09.07.2015 Views

detailed - Chennai Telephones - BSNL

detailed - Chennai Telephones - BSNL

detailed - Chennai Telephones - BSNL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)(Electrical Wing)%,the Executive Engineer(E),<strong>BSNL</strong> Electrical Division. IGround floor, Telephone Exchange,# 22, Kelleys Road, Kelleys,<strong>Chennai</strong> – 600 010.Phone: 26470405Fax No: 26470406Address_______________________________________________________________________________________Pin.__________Phone: _____________________Fax:________________________NIT.NUMBER: 85 /ED-I/CH/12-13TENDER DOCUMENTName of work:- Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.Name of the Contractor____________________________(To be filled in by the Contractor)Dt:- 27/03/2013Contractor Internet Downloaded copy Executive Engineer (E)Page 1 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.INDEXSL NO.DESCRIPTIONPAGE NUMBER1 Tender Notification 323Procedure for submission of tenders downloadedthrough Website.Important Instructions to Tenderers downloading thetender document from website454 Important instructions to the Tenderers 65 Model form of Bank Guarantee for submitting EMD 106 Undertakings A & B 117 Declaration by Contractor 128 Notice Inviting Tender form 139 <strong>BSNL</strong> EW – 8 1810 Schedule of Quantities 31-3311 Specifications of Work EI 34-3512 List of Approved makes 36-3713 List of IS 38This NIT contains 38 no of Pages (Thirty Eight pages only).(To be filled in by the NIT approving authority)Contractor Internet Downloaded copy Executive Engineer (E)Page 2 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.TENDER NOTIFICATIONNIT.NUMBER: 85/ED-I/CH/12-13The Executive Engineer (Electrical), <strong>BSNL</strong> Electrical Division – I, <strong>Chennai</strong> invites on behalfof <strong>BSNL</strong> item rate tenders for the work of "Attending to faults and overhauling of 125KVATrolley mounted EA set (Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>."Dt:- 27/03/2013.Essential Eligibility criteriaAverage annual turn over during the last 3 years, ending 31 st March of the previousfinancial year should be atleast 30% of the estimated cost put to tender.ANDThe manufacturer or their authorized service dealer. The letter of authorization inoriginal from the manufacturer will be produced by the dealerORSuccessfully completed 3 similar works costing not less than the amount equal to 40%of the estimated cost put to tender, in <strong>BSNL</strong>, during last seven years ending last day ofmonth previous to the one in which applications are invited.ORSuccessfully completed 2 similar works costing not less than the amount equal to 60%of the estimated cost put to tender, in <strong>BSNL</strong>, during last seven years ending last day ofmonth previous to the one in which applications are invited.ORSuccessfully completed 1 similar works costing not less than the amount equal to 80%of the estimated cost put to tender, in <strong>BSNL</strong>, during last seven years ending last day ofmonth previous to the one in which applications are invited.Note:- The estimated cost of one year shall be considered to evaluate the eligibility criteria.GENERAL CONDITIONSThe contractor shall submit and confirm1. Valid Chartered Accountant certificate and TNGST & Service Tax registration certificateswith attested copies as applicable along with the application on their printed letterheads for purchase of tender.2. The tenders of contractors who do not deposit earnest money in the prescribed mannerare liable to be rejected.The tender will be received up to 3.00 P.M. on 06/04/13/04/13and opened on 3.30 PM on thesame day. In case holiday is declared on the opening day the tenders will be openedon the next working day.1. Estimate Cost: Rs.1,39,108/-2. EMD: Rs.2,782/-3. Last date for sale of Tender Schedules: 04.0.04.13.13 upto 4.00PM4. Cost of Tender Schedule: Rs.525/-5. Performance Guarantee: 5% of contract value6. Time for Completion: 20 Days.Executive Engineer (E)<strong>BSNL</strong>, Electrical Division-I<strong>Chennai</strong>.Note:- Tender documents can also be downloaded from the website www.chennai.bsnl.co.inContractor Internet Downloaded copy Executive Engineer (E)Page 3 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.Procedure for submission of tenders downloaded through website.The firm who quotes on the tender document downloaded from website shall strictlyfollow the following procedure.1) The Tender shall be submitted in Two envelopes.i) First envelope shall contain tender application (if tender downloadedfrom WEB) tender fee, attested document proving fulfillment of eligibilitycriteria as per the tender notice and EMD in proper form. The earnestmoney deposited in the shape of DemandDraft/PayOrder of aScheduled Bank or Nationalised Bank/State Bank guaranteed by ReserveBank of India drawn in favour of Accounts Officer, <strong>BSNL</strong> Electrical Division,<strong>Chennai</strong> payable at <strong>Chennai</strong> , and the credentials of the firm in the firstcover shall be attested by a Gazetted officer or by a <strong>BSNL</strong> Executive. Incases where it is not possible to obtain the attestation of Gazetted officeror <strong>BSNL</strong> Executive, then the agency shall submit the same with selfattestation and shall furnish all the originals at the time of tender opening,failing which his second envelope containing the tender document shallnot be opened. Two Separate Demand Drafts, One for Tender cost andthe other for EMD should be attachedii)Second Envelope shall contain duly filled tender document2) The First envelope containing tender fee, attested document proving fulfillment ofeligibility criteria and EMD in proper form shall be opened first.In case :-i) Tender cost is not submitted in proper formii)iii)EMD is not in proper formFirm fails to fulfill eligibility criteria on the basis of document submitted inthe first envelope.the Second envelope shall not be opened.Important Note: The Envelopes shall be clearly super scribed on top asFIRST ENVELOPE- TENDER COST/ EMD/ CREDENTIALSSECOND ENVELOPE - TENDER DOCUMENTContractor Internet Downloaded copy Executive Engineer (E)Page 4 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.IMPORTANTINSTRUCTIONS TO TENDERERS DOWNLOADING THE TENDER DOCUMENT FROMWEB SITEThe Tenderers, who have down loaded the tenders from the web site, shall read thefollowing important instructions carefully before quoting the rates and submitting thetender documents:-1. The tenderer should see carefully and ensure that the tender document containingall the pages as per the index has been down loaded for making required entries. Thebalance pages of Standard <strong>BSNL</strong> EW 8 forms will be attached with the agreement after theaward of work. The entire <strong>BSNL</strong> EW 8 clauses are available in the web sitewww.chennai.bsnl.co.in in the electrical tenders section for ready reference and thecontractor shall read the same and keep themselves aware of the said Clauses.2. A clear print out of tender document shall be taken on good quality A4 size paperand the printer settings, etc., shall be such that the document is printed as appearing in theweb and without any change in format, number of pages, etc., and shall also ensure thatno page is missing. Only original computer print out of the document shall be used.Photocopy shall not be accepted.3. In case of any doubt in the downloaded tender, the same shall be got clarified fromthe Engineer in charge calling the NIT before submission of tenders.4. The name of the tenderer shall be filled on the relevant pages of <strong>BSNL</strong> EW 6 form etc.,and all the pages shall be invariably signed and seal affixed.5. The tenderer shall ensure that the downloaded tender document is properly stitchedand sealed with sealing wax before submitting the document. Loose / spiral bound tendersshall not be accepted. Sealing of the tenders with adhesive tapes is not acceptable andthe tenders are liable to be summarily rejected.6. There shall be no correction / addition / alteration / omission made in the text of thedownloaded tender document. If found otherwise, the same shall be treated as nonresponsiveand summarily rejected.7. The tenderer shall sign the declaration enclosed before submitting the tender.CONTRACTORENGINEER IN CHARGEContractor Internet Downloaded copy Executive Engineer (E)Page 5 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.IMPORTANT INSTRUCTIONS TO THE TENDERERSPlease note that the offers, which do not comply the following, will not be considered andwill be summarily rejected. These instructions supersede the <strong>BSNL</strong> EW 8 clauses incase of anyDisparity.1. Tenders with any condition including that of conditional rebates shall be rejectedforthwith summarily.2. Insurance, loading, unloading, transportation etc. should be included on workscontact basis3. No Octroi exemption certificate shall be issued by the department nor the Octroiduty paid by the contractor will be reimbursed. Hence Octroi charges shall beincluded in the offer.4. The price shall be firm and fixed during the currency of the contract. No costescalation is permitted. Clause10CC is not applicable.5. The Extension of time for completion of the works is governed by clause 5 of thetender documents.6. No advance payments can be made. The payment is governed by the normaldepartment practice. Stipulations like levy of interest if payment is not made in aspecified time is not acceptable.7 The firm should deposit EMD before submission of their offer. The EMD of other worksrefundable to them cannot be adjusted against this work. The firm’s offer shall beliable for rejection without EMD for this particular work.8) TAXES AND DUTIESThe firm shall quote rates for all the items inclusive of all taxes and duties, inclusive ofOctroi, entry tax, work contract tax, Service tax. No concession form will be issued by theDepartment.Tendered rates shall be inclusive of all taxes and levies payable under the respectivestatutes. However pursuant to the constitution (Forty sixth amendment) Act, 1982, If anyfurther tax or levy is imposed by statute, after the date of receipt of tenders and thecontractors there-upon necessarily and properly pays such taxes/ levies the contractorshall be reimbursed the amount so paid, provided such payment, if any in the opinion ofSuperintending Engineer whose decision shall be final and binding is not attributable todelay in execution of work within the control of the contractor.The contractor shall keep necessary books of accounts and other documents for thepurpose of this condition as may be necessary and shall allow inspection of the same by aduly authorized representative of Government and further shall furnish such otherinformation/documents as the Engineer-in-Charge may require.The contractor shall within a period of 30 days of imposition of any further tax or levypursuant to the constitution (Forty sixth