)<br />

INVENTORY DETAILS<br />

Location / Type of Plant<br />

Year of<br />

Installation<br />

Total<br />

TR<br />

Package AC [6 x 7TR] NIB,<br />

2nd floor 2002 42 TR<br />

Package AC [4 x 7TR] BB<br />

Multi play, 2nd floor 2007 28 TR<br />

Package AC [5 x 7TR] OCB,<br />

5th floor 2008 35 TR<br />

Package AC [3 x 10TR] & [3 x<br />

7TR] OCB TAX, 5th floor 2007 51 TR<br />

SCOPE OF MAINTENANCE GENERAL<br />

GENERAL CONDITIONS<br />

Comprehensive Maintenance of Ac plants of Technical building means that all items required for and forming<br />

part of the Ac plant included in the schedule of work are kept in healthy and clean condition and carrying out<br />

operation of the plant. Specific <strong>details</strong> of maintenance activities required are detailed under sections-II.<br />

METHODOLOGY<br />

It is presumed that contractor will provide at least minimum qualified staff at the site, which will be adequate<br />

to perform routine maintenance and operational functions. Also maintenance staff has to be available round<br />

the clock round the year even on holidays. Scheme for staff employed shall be got approved by the Engineerin-charge.<br />

In case of faults beyond the capacity of the staff provided as above, contractor shall immediately provide extra<br />

specialized work-force so as to attend to the faults in minimum reasonable time. The operation and<br />

Maintenance work shall be carried out in such a way that the essential services are not affected at any time by<br />

attending the faults reported within the time period as specified by Engineer-in-Charge.<br />

QUALIFICATIONS<br />

Air-conditioning:<br />

1. Pass in Matriculation for AC plant operator.<br />

2. All Tools and Plants required for carrying out various tasks relevant to operations and maintenance<br />

have to be arranged at his own cost.<br />

3. All materials needed for maintenance i/c replacement of compressors are to be arranged by the firm<br />

at own cost. Materials arranged by contractor shall be of makes as per list attached, otherwise shall<br />

be of good quality and ISI mark duly referring sections relevant to service.<br />

4. Required T&P to be arranged by the firm.<br />

Contractor Internet Downloaded copy Executive Engineer (E)<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!