amendment) Act, 1982, give a written noticethereof to, the Engineer-in-Charge that the same is given pursuant to this condition togetherwith all necessary information relating thereto.Note : No additional condition whatsoever will be accepted for turnover tax/ sale taxon works contract. In case of additional conditions for the payment of such claims bythe contractor, the tender may be summarily rejected by the accepting authority.Contractor Internet Downloaded copy Executive Engineer (E)Page 6 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.9) WORKS CONTRACT TAXThe rates offered by the firm shall be inclusive of the works contract tax asapplicable in the state. The department shall deduct works contract tax from paymentsdue to the firm and as per rules of the State Govt. Certificate for such deduction shall beissued to the firm by the Accounts Officer of the Division.As per the new provisions of Section 7F, for deduction of tax at source introduced inthe Tamil Nadu General Sales Tax Act 1959 by T.N. Act 15 of 1999; with effect from 10.6.99,at the time of payment, a sum equivalent to 5% of the total value of work done shall bededucted from all the Running and Final bills.10 INCREASE /DECREASE OF TENDERED QUANTITYa) <strong>BSNL</strong> will have the right to increase or decrease upto 25% of the Contract valuedepending upon the requirement of goods and services specified in the schedule of itemswithout any change in the unit price or other terms and conditions at the time of award ofcontract.b) In exceptional situation where the requirement is of an emergent nature and it isnecessary to ensure continued supplies from the existing vendors, the purchaser reservesthe right to place repeat orders upto 50% of the quantity of goods and services containedin the running tender/contract within a period of 12 months from date of award of work atthe same rate or a rate negotiated (downwardly) with the existing vendors considering thereasonability of rates based on prevailing market conditions and the impact of reductionin duties and taxes etc.11) CURTAILMENT OF QUANTITY:-<strong>BSNL</strong> reserves the right to enforce curtailment in the assigned quantum of work forany contractor on the grounds of defaults/delay in regard to execution of the individualwork assigned.12) COMPLETION OF WORK:-12.1 The time period will be reckoned from the 10 th day after the date on which the order ofcommence the work issued to the contractor.12.2 The normal time of completion shall be 20 Days.14) EXTENSION OF TIME:-If the contractor shall desire an extension of time for completion of work on thegrounds of his having been unavoidably hindered in its execution or on any other grounds,he shall apply in writing to the Engineer in charge within 30 days of the hindrance on theaccount on which he desires such extension as aforesaid, and the Engineer in charge shallif in his opinion reasonable grounds to be shown therefore, authorize such provisionalextension of time, if any as in his opinion be necessary are proper.13) COMPENSATION FOR DELAY :If the contractor fails to maintain the required progress or complete the work andclear the site on or before the contract or extended date of completion, he has to paythe compensationfor delay which is limited to 0.5% per week of the tendered value for the first 10 weeks and0.7% per week for next 10 weeks and thereafter subject to a maximum of 12% of thetendered value for the location where the work is delayed and the firm is foundresponsible for the same. The clause 2 of <strong>BSNL</strong> EW - 8 forms stands modified accordingly.Flow chart of the procurement process/ contract shall be supplied by the contractor andContractor Internet Downloaded copy Executive Engineer (E)Page 7 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.approved by Executive Engineer concerned.14) PAYMENT TERMS:-Payment to the Contractors during progress of work is regulated for all the items asbelow.a) 80% of pro rata of the approved price breakup of contract value on receipt ofequipment at site and after satisfactory physical inspection.b) 20% of pro rata of the approved price break up of the contract value after successfulinstallation and commissioning of equipment.15) EPF PROVISIONS:-The agency has to comply with the provisions of EPF and miscellaneous provisionsAct-1952 and employees provident fund scheme-1952 as amended up to date inrespect of labours/employees engaged by them for this work. Any consequence arisingdue to non- complying of provisions as specified above shall be the sole responsibility ofthe firm only.16(a) Agency has to observe all the labour rules & regulation in force. Agency shall be fullyresponsible for any violation observed at any time.17 Inspection of Site and Contract DocumentsFor the purpose of inspection of site and relevant documents, the contractor is required tocontact E.E (Elect) concerned who shall give reasonable facilities for Inspection of thesame. The contractor shall inspect and examine the site and its surroundings and shallsatisfy himself before commencement of work as to the form and nature of the site, thequantities and nature of work, materials necessary for completion of the works, the meansof access to the site, the accommodation he may require and in general shall himselfobtain all necessary information as to risks, contingencies and other circumstances whichmay influence or affect his work. No extra charges consequent on any misunderstandingor otherwise shall be allowed.18 Variation in quantities in respect of unit rates items will be governed by unit rates in theAgreement. This applies to all variations ordered during the currency of the main contractregardless of the quantity of variation. For any item of work not covered by the scheduleof work Clause12 of <strong>BSNL</strong> EW -8 shall apply.19. I.S. Standards:The entire system shall conform to relevant Bureau of Indian Standards as amended up todate. Where IS standards are not available the British standard(s) shall be followed. Incase of conflict, the requirements of these specifications shall be given over-riding priority.The electrical and earthing work shall be carried out as per CPWD specifications forelectrical works (internal) and electrical works (external) as amended upto date.20. Modifications/Alterations.20.1 Modifications or alterations in the design/specifications of any equipment/material willnot be permitted by the department as a matter of principle.Contractor Internet Downloaded copy Executive Engineer (E)Page 8 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.20.2 However, the department may relax the above stipulation in exceptionalcircumstance where:a) The same is necessitated due to non-availability of material/component ofcertain specifications or make.ORb) Such alterations constitute an improvement in the opinion of the contractor.20.3 Prior written approval of the department shall be obtained before execution of suchalterations/modifications.21. Quality AssuranceThe EI works are to be executed in accordance to the CPWD specifications. The work isconsidered to be completed only after the successful completion of testing.ContractorExecutive Engineer (E)Electrical Division IContractor Internet Downloaded copy Executive Engineer (E)Page 9 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.MODEL FORM OF BANK GUARANTEE(Bank Guarantee bond for EMD for Air Conditioning, Diesel Engine Alternator, Lifts andSubstation works, Wherever the amount of EMD is more than Rs.20,000/=)Whereas____________________________(hereinafter called “the contractor(s)”)has submitted its Tender dated_________for the work ______________________________________________________________________________________KNOW ALL MEN by these presents that WE___________________________OF___________________________ having our registered officeat_______________________ (hereinafter called “the Bank”) are bound unto_______________________ (hereinafter called “the <strong>BSNL</strong>”) in the sum of_________________ for which payment will and truly to be made of the said <strong>BSNL</strong>,the Bank binds itself, its successors and assigns by these presents.THE CONDITIONS of the obligation are:1. If the Contractor(s) withdraws its Tender during the period of Tender validityspecified on the Tender Form: or2. If the Contractor(s) having been notified of the acceptance of its Tender bythe <strong>BSNL</strong> during the period of Tender validity.(a) Fails or refuses to execute the Contract.(b) Fails or refuses to furnish security Deposit in accordance with theconditions of Tender document.We undertake to pay to the <strong>BSNL</strong> up to the above amount upon receipt of itsfirst written demand, without the <strong>BSNL</strong> having to substantiate its demand,provided that in its demand, the <strong>BSNL</strong> will note that the amount claimed by it isdue to it owing to the occurrence of one or both of the two conditions,specifying the occurred condition or conditions.This guarantee will remain in force as specified in the Tender Document up toand including Thirty (30) days after the period of the Tender validity and anydemand in respect thereof should reach the Bank not later than the specifieddate/dates.Signature of the BankSignature of the WitnessName of WitnessAddress of WitnessContractor Internet Downloaded copy Executive Engineer (E)Page 10 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.UNDERTAKINGS TO BE FURNISHED BY THE TENDERER1. UNDERTAKING A"I……… ……………… ……………… …………… ………Sonof. ……… ………………… ………… …………… …………….. …………….Residingat …… …………… ………… …………… …………… …………… …………. hereby give anundertaking that I have read and I am aware of all the clauses and sub clauses of <strong>BSNL</strong>EW 6 & 8 forms and I confirm that I will abide by all the terms and conditions available inoriginal standard <strong>BSNL</strong> EW 6 & 8 forms. My Income tax Permanent Account Number(PANNo) is __________________Note:-The Standard <strong>BSNL</strong> EW form 6& 8 are available in the website www.chennai.bsnl.co.in(Seal of the firm)(Dated Signature of Contractor)Or his authorized Power of attorney)2. UNDERTAKING B"I ……… …………… ………… ………… …… ………… ……. Sonof …… ……… ……… ……… ……… ……… ……… …… ……… ……… ….... Residentof……… …… ………… ……… ……… ……… …… …… …… ………… ……. hereby give anundertaking that none of my relative(s) as defined below is/are employed in <strong>BSNL</strong> unit asper details given in tender document. In case at any stage, it is found that the informationgiven by me is false/incorrect, <strong>BSNL</strong> shall have the absolute right to take any action asdeemed fit/without any prior intimation to me".The Near relatives for this purpose are defined as;1. Members of a Hindu Undivided family,2. They are Husband and wife3. The one is related to the other in the manner as father, mother, Son(s) & Son’s wife(Daughter –in-law), Daughter(s) & daughter’s husband (Son-in-law), brother(s) &brother’s wife, Sister(s) & Sister’s husband (brother-in-law).(Seal of the firm)(Dated Signature of Contractor)Or his authorized Power of attorney)Contractor Internet Downloaded copy Executive Engineer (E)Page 11 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.Declaration by Contractor(To be given by tenderers downloading the tender document from the web)This is to certify that:1) I / We have submitted the tenders in the proforma as downloaded directlyfrom the web sites which are same as available in the web site and there is nochange in the format, no. of pages, etc.2) I / We have not made any modifications / corrections / additions etc., in thetender documents downloaded from web by me / us.3) I / We have checked that no page is missing and all pages as per the indexare available and that all pages of tender document submitted by us areclear and legible.4) I / We have signed (with stamp) all the pages of tender document beforesubmitting the same.5) I / We have stitched and wax sealed the tender documents properly beforesubmitting the same.6) I / We have submitted the cost of the tender along with EMD in the first coveras prescribed.7) I / We have read carefully and understood the ‘Important instructions tocontractors’, ‘Important instructions to tenderers downloading the tenderdocuments from web site’ and entire standard <strong>BSNL</strong> EW 8 clauses andproforma form displayed in web site. www.chennai.bsnl.co.in8) In case at later stage, it is noticed that there is any difference in my / ourtender documents with the original documents, <strong>BSNL</strong> shall have the right tocancel the tender / work, forfeit the Earnest Money / Security Deposit, takeappropriate action as per the prevailing rules in force and <strong>BSNL</strong> shall not bebound to pay any damages to me / us on this account.Dated……………….(CONTRACTOR)(SIGN WITH SEAL)Contractor Internet Downloaded copy Executive Engineer (E)Page 12 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW6BHARAT SANCHAR NIGAM LIMITED( A Government of India Enterprise)Electrical WingElectrical Division: ISub Division,IVCertified that this tender scheduleNIT No.: 85/ED-I/CH/12-13Contains 38 pages only.Dt:- 27/03/2013Notice Inviting Tenders(As per Tendering Procedure in <strong>BSNL</strong> revised up to date)Tenders in the prescribed form are hereby invited on behalf of the <strong>BSNL</strong> for the work ofName of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.Estimated cost : Rs.1,39,108/-02. (a) Printed forms of tenders consisting of the <strong>detailed</strong> plans, completespecifications, the Schedule of quantities of the various classes of works to be done and theset of conditions of contract to be complied with by the persons whose tender may beaccepted, can be purchased, at the Divisional / Sub divisional office between the hours of1100 hrs and 1600 hrs. Every day except on Sundays and Public Holidays on payment ofRs.525/- in cash.(b) The site for the work is available/ or the site for the works shall be made available inparts.(c) The tender forms can also be downloaded from the website www.chennai.bsnl.co.in.(d) Before tendering, the contractor shall inspect the site and fully acquaint himselfabout the condition with regard to accessibility of site and site nature and the extendof grounds, working condition, including stocking of materials, installation of T&Petc., and conditions affecting accommodation and movement of labour etc.,required for the satisfactory execution of the contract. No claim whatsoever onsuch account shall be entertained by the <strong>BSNL</strong> in any circumstances.03. Tenders which should always be placed in sealed covers with the name of the workwritten on the envelope will be received by the Executive Engineer (Elect.), Division – I,<strong>Chennai</strong>, Upto 1500 hours on 06/04/13/04/13and will be opened by him in his office on the sameday at 1530 hours.04. The time allowed for carrying out the work will be 20 Days reckoned from the date ofissue of letter of indent.05. Issue of tender form will be stopped one day before the date 06/04/13/04/13fixed for openingof tenders. Tenders will be sold on working days, no tenders will be sold after 1600 hours.Contractor Internet Downloaded copy Executive Engineer (E)Page 13 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.<strong>BSNL</strong> EW – 606. a) Earnest Money amounting to Rs.2,782/- in the form of demand draft/ FDR/ BG/CDR of a nationalized /scheduled bank guaranteed by the Reserve Bank of India,drawn in favour of Accounts Officer, <strong>BSNL</strong> Electrical Division <strong>Chennai</strong> must accompanyeach tender and each tender should be in two sealed covers, one cover containing theEMD in proper form and other cover containing tender, superscribed as “ Tender for thework of “Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.".” and addressed to Executive Engineer (E) <strong>BSNL</strong>,Electrical Division –I,<strong>Chennai</strong> The Validity period of EMD is 120 days, from the date ofopening of tender. In case of e-tendering, each tender should be in two sealed coves, firstcontaining credentials for meeting the Eligibility conditions along with the cost of tendersand EMD in proper form, second cover containing tender documents. The credentials shallbe self attested and certified by any <strong>BSNL</strong> Executive. If not certified by <strong>BSNL</strong> Executive thenoriginal documents shall be produced at the time of tender opening. After verification ofthe contents of this envelope then second envelope containing the bid document shall beopened.b) The EMD of all the unsuccessful tenderers shall be released on issue of award letter tothe successful tendered. This shall be done within one week of award letter.c) Exemption from payment of earnest money and security deposit by any other unit/department shall not hold good for <strong>BSNL</strong>.07. a) The contractor should submit and confirm Chartered Accountant Certificate inrespect of turnover and other registration certificate [Enlistment in <strong>BSNL</strong>, Electrical License,Sales Tax] with attested copies (Self attested and counter attested by any executive of<strong>BSNL</strong>/MTNL or Gazetted officer of GOI) as applicable along with the application on printedletter head for purchase of tender.b) The contractor shall submit and confirm his permanent account number (PAN)issued by the Income Tax Department.c) The tenderer should submit the valid WCT/ Sales Tax/ VAT registration certificate08. i) Performance Guarantee: The contractor is required to furnish performanceguarantee for an amount equal to 5% of the contract value in the form of bank guarantee/ CDR/FDR/DD (of a nationalized / Scheduled Bank in a standard format) within twoweeks from the date of issue of award letter. This period can be further extended by theEngineer-in-charge up to a maximum period of 2 weeks on written request of Contractor.The validity period of the performance security in the form of performance bank guaranteeshall be one year from the date of actual completion of work.ii) Security deposit: In addition to performance guarantee stated above, a sum @10% of the gross amount of the bill shall be deducted from each running bill of thecontractor till the sum be deducted with the sum already deposited as earnest money, willamount to security deposit of 5% of the Tendered value of the work.Contractor Internet Downloaded copy Executive Engineer (E)Page 14 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.<strong>BSNL</strong> EW - 609. The acceptance of a tender will rest with the Executive Engineer (E), Electrical Division-I,<strong>Chennai</strong> who does not bind himself to accept the lowest tender or any other tender andreserves to himself the Authority to reject lowest or all the tenders received without assigningany reason. All tenders in which any of the prescribed conditions are not fulfilled orincomplete in any respect are liable to be rejected. Tenders with any condition includingthat of conditional rebates shall be rejected forthwith summarily.10. Canvassing in connection with tender is strictly prohibited and the tenders submitted bythe contractors who resort to canvassing will be liable for rejection.11. The <strong>BSNL</strong> reserves itself the right of accepting the whole or any part of the tender andthe tenderer shall be bound to perform the same at the rates quoted.12. i) The tenderer should give a certificate that none of his/her relative is employed in<strong>BSNL</strong> units. In case of proprietorship firm, certificate will be given by the proprietor and forpartnership firm certificate will be given by all the Directors of the company.ii) Near relatives of all <strong>BSNL</strong> employees either directly recruited or on deputation areprohibited from participation in tenders and execution of works in the different units of <strong>BSNL</strong>.The near relatives for this purpose are defined as:a) Members of a Hindu Undivided family.b) They are husband and wife.c) The one is related to the other in the manner as father, mother, son(s) & son'swife(daughter-in-law), Daughter(s) & daughter's husband(son-in-law), brother(s) &brother's wife, sister(s) & sister's husband(brother -in-law).iii) The company or firm or any other person is not permitted to tender for works in<strong>BSNL</strong> Unit in which his near relative(s) is(are) posted. The unit is defined asSSA/Circle/Chief Engineer/Chief Arch./Corporate office for non executive employees andall SSA in a circle including circle office/Chief Eng./Chief Archt./Corporate office forexecutive employees (including those called as Gazetted officers at present). The tenderershould give a certificate that none of his/her such near relative is working in the units asdefined above where he is going to apply for tender/work, for proprietorship, partnershipfirms and limited company certificate shall be given by the authorized signatory of the firm.Any breach of these conditions by the company or firm or any other person, thetender/work will be cancelled and earnest money/performance guarantee will be forfeitedat any stage whenever it is so noticed. <strong>BSNL</strong> will not pay any damages to the company orfirm or the concerned person. The company or firm or the person will also be debarred forfurther participation in the concerned unit.Contractor Internet Downloaded copy Executive Engineer (E)Page 15 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW - 6The format of the certificate to be given is"I……………………………………………………………….Son of Sh …………………………………………………………………………….... Residentof………………………………………………………………………………. hereby certify thatnone of my relative(s) as defined in the tender document is/are employed in <strong>BSNL</strong> unit asper details given in tender document. In case at any stage, it is found that the informationgiven by me is false/incorrect, <strong>BSNL</strong> shall have the absolute right to take any action as deemedfit/without any prior intimation to me".(Seal of the firm)( Signature of Contractor )13. No employee in <strong>BSNL</strong>/ Govt. of India is allowed to work as a contractor for a period oftwo years of his retirement from service without the prior permission. The contract is liable to becancelled if either the contractor or any of his employees is found at any time to be such aperson who had not obtained the permission as aforesaid before submission of tender andengagement in the contractor’s service.14. The tender for the works shall not be witnessed by the contractor who himself/themselveshas/ have tendered or who may and has/have tender for the same work. Failure to observethis condition would render tenders of the contractors tendering as witnessing the tender is/areliable for summarily rejection.15. It will be obligatory on the part of the tenderer to sign each page of the Schedule of workand the tender documents for all the component parts and after the work is awarded he willhave to enter into a separate agreement for each component with the officer concerned.16. Any tender not submitted in proper manner or if it contains too many corrections, overwritings of absurd rates, and absurd amount will be liable to be rejected and the <strong>BSNL</strong> will be atliberty to take such action as it may deem fit without any reference to the tenderer.17. The tenders for the work shall remain open for acceptance for a period of 90 days fromthe date of opening of the tenders.If any tenderer withdraws his tender before the said period or makes any modification inthe terms and conditions of the tender which is not acceptable to the <strong>BSNL</strong> shall, withoutprejudice to any other right of remedy be at liberty to forfeit 50% (fifty percent only) of the saidearnest money absolutely.18. Extension of validity: In case, where the letter of award of work cannot be placed withinthe validity period of the tender, the <strong>BSNL</strong> can request all tenderers to extend the validity oftheir respective tenders and the Earnest Money deposit by a reasonable period. In suchcases, extension of validity of Earnest Money deposit by 30 days beyond the extended validitydate of tender should also be asked for. While <strong>BSNL</strong> can make the request for extension, thetenderer is free to either extend the validity or refuse the request to extend the validity.Contractor Internet Downloaded copy Executive Engineer (E)Page 16 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW - 6.19. Unsealed tenders will be summarily rejected.20. The contractor should read the tender documents carefully before submitting the tender.21. Agreement shall be drawn with the successful tenderer on prescribed form. Tenderer shallquote his rates as per various terms and conditions of the said form, which will form part of theagreement.22. The tenderer shall furnish a declaration to this effect (incase downloaded tender)that no addition/deletion/correction have been made in the tender document submitted andis identical to the tender document appearing on website. Every page of downloadedtender shall be signed by the tenderer with stamp (seal ) of his firm /organization.23. This Notice Inviting Tender shall form part of the Contract document. The successfultenderer/contractor on acceptance of his tender by the Accepting authority, shall, within 15days from the stipulated date of start of the work, sign the contract consisting of :-a) The Notice Inviting Tender, all the documents including additional conditions,specifications and drawings, if any forming the tender as issued at the time ofinvitation of tender and acceptance thereof together with any correspondenceleading thereto.b) Standard form.24. ELIGIBILITY CRITERIA:- As per page 3 of this DocumentSignature of Executive Engineer (E)Electrical Division - IFor and on behalf ofBharat Sanchar Nigam Limited.ContractorExecutive EngineerEE/CONTRContractor Internet Downloaded copy Executive Engineer (E)Page 17 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.<strong>BSNL</strong> EW-8BHARAT SANCHAR NIGAM LIMITED(A Government of India Enterprise)ZONE: <strong>Chennai</strong> <strong>Telephones</strong>DIVISION - ED – IBRANCH: EWSUB DIVISION, IVName of Work:- Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.(i) Issued to (contractor) _____________________________________(ii) Tender Cost __________________(iii) Receipt No. _____________iv) Date of application ____________(v) Date of issue_____________(vi) Signature of officer issuing the documents _______________________(vii) Designation________________________________________________(B)(i) To be submitted by (time) _____hours on (date)________ to____________________________________________________________(ii) To be opened in presence of tenderers who may be present at ______ hours on_________ in the office of ____________________________T E N D E R1. I/we have read and examined the notice inviting tender, schedule, specifications applicable,Drawings & Designs, General Rules and Directions, Conditions of Contract, clauses of contract,special conditions, Schedule of Rates and other documents and Rules referred to in theconditions of contract and all other contents in the tender document for the work.2. I/We hereby tender for the execution of the work specified for <strong>BSNL</strong> within the time specified,schedule of quantities and in accordance in all respects with the specifications, designs,drawings and instructions and other documents and Rules referred to in the conditions ofcontract and all other contents in the tender document for the work.3. I/We agree to keep the tender open for ninety (90) days from the due date of submissionthereof and not to make any modifications in its terms and conditions.4.A sum of Rs.2,782/- is hereby forwarded in the form of Deposit at call receipt/FDR//Bankguarantee of a Nationalised / Scheduled Bank as earnest money. If I/We, fail tocommence the work specified I/We agree that the said <strong>BSNL</strong> shall without prejudice toany other right or remedy, be at liberty to forfeit the said earnest money absolutely andthe same may at the option of the competent authority on behalf of <strong>BSNL</strong> be recoveredwithout prejudice to any other right or remedy available in law out of the deposit in sofar as the same may extend in terms of the said bond and in the event of deficiency outof any other money due to me/us under this contract or otherwise.Contractor Internet Downloaded copy Executive Engineer (E)Page 18 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW -85. Should this tender be accepted, I/We agree to execute all the works referred to in thetender documents upon the terms and conditions contained or referred to therein and to carryout such deviations as may be ordered up to maximum of percentage mentioned in clause12.3 of the tender form and those in excess of that limit at rates to be determined inaccordance with provisions contained in clause 12.2.6. I/we agree to furnish to <strong>BSNL</strong> Deposit at call receipt/FDR/ Bank guarantee of a Nationalised/Scheduled Bank for an amount equal to 5% of the contract value in a standard format withintwo weeks from the date of issue of award letter. I/We agree to keep the performance bankguarantee valid for one year from the date of actual completion of work.7. I/We hereby declare that I/We shall treat the tender documents drawings and other recordsconnected with the work as secret/confidential documents and shall not communicateinformation/derived therefrom to any person other than to whom I/We am/are authorised tocommunicate the same or use the information in any manner prejudicial to the safety orinterest of <strong>BSNL</strong>.Signature of Witness(Required in the case ofcontractor’s thumb impressionis given by the contractor in placeof signature ) (Signature of contractor )(Name & Postal address)Seal of ContractorDate:Occupation of WitnessA C C E P T A N C EThe above tender (as modified by you as provided in the letters mentioned hereunder) isaccepted by me for and on behalf of <strong>BSNL</strong> for a sum of Rs. ______ (Rupees_________________________________________________________ )The letters referred to below shall form part of this contract Agreement.a)b)For & on behalf of <strong>BSNL</strong>Dated …………Signature _____________DesignationContractor Internet Downloaded copy Executive Engineer (E)Page 19 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW - 8 GENERAL RULES AND DIRECTIONS1. All works proposed for execution by contractor will be notified in a form of invitation toTender displayed on Notice Board in select <strong>BSNL</strong> offices and signed by the officer invitingtender or by publication in News papers/internet (designated web page) as the casemay be.2. This form will state the work to be carried out, as well as the date of submitting and openingtenders and the time allowed for carrying out the work; also the amount of earnest money tobe deposited with the tender, and the amount of performance guarantee to be deposited bythe successful tenderer(s). Copies of the specifications, designs and drawings and any otherdocuments required in connection with the work signed for the purpose of identification by theOfficer inviting tender shall also be open for inspection by the contractor at the office of Officerinviting tender during office hours.3. In the event of the tender being submitted by a firm it must be signed by the authorizedsignatory.4. Receipts for payments made on account of work when executed by a firm, must also besigned by authorized signatory.5. Any person who submits a tender shall fill up the usual printed form stating at what rate he iswilling to undertake each item of the work. Tenders, which propose any alteration in thework specified in the said form of invitation to tender, or in the time allowed forcarrying out the work, or which contain any other condition of any sort, includingconditional rebates will be summarily rejected. However, tenders with unconditionalrebate will be acceptable. No single tender shall include more than one work, butcontractors who wish to tender for two or more works shall submit separate tender foreach. Tenders shall have the name and number of the works to which they refer written on theenvelopes.The rates(s) must be quoted in decimal coinage. Amounts must be quoted in full rupees byignoring fifty paise and considering more than fifty paise as rupee one.6. The Officer inviting tender or his duly authorised assistant will open tenders in thepresence of any intending contractors who may be present at the time, and will enter theamounts of the several tenders in a Comparative Statement in a suitable form. In theevent of a tender being accepted a receipt for the earnest money forwardedtherewith shall thereupon be given to the contractor who shall thereupon for thepurpose of identification sign copies of the specifications and other documents mentioned inRule 1.In the event of a tender being rejected, the earnest money forwarded with suchunaccepted tender shall thereupon be returned to the contractor remitting the samewithout any interest.7. The officer inviting tenders shall have the right of rejecting all or any of the tenders, and, willnot be bound to accept the lowest or any other tender.8. The receipt of an accountant or clerk for any money paid by the contractor will not beConsidered as any acknowledgement of payment to the Officer inviting tender and thecontractors shall be responsible for seeing that he procures a receipt signed by theconcerned Accounts Officer.Contractor Internet Downloaded copy Executive Engineer (E)Page 20 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW - 89. The memorandum of work tendered for and the schedule of materials form is issued. If aform is issued to an intending tenderer without having been so filled in and incomplete, he shallrequest the officer to have this done before he completes and delivers his tender.10. The tenderer shall sign a declaration under the officials Secret Act, 1923 for maintainingsecrecy of the tender documents drawings or other records connected with the workgiven to them. The unsuccessful tenderers shall return all the drawings given to them.11. Rates quoted by the Contractor in the tender both in figures and words shall beaccurately filled-in so that there is no discrepancy in the rates written in figures & words.However, if a discrepancy is found the rates which correspond with the amount workedout by the contractor shall unless otherwise proved be taken as correct. If the amount of anitem is not worked out by the contractor or it does not correspond with the rateswritten in either in figures or words then the rates quoted by the contractor in words shall betaken as correct. Where the rates quoted by the contractor in figures and in words tallybut the amount is not worked out correctly, the rates quoted by the contractor willunless otherwise proved be taken as correct and not the amount.12. Performance Guarantee: The contractor is required to furnish performance guaranteefor an amount equal to 5% of the contract value in the form of bank guarantee / CDR/FDR/DD(of a nationalized / Scheduled Bank in a standard format) within two weeks from thedate of issue of award letter. The validity period of the performance security in theform of performance bank guarantee shall be one year from the date of actualcompletion of work.Security deposit: In addition to performance guarantee stated above, a sum @ 10% of thegross amount of the bill shall be deducted from each running bill of the contractor till thesum be deducted with the sum already deposited as earnest money, will amount tosecurity deposit of 5% of the Tendered value of the work13. All rates shall be quoted on the tender form. The amount for each item should be workedout and requisite totals given. Special care should be taken to write the rates in figures aswell as in words and the amount in figures only, in such a way that interpolation is notpossible.The total amount should be written both in figures and words. In case of figures,the word ‘Rs.’ Should be written before the figure of rupees and word ‘P’ after the decimalfigures, e.g. ‘Rs.2.15 P’ and in case of words, the word, ‘ Rupees’ should precede and theword ‘Paise’ should be written at the end. Unless the rate is in whole rupees andfollowed by the word ‘only’ it should invariably be upto two decimal places. Whilequoting the rate in schedule of quantities, the word’ ‘only’ should be written closely followingthe amount and it should not be written in the next line.14A The bidder shall give the total composite price inclusive of all Central & state’s levies andtaxes i.e Sales-tax, purchase tax, turnover tax, service tax, works contract tax etc. or any othertaxes or duties like octroi, local area development tax on materials/ labor etc. Howeverthe evaluation and comparison of respective bids shall be done on the basis of net cost to<strong>BSNL</strong> on the prices of the goods offered inclusive of duties and taxes (but –excludingCENVAT-able duties and taxes) sales ,tax, packing, forwarding ,freight and insurancecharges as per existing <strong>BSNL</strong> policies.14.B The total composite price shall comprise of unit price and all other components ofprice need to be individually indicated quoted against the goods/material/service ,itproposes to supply under the contract in the following manner:-Contractor Internet Downloaded copy Executive Engineer (E)Page 21 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar)@ Madhavaram TE Bldg, <strong>Chennai</strong>.i) The Basic Unit Price (Ex-Factory Price) of the goods /services/ materials Excise Duty,Sales Tax, Freight, Forwarding ,Packing , service tax, insurance and any otherl levies/charges already paid or payable by the contractor/ supplier shall be quoted separately .ii) The liability to pay all taxes ,levies ,etc shall be of contractor and <strong>BSNL</strong> will notentertain any claim whatsoever in this respect..14C No confessional form except Sales Tax form ‘C’ for the items as specified in theschedule of works and meant for use in <strong>BSNL</strong>, shall be provided by <strong>BSNL</strong>. Form ‘ C’ shall beprovided by the <strong>BSNL</strong> only on the specific request of the contractor.”• For the purpose of evaluation of financial Bid,composite price inclusive of all taxesand levies will be considered .• The unit wise cost /break up is necessary for the purposes of information andverification of composite price so quoted by the contractor/supplier.• The contractor supplier shall submit to <strong>BSNL</strong> documents /proof of payment of al taxes/levies alongwith exemption certificate if any ,to avail CENVAT benefits by <strong>BSNL</strong>.• However the evaluation and comparison of respective bids shall be done on thebasis of net cost to <strong>BSNL</strong> on the prices of the goods offered inclusive of duties and taxes(but –excluding CENVAT-able duties and taxes) sales ,tax, packing, forwarding ,freight andinsurance charges as per existing <strong>BSNL</strong> policies.15.A However, pursuant to the constitution (forty-sixth amendment) act, 1982, if anyfurthertax or levy is imposed by statute, after the last date of receipt of tenders, and thecontractors thereupon necessarily and properly pays such taxes/ levies, the contractorshall be reimbursed the amount so paid, provided such payment, if any, is not in theopinion of Superintending engineer (whose decision shall be final and binding) beattributable to delay in execution of work within the control of contractor.15 B In case of statutory variation in regard to excise duty , only in respect of packageAC units, EA set and Lifts . within the stipulated date of completion of individual agreement,the same shall be paid or recovered as per the actual against documentary proof .However, beyond this period <strong>BSNL</strong> will take advantage of any duty reduction but will not payextra on account of duty increase. Price adjustment provision on account of change inexcise duty shall not apply in respect of equipment/components of equipment/materials,other than package AC units, EA set and lifts.15.C The contractor shall, keep necessary books of account and other documents forthe purpose of this condition as may be necessary and shall allow inspection of the same by aduly authorised representative of <strong>BSNL</strong> and further shall furnish such other information/document as engineer-in-charge may require .16 The Contractor shall, within a period of 30 days of imposition af any further tax or levy inpursuant to the constitution of (forty sixth amendment) act 1982 give a written noticethereof to the Engineer-in-charge that the same is given pursuant to this condition,together with all necessary information relating thereto.17 <strong>BSNL</strong> shall deduct work contract tax, income tax and other statutory deductions frompayments due to the firm as per rules of the State/Central Government. The AccountsOfficer of the concerned Division shall issue certificates for such deductions to the firm.18 The tender for the work shall not be witnessed by a contractor or contractors whohimself/ themselves has/have tendered or who may and has/have tendered for the same work.Failure to observe this condition would render, tenders of the contractors tendering, as well aswitnessing the tender, liable to summary rejection.Contractor Internet Downloaded copy Executive Engineer (E)Page 22 of 38


Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW - 819. Other agencies will also simultaneously execute the works like horticulture, externalservices, installation of telephone exchange equipment and other building works for thesame project along with this work in particular. The contractor shall afford necessaryfacilities for the same. No claim in the matter shall be entertained.20. Some restrictions may be imposed by the security staff etc. On the working and/ormovement of labour, material etc., The contractor shall be bound to follow all suchrestrictions /instructions and nothing extra shall be payable on this account.21. The contractor shall comply with the provisions of the Apprentices Act 1961, and therules and orders issued there under from time to time. If he fails to do so, his failure will bea breach of the contract and the Engineer-in-charge may in his discretion withoutprejudice to any other right or remedy available in law cancel the contract. Thecontractor shall also be liable for any pecuniary liability arising on account of any violationby him of the provisions of the said Act.22. No engineer of gazetted rank or executive of <strong>BSNL</strong> employed in engineering oradministrative duties in an engineering department of the government of India/<strong>BSNL</strong> isallowed to work as a contractor for a period of two years of his retirement fromgovernment service without the previous permission of government of India/<strong>BSNL</strong>.Thiscontract is liable to be cancelled if either the contractor or any of his employee isfound at any time to be such a person who had not obtained the permission ofgovernment of India as foresaid, before submission of the tender or engagement inthe contractor's service as the case may be.23. Near relatives of all <strong>BSNL</strong> employees either directly recruited or on deputation areprohibited from participation in tenders and execution of works in the different units of <strong>BSNL</strong>.The near relatives for this purpose are defined as:a) Members of a Hindu Undivided family.b) They are husband and wife.a) The one is related to the other in the manner as father, mother, son(s) & son'sWife (daughter-in-law), Daughter(s) & daughter’s husband (son-in-law), brother(s) &Brother’s wife, sister(s) & sister’s husband (brother -in-law).24. The company or firm or any other person is not permitted to tender for works in<strong>BSNL</strong>Unit in which his near relative(s) is(are) posted. The unit is defined as SSA/Circle/ChiefEngineer/Chief Archt./Corporate office for non executive employees and all SSA in acircle including circle office/Chief Eng./Chief Archt./Corporate office for executiveemployees (including those called as Gazetted officers at present). The tenderer shouldgive a certificate that none of his/her such near relative is working in the units as definedabove where he is going to apply for tender/work, for proprietorship firm certificate will begiven by the sole proprietor, for partnership firm, certificate will be given by the authorizedsignatory.Any breach of these conditions by the company or firm or any other person, thetender/work will be cancelled and earnest money/performance guarantee will be forfeitedat any stage whenever it is so noticed. <strong>BSNL</strong> will not pay any damages to the company orfirm or the concerned person. The company or firm or the person will also be debarred forfurther participation in the concerned unit.Contractor Internet Downloaded copy Executive Engineer (E)Page 23 of 38


Name of Work: :-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.B S N L EW - 8The format of the certificate to be given is"I……………………………………………Son of Sh ……………………………………………………………………………....Resident of……………………………………………………………………………….Hereby certify that none of my relative(s) as defined in the tender document is/are employed in<strong>BSNL</strong> unit as per details given in tender document. In case at any stage, it is found that theinformation given by me is false/incorrect, <strong>BSNL</strong> shall have the absolute right to take anyaction as deemed fit/without any prior intimation to me".(Seal of the firm) ( Signature of Contractor )ContractorInternet Downloaded copyPage No. 24 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.MODIFICATIONS TO NEW <strong>BSNL</strong> EW 6 & EW8(IN CASE OF SINGLE BID SYSTEM)Sl.ReferencePg.New EW 6To be read asNo.No.1. Para 3(a) 2. Does Not Exist If a holiday is declared on the tender opening day, the tender will beopened on the next working day.2. Para 6 (a) 2. In case of e-tendering ,eachDeleted.tender should be in twosealed coves, first containingcredentials for meeting theEligibility conditions alongwith the cost of tenders andEMD in proper form, secondcover containing tenderdocuments. The credentialsshall be self attested andcertified by any <strong>BSNL</strong>Executive. If not certified by<strong>BSNL</strong> Executive then originaldocuments shall be producedat the time of tender opening.3. Para 6 (a)(ii) 3. Does not Exist. E-TENDERINGThe tender documents consisting of plans, specifications,schedule of quantities of the various classes of work to be doneand the set of terms and conditions of the contract to be compliedwith by the contractor, whose tender may be accepted and allother relevant information / documents / drawings pertaining to thework can be downloaded for quoting the tender from our websitewww.tamilnadu.bsnl.co.in.Submission of tenders:- In case the tender documentsare downloaded from the internet, the bids shall be submitted asper two envelope system as described below:The tenderer shall submit the tender in two nos. separate sealedenvelopes marked as Envelope 1 and Envelope II. The name of thework, name of tenderer, last date of receipt of tender should bementioned on each envelope. After verification of the contents ofenvelope I, then second envelope containing the bid document shall beopened. If Envelope-I is not annexed or the documents submitted in theEnvelope-I are found incomplete or not in proper form againstrequirements as given below herein, then the Envelope-II containingprice bid will not be opened at all and shall be returned to the tenderer onthe spot if the tenderer is present at the time of tender opening.oThe envelope-I shall contain the following:-• Cost of bid documents (which shall not be refunded,even if bidder is found ineligible for issue of tender documents) inform of a separate demand draft of a scheduled Bank orNationalized Bank / State Bank guaranteed by Reserve Bank ofIndia drawn in favour of A.O., <strong>BSNL</strong>, Electrical Division, CHENNAI• Earnest money as per para 6(a) of EW-6 in the form ofCDR/FDR/DD/BG of a nationalized/scheduled bank guaranteed bythe Reserve Bank of India drawn in favour of A.O., <strong>BSNL</strong>Electrical Division , CHENNAI (Proforma as per Annexure-I forBG).Self Attested Copy of PAN card issued by I/Tax Department.Self Attested copy of Chartered Accountant Certificate for turnover.Self Attested copy of Service Tax Registration Certificate.Self attested Documents for establishing eligibility. The testimonialsregarding the list of works satisfactorily completed (at least for the requisitemagnitude) should be obtained from an Officer not below the rank ofExecutive Engineer in the organization concerned.ContractorInternet Downloaded copyPage No. 25 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.Sl.No.ReferencePg.No.New EW 6To be read as• Self Attested copy of EPF Registration Certificate(ifapplicable)oThe envelope-II shall contain the following:-• Bid Document with the price break up filled innumerals and in words and duly signed in all pages.4. Para 7 3. (a) The contractor shouldsubmit and confirm CharteredAccountant Certificate inrespect of turnoverand other registration certificate[Enlistment in <strong>BSNL</strong>, ElectricalLicense, Sales Tax] withattested copies(self attested and counterattested by any executive of<strong>BSNL</strong>/MTNL or Gazetted officerof GOI) asapplicable along with theapplication on printed letterhead for purchase of tender.b)The contractor shall submitand confirm his permanentaccount number (PAN) issuedby the Income TaxDepartment.c) The tenderer should submitthe valid WCT/ Sales Tax/ VATregistration certificate.The tender documents consisting of plans, specifications,schedule of quantities of the various classes of work to bedone and the set of terms and conditions of the contract to becomplied with by the contractor, whose tender may beaccepted and all other information/documents/drawingspertaining to the work will be open for inspection by tendererand can be had from the Office of Executive Engineer (E),<strong>BSNL</strong>, Electrical Division I , CHENNAI between 11.00 hours &16.00 hours every working day except on Sundays and PublicHolidays on payment of an amount as per para 2(a) of EW-6.The cost of tender documents deposited along with applicationfor tender issue shall not be refunded, even if bidder is foundineligible for issue of tender documents.The firms shall submit application for issue of tenderdocuments on its printed letter head, accompanied with SelfAttested Copies of the following documents in support offulfilling the eligibility criterion:a)The testimonials regarding the list of works satisfactorilycompleted (at least for the requisite magnitude) obtained froman Officer not below the rank of Executive Engineer in theorganization concerned.b)Chartered Accountant Certificate for turnover with a copy ofPAN card issued by Income Tax Department.c)Service Tax Registration Certificated)EPF Registration Certificate (if applicable)ContractorInternet Downloaded copyPage No. 26 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.Sl.ReferencePg.New EW 6To be read asNoNo.5. Para 24(a) 5. Does not Exist i) If it is found at any stage of tender scrutiny aftersubmission of tender that the bidder has made anycorrection/addition/alteration/omission in tenderdocuments vis-à-vis tender documents available on thewebsite / original Draft NIT in office, the bid shall betreated as non-responsive and shall be summarilyrejected and the EMD deposited by the tenderer shall beforfeited in addition to any other action as per prevalentrules.ii)The conditional tender or tenders with conditionalrebate shall be summarily rejected.iii) The tenderer shall submit the original computerprintout of the tender documents downloaded from theinternet. Photocopy shall not be accepted.iv) The Tender documents shall not be sent throughthe Courier/Post. Tender documents received throughCourier/post shall not be opened/considered at all.v) All communication with the bidders shall be inwriting. Fax / E-mail shall be covered under this category6. Para 25 5. This Notice Inviting Tendershall form part of the Contractdocument. The successfultenderer/contractor onacceptance of his tender bythe Accepting authority, shall,within 15 days from thestipulated date of start of thework, sign the contractconsisting of :-a) The Notice Inviting Tender,all the documents includingadditional conditions,specifications and drawings, ifany forming the tender asissued at the time of invitationof tender and acceptancethereof together with anycorrespondence leadingthereto.b) Standard form.7. Para 25(ii) 5. Does not exist EPF PROVISIONS:-and considered as adequate means of communication.The Notice Inviting Tender shall form part of the contractdocument, in accordance with clause-1 of the contract. Thecontract shall be deemed to have come into effect on issue ofcommunication of acceptance of tender. On such communicationof acceptance, the successful tenderer /contractor shall within15 days from such date, formally sign the contract consisting of:-(a) The Notice Inviting Tender, all the documentsincluding additional conditions, specifications anddrawings, if any, forming part of the tender and as issued atthe time of invitation of tenders and acceptance thereoftogether with any correspondence leading thereto.(b)Standard E.W.-8 Form.The agency has to comply with the provisions of EPFand miscellaneous provisions Act-1952 and employeesprovident fund scheme-1952 as amended up to date in respectof labours/employees engaged by them for this work. Anyconsequence arising due to non- complying of provisions asspecified above shall be the sole responsibility of the firm only.The agency shall give an undertaking to this effect as per theprescribed proforma (UNDERTAKING REGARDING EPFPROVISIONS)ContractorInternet Downloaded copyPage No. 27 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.Sl.ReferencePg. No.New EW 8To be read asNo1. Para 2 of“Tender”2. Para 2 of“GeneralRules andDirections”3. Para 14©of “GeneralRules andDirections”.6. I/We hereby tender for theexecution of the workspecified for <strong>BSNL</strong> within thetimespecified, schedule ofquantities and inaccordance…8. …and the amount ofperformanceguarantee to be deposited bythe successful tenderer(s).10. For the purpose of evaluationof financial Bid,compositeprice inclusive of all taxesand levies will be considered .The unit wise cost /breakup is necessary for thepurposes of information andverification of composite priceso quoted by thecontractor/supplier.The contractor suppliershall submit to <strong>BSNL</strong>documents /proof of paymentof altaxes /levies alongwithexemption certificate if any ,toavail CENVAT benefits by<strong>BSNL</strong>However the evaluationand comparison of respectivebids shall be done on thebasis of net cost to <strong>BSNL</strong> onthe prices of the goods offeredinclusive of duties andtaxes (but –excludingCENVAT-able duties andtaxes)sales ,tax,packing,forwarding,freight and insurance chargesas per existing <strong>BSNL</strong> policies.I/We hereby tender for the execution of the work specified for <strong>BSNL</strong>within the timespecified, as per the schedule of quantities and in accordance……and the amount of performanceguarantee to be deposited by the successful tenderer(s), and theamount of Security Deposit to be deducted from the bills.• The evaluation and comparison of responsivebids shall be done on the basis of Net cost to <strong>BSNL</strong> on theprices offered inclusive of duties and taxes (but excludingCENVAT – able duties & taxes), sales tax, packing, forwarding,freight and insurance charges etc., as indicated in the priceschedule.• Vendors should furnish the correct E.D. /Customs tariff Head in the price schedule. If the creditfor the Duties and Taxes under CENVAT credit rules, 2004 isfound to be not admissible at any stage subsequently owing towrong furnishing of Tariff Head, then the vendors will be liableto refund such non-admissible amount, if already paid, alongwith penalty if charged by the concerned authority.• In case the Duties & Taxes which are nonCENVAT – able as per the quotes indicated in the priceschedule by the vendors and subsequently at any stage it isfound that Credit for such Duties & Taxes is admissible as perCENVAT Credit Rules, 2004, then the vendors will be liable torefund the amount equivalent to such Duties & Taxes if alreadypaid to them. However, <strong>BSNL</strong> may allow the supplier to submitnecessary documents in this regard which may enable <strong>BSNL</strong> toavail the CENVAT credit provided such credit is still availablefor the amount so paid as per CENVAT Credit Rules 2004.• <strong>BSNL</strong> reserves the right to ask the bidders tosubmit documentary proof confirming the correct Tariff Headfrom the E.D. / Customs authority where the Tariff Headfurnished against the particular tendered item by differentbidders differs from each other or the same is found apparentlynot furnished in accordance with E.D. / Customs Tariffnotifications.4. Para 25 of“GeneralRules andDirections”.• If the supplier fails to furnish necessarysupporting documents i.e. Excise / Customs invoices etc. inrespect of the Duties / Taxes which are Cenvatable, theamount pertaining to such Duties / Taxes will be deducted fromthe payment due to the firm.• Invoice shall clearly indicate break up details ofcomposite price i.e. Basic, E.D., Sales Tax, any other Dutiesand Taxes, Freight / Packing Charges, Service Tax etc.12. Does not exist Agency has to observe all the labour rules & regulation in force.Agency shall be fully responsible for any violation observed at anytime.ContractorInternet Downloaded copyPage No. 28 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.Sl.ReferenceNo5. Para 26 of“GeneralRules andDirections”.6. Para 27 of“GeneralRules andDirections”.7. Para 8.1 of“ConditionsofContract”.Pg.No.New EW 8To To be read as12 Does not exist Bye laws Indemnity against liabilities• The contractor shall comply with all by laws andregulations of the local and statutory authoritieshaving jurisdiction over the works and shall beresponsible for payment of all fees and othercharges and giving and receiving all necessarynotices and keep the Engineer –in-charge informedabout the notices issued and received.• The contractor shall indemnify the departmentagainst all claims in respect of patent rights design,trademark or name of other protected rights inrespect of any plant, machine, work or materialsused for or in connection with the works ortemporary works and from and against all claimsdemands, proceedings, costs, charges andexpenses whatsoever in respect of or in relationthereto. The contractor shall defend all actionsarising from such claims and shall himself pay allroyalties, License fees, damages , costs andcharges of all and every sort that may be legallyincurred in respect hereof shall be borne by thecontractor.• All liabilities / penal recoveries on matters arisingout of tax/excise /levies such as incorrectdeductions discrepancies in the filing of returns,revised assessments by the concerned authoritiesetc,. shall be borne by the contractor.12. Does not Exist Currency of contract:Rates quoted by the contractor shall be firm and shall bevalid for the currency of contract. No cost escalation shall bepermitted during the currency of contract.15. For rate contracts of Electrical Installation,NumberofBiddersinDistribution of QuantityAir Conditioning, Engine Alternator, SubwhomtheorderisStation and Fire Detection works,proposed to be placedwork/quantities of item of works can be2 (two) L1 shall be given 70%L2 shall be given 30%split amongst3 (three) L1 shall be given 50%. Remaining quanthe lowest of three agencies who agree toother selected bidders in INVERSE RAthe rates decided by <strong>BSNL</strong> in respect oftheir evaluated price.1st4 (four) L1 shall be given 40%. Remaining quanlowest in the following manner:-other selected bidders in INVERSE RAa) If the work stands distributed betweentheir evaluated price.the first three lowest tenderers, the5 (five) L1 shall be given 30%. Remaining quanproportion of work distributed shall be asother selected bidders in INVERSE RAbelow:-their evaluated price.For rate contracts of Electrical Installation, Air Conditioning, Engine50% to the lowest tenderer and remainingAlternator, SubStation and Fire Detection works, work/quantities ofquantities to other two tenderers initem of works can be split amongst the lowest agencies who agreeINVERSE RATIO of their Evaluated price. to the rates decided by <strong>BSNL</strong> in respect of 1 st lowest in the followingb) In case it is decided to split the work manner:-amongst the first two lowest firms, the In case lowest evaluated price (L1) is not accepted by otherproportion of work distribution shall be as. bidders <strong>BSNL</strong> reserves the right to award the entire quantity underthis tender on the bidder(s) with lowest evaluated price.ContractorInternet Downloaded copyPage No. 29 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.Sl.No.Reference8. Clause 7.3of “ClausesofContract”.Pg. No.New EW 6follows:i) 70% to the first lowest tenderer.ii) 30% to the second lowest tenderer.In case the tenderers other than lowest tenderer does notagree to match the rates of L1then 100% works shall be awarded to the lowesttenderer.22. Payment to the contractors for Air Conditioning, EngineAlternator, Sub Station, Lifts, firedetection, fire fighting and other specialised items, duringprogress of work, will beregulated as below :-a) 80% of prorata of the approved price breakup ofcontract value on receipt ofequipment at site and after satisfactory physicalinspection.b) 10% of prorata of the approved price breakup ofcontract value after successfulinstallation of equipment.c) 5% of the approved contract value after successfulcompletion of Initialacceptance testing.d) 5% of the approved contract value after successfulcompletion of the finalacceptance testing.e) For the works where A/T is not applicable e.g. forsubstation, lift, fire fighting etc.5% of the approved contract value shall be released afterclearance by Electricalinspector/ lift inspector/ Fire officer respectively.To be read asDeletedContractorInternet Downloaded copyPage No. 30 of 38EE(E)/SDE(E)


Name of Work: :-Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.Name of Work:- Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @Madhavaram TE Bldg, <strong>Chennai</strong>.S.No(1)Description of Item(2)Sub Head I: SparesSupplying the following spares of 125 KVAtrolley mounted E/A set etc asrequired.(Make:- Kirloskar, Model - 6SL90)Note:- The rate quoted Shall be inclusive ofVAT as applicable.1 Piston assemblyMaterial Rate in Words2 CR BearingMaterial Rate in Words3 Rings setMaterial Rate in Words4 Overhauling gasket kitMaterial Rate in Words5 Head gasketMaterial Rate in Words6 ValvesMaterial Rate in Words7 GuidesSCHEDULE OF QUANTITIESQty Unit(3) (4)6Nos6pair6Set1kit6Nos12Nos12NoseachpairsetkiteacheacheachMaterial CostRate(5)Amount{(3)x(5)}(6)Labour Cost (Exclusive ofService tax)Rate Amount(7) {(3)x(7)}(8)For items under Sub Head Ithe rate quoted shall be for materialonlyContractorInternet Downloaded copyPage No. 31 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.Material Rate in Words8 Seals12NoseachMaterial Rate in Words9 Stem sealMaterial Rate in Words10 CoolantsMaterial Rate in Words11 Cylinder lining with o ringsMaterial Rate in Words12 Filters kitMaterial Rate in Words13 RTV pasteMaterial Rate in Words14 LuboilMaterial Rate in Words15 Water pump assembly1Material Rate in WordsSub Head II: Machine Shop Works12Nos3lts6Nos1kit2Nos30lts1NoseachltreachkiteachltreachLabour charges for calibration of cylinder head,fixing of guide,seat and pressure testing thecylinder head etc complete as required 6 job jobMaterial Rate in WordsLabour Rate in Words2 Labour charges for calibration of injector etc asrequired 6 job jobMaterial Rate in WordsLabour Rate in WordsContractorInternet Downloaded copyPage No. 32 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set (Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.3Labour charges for fixing of the spares as listedin Sub Head I, for 125 KVA E/A set i/cdismantling and removing the existing faultyitem, replacing the same with new item, i/cmachine shop work and transportation if anyrequired, reassembling, testing andcommissioning etc complete as required 1 job jobMaterial Rate in WordsLabour Rate in WordsTotal Amount of material cost (A)(for Sub Head I and Sub Head II) Rs.Total Amount of Labour Cost (B)( For Sub Head II) Rs.Add Service Tax on Labour Cost @12.36%(C)Service Tax Registration No.Grand Total in Rupees.(Inwords)_____________________________________________________________Note to the contractors1. The evaluation and comparison of responsive bids shall be done on the basis of net cost to <strong>BSNL</strong> on the prices offered inclusive of duties and taxes (but excluding CENVAT able duties andtaxes like Service Tax etc.) as indicated in the price schedule.2.WCT @ 4% will be deducted from the bill by the <strong>BSNL</strong> and will be remitted to the commercial TAX Department. In case supplier/contractor brings exemption certificate from the commercial taxdepartment, the WCT shall not be deducted at source.3. The firm shall be responsible to see that service tax tariff shown in the above column are correct & CENVAT credit for the amount shown above are admissible as per CENVAT credit rules 2004.the contractor should quote the service tax at the prescribed rate only at the time of the tender. In case contractor has quoted service tax in excess/short than the prescribed rates, the quotedservice tax amount will be brought to the prevailing rates to avoid confusion in awarding the tender.4.The firm should submit the serially numbered invoice/ Bill showing the service tax separately to avail the CENVAT credit by the <strong>BSNL</strong>.5. The agency shall mention the service tax registration number and the amount of service tax component in the bill copy/invoice6. The contractor should submit the proof of payment to the AO(Cash) for the service tax remitted (showing details i.e Agreement No., Bill No, Name of work, amount paid ands date of payment)If any levy/duty is not payable or documentary proof is not produced, the amount for the same shall be deducted.7. The rates for all items of work shall, unless clearly specified otherwise, include cost of all labour, materials and other inputs involved in the execution of the items as specified in the scope ofwork.Additional Conditions1. The firm shall carryout transportation of the dismantled items TO THE WORKSHOP AND BACK WITH OUT ANY EXTRA COST.2. For items under Sub Head I, the rate quoted shall be for material only.3. The spares used shall be of reputed make.4. A site Engineer with valid license shall be posted for works like OVERHAULING, calibration testing and commissioning etc of the EA set. Necessary fuel for commissioning of the DG set shall be arrangedby the Department.CONTRACTOREXECUTIVE ENGINEER(E)ContractorInternet Downloaded copyPage No. 33 of 38EE(E)/SDE(E)


Name of Work: :-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.SPECIFICATIONS FOR EI & FANSThe work shall be done as per current CPWD Specification. For Electrical worksamended from time to time & Indian Electricity Rules as attended up to date.The work shall be supervised by qualified technical staff of the Contractor.The layout of the work will be given by the Engineer in charge or his duly authorizedrepresentative at the site of work.The following wiring shall be done in separate conduits:-A) Power plug wiring.B) Light & Fan point wiring.C) Emergency Light point wiring(AC Supply/DC Supply)D) Telephone wiring.E) Clock wiring.F) AC Unit wiring.The number of power plug points, and emergency light points fed from DC supply shall notexceed two per circuit in any of the cases.The earthing sets shall be provided in presence of engineer in charge or his authorizedrepresentative.Sample of all the materials, fittings, accessories, IC switch gears etc., shall be gotapproved from the Engineer in-charge before using the same on work. The rejectedmaterials shall be removed immediately from the site of work.The Contractor will be have to carry out the following tests at his cost and intimatetest results before final bills are paid. Nothing extra will be paid to him on this account.A) Earth Test b) Polarity test c) Insulation testd) Earth continuity test of the surface/recessed conduits.Any damage done to the building, by the Contractor during the execution ofwork shall have to be made god at his cost and risk. If he does not do it himselfwithin a reasonable time determined by the Engineer In-charge the same will begot done at his cost departmentally after notice given to him.The outlet boxes, IC BOXES for Switches and end of conduits etc. of differenttypes of electrical wiring as mentioned in clauses above shall be paintedinside/outside with different colours each signifying the different categoriesmentioned so as to avoid mixing of various circuits and their wiring and nothingextra will be paid for this.At the time of laying conduit pipe in the slab in recess, the contractor shouldkeep fish wire of 16 SWG GI wire throughout conduit pipe and will have to takespecial care so that the conduit do not cross through AC ducts, grills, etc.The contractor should recess the conduits in the walls before they areplastered and in coordination with progress of building works. The conduit shouldbe mechanically and Electrically continues.ContractorInternet Downloaded copyPage No. 34 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.All the Switch board, SDB and DB shall be clearly sign written indicating thenumber/type of load/Circuit Nos. etc.Under ground cables of both 1.1 KV and 11 KV should be subject topressure/insulation tests before and after laying the same.While making end connections of wore, no strand shall be cut andtermination of wire shall be done with necessary lugs without any extra cost.The termination of conduits etc. in the junction box should be done bymaking proper holes instead of cutting the box.Rs.1/- per empty box for the ceiling fans, fittings and other items supplied bythe Department will be recovered from Contractor irrespective of the size of box.The Contractor will have to make arrangements to take the materials to siteof work at his own risk and cost.If any conduits are laid before the award of work, the same shall berecovered at rate mentioned in SR-94 (Internal) enhanced by abatement of similaritems in the tender.ALL MATERIALS SHALL BE “ISI” MARKED OR APPROVED BY THE <strong>BSNL</strong>.ContractorInternet Downloaded copyPage No. 35 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.ContractorLIST OF APPROVED MAKES-<strong>BSNL</strong> ELECTRICAL WING1 Engine Ashok Leyland /Cummins/ Cater pillar/KOEL/ Volvo Penta / Mahindra &Mahindra(up to 40 KVA) /Escorts (up to30 KVA)/ Eicher(up to 20 KVA)2 Alternator(Brushless) Crompton Greaves (AL. series) / KEC /LeroySomer / Stamford/Jyoti Ltd3 Battery (Lead Acid /Mntc. Free) Amara Raja / AMCO / Farukawa / Hitachi /Exide/ Prestolite / Standard4 HV Switchgear (Vacuum CircuitBreaker/SF6 )5 Transformer (Oil filled / Dry type)Biecco Lawrie / Crompton / Kirloskar /MEI /Jyoti Ltda) Above 400 KVA ABB / Schneider Electric /Andrew Yule/Bharat Bijlee / Crompton / EMCO /Kirloskar/ Siemensb) Up to 400 KVA In addition to abovemakes,Uttam/Automatic ElectricGear(AEG)/Patson/Rajasthan Transformerand Switchgear6 Air Circuit Breaker L&T/ Schneider Electric / Siemens7 MCCB(Ics=Icu) L&T/ Schneider Electric / Siemens8 SDF units L&T/ Schneider Electric /Siemens/HPL/Havells9 Power Contactors L&T/ Schneider Electric /Siemens/Lakshmi(LECS)10 Change Over Switch HPL / Havells / H-H Elcon11 Intelligent APFC Relay L&T/EPCOS(Siemens)/ Schneider Electric/Neptune Ducati/Syntron/ABB12 Bus Bar Trunking/Sandwiched Bus Duct Moeller/L&T/SchneiderElectric/ABB/Legrand/Zeta13 Power Capacitors (MPP/APP) L&T/EPCOS(Siemens)/ABB/Crompton/Schneider Electric/Neptune Ducati14 Digital/ KWHr meter Schneider Electric/ AE/ Digitron / IMP/Meco/ Rishabh /Universal/HPL/L&T/ABB15 Cold shrink HT/LT Cable Joint Denson / 3M(M-Seal )/ Raychem16 Rubber Matting ISI mark17 MCB/ lsolator /ELCB/RCCB/DistributionBoard18 MS/ PVC Conduit ISI markCrompton / Havells / lndokopp / MDSLegrand/ L&T / Schneider Electric/ Siemens /Standard/ C&S/ABB/HPL19 Cable Tray MEM/Bharti/Ratan/Slotco/Profab20 HT/LT Cables ISI mark21 PVC insulated copper conductor wire ISI mark22 Centrifugal Pump Amrut / BE / Beacon / Batliboi / Crompton /Jyoti / Kirloskar / KSB / Mather & platt /WASP/Grundfos23 Submersible Pump Crompton/Amrut / BE / Calama /Kirloskar /KSB24 Motors ABB/ Bharat Bijlee / Crompton Greaves /Schneider Electric / HBB / KEC/Siemens/Jyoti Ltd25 Fresh Air Fans GE / Khaitan/Almonard/Crompton26 Starter ABB / BCH / Schneider Electric / L&T/Siemens27 Single Phase Preventer L&T / Minilec / Siemens / ZerotripInternet Downloaded copyPage No. 36 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.28 GI/MS Pipe ATC / ATL / BST / GSI / ITC / ITS / IIA / JST /Jindal /TTA / Tata/Zenith29 Foot Valve ISI mark30 Gate Valve Advance/Audco/JohnsonControls/Zoloto/Annapurna / Fountain/Kirloskar / Leader / Sant / Trishul31 Compressors Carrier/Emerson copeland/York/Danfoss (forchillers only)32 Resin Bonded Glass wool Fibre Glass / Pilkingston / UP Twiga33 Expanded Polystyrene BASF(India) Ltd.34 Gauge Feibig / H.Guru / Pricol35FLICA / Honeywell / Indfoss / Penn-ControlsDanfoss / Ranco / Ranutrol / Sporland36Anfiltra Effluent / ARW / Athlete/Airtake/Fine FiltersDyna / Kirsloskar/ Puromatic/Purafill/Purolator / Tenacity37HSU Jindal / National / Nippon Denro /Sail /GI SheetTata38Appollo / Chemtron/ Edward /Heat DetectorFenwal/Hochiki / Nitton /SystemSensor/Wormald/Honeywell Essar/Notifier39Appollo / Cerebrus / Edward/ /FenwalIonization Detector/Hochiki / Nitton / System Sensor /Wormald40Appollo / Cerebrus / Edward /Photo Electric Smoke DetectorFenwal/Hochiki / Nitton / Wormald41Agni Instruments / Agni Devices/ ArunaFire Panel(Microprocessor based)Agencies/ Carmel Sensor / RavelElect./Honeywell Essar/Notifier/ NavinSystems42 Sprinkler/ Hose Reel & Hose Pipe ISI mark43 Fire Extinguisher ISI mark44 Lift OTIS, Kone, Mitsubishi , Schindler,JohnsonContractorInternet Downloaded copyPage No. 37 of 38EE(E)/SDE(E)


Name of Work: Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.ANNEXURELIST OF INDIAN STANDARSI.S.277 Galvanized steel sheets.I.S.325 Three Phase Induction MotorsI.S.655 Metal Air DuctsI.S.732 Code of Practice for Electrical Wiring and fittings for Buildings.I.S.778 Gun Metal Gate, Globe and Check Valves for general purposes.I.S.900 Code of Practice for Installation and Maintenance of InductionMotors.I.S.996 Single Phase small AC and Universal Motors.I.S.1239 Mild Steel Tubes, G.I. Pipes, Tubular and other wrought steel fittings.I.S.1248 Direct Acting Electrical Indicating Instruments.I.S.1520 Horizontal Centrifugal Pumps for clear, cold and fresh water.I.S.1554 PVC Insualted (heavy duty) Electrical Cables(Part-I) for working voltages upto and including 110 volts.I.S.2372 Timber for cooling towers.I.S.2516 AC Circuit Breakers.I.S.2592 Recommendation for Methods of Measurements of Fluid flow bymeans of Orifice Plates and Nozzles.I.S.1822 Motor Starters of Voltage not exceeding 1000 volts.I.S.2208 HRC Cartridge Fuse – Links upto 650 volts.I.S.3589 Electrically welded steel pipes for water, gas and sewage.I.S.3624 Bourden Tube Pressure and Vacuum Gauges.I.S.4047I.S.6392I.S.7403I.S.8148Heavy Duty air break switches and composite units of air reakswitches and fuses for voltage not exceeding 1000 volts.Steel Pipe Flanges.Code of Practice for Selection of Standard Worm and Helical GearBoxes.Specification for packaged air conditioning.IMPORTANT NOTEAll references to I.S.I. appearing in this specification may be read as Bureau ofIndian Standards, Latest amended versions.ANNEXURELIST OF SAFETY STANDARDSI.S.618 Code of Practice for safety and health requirements in Electrical andGas Welding and Cutting Operations.I.S.659 Safety code for Air Conditioning.I.S.660 Safety code for Mechanical Refrigeration.I.S.3016 Code of Practice for Fire precautions in welding and cutting operations.I.S.3210 Code for Safety procedures and practices in Electrical works.I.S.3696 Safety for Scaffolds and Ladders.INDIAN ELECTRICITY RULES 1956.<strong>BSNL</strong> EW 8 form as uploaded at www.chennai.bsnl.co.inContractorInternet Downloaded copyPage No. 38 of 38EE(E)/SDE(E)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!