Landscape and Biodiversity Management Strategy - Runnymede ...
Landscape and Biodiversity Management Strategy - Runnymede ...
Landscape and Biodiversity Management Strategy - Runnymede ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Item<br />
<strong>L<strong>and</strong>scape</strong> <strong>and</strong> <strong>Biodiversity</strong> <strong>Management</strong> <strong>Strategy</strong><br />
• Hard surfaces will be kept weed free. Regular sweeping should prevent the<br />
need for the use of chemicals but occasional spot treating of weeds by h<strong>and</strong><br />
pulling or chemical means may be required.<br />
• Snow <strong>and</strong> ice clearance to be carried out as required allowing continued safe<br />
access for users.<br />
• Inspections <strong>and</strong> minor repairs/re-pointing of hard surfaces to be carried out as<br />
required.<br />
7.11 MVEE Stream<br />
<strong>Management</strong> Aim <strong>and</strong> Objective: To reduce <strong>and</strong> control shading vegetation along the<br />
banks of the stream to bring it into favourable condition <strong>and</strong> bring about wide-ranging<br />
benefits for flora, fauna <strong>and</strong> people.<br />
• The stream will be divided into eight management sections.<br />
• All sections will be managed in Year 1 to cut either a proportion of trees or all<br />
bramble <strong>and</strong> bracken back from the stream edges.<br />
• Subsequent management in Years 2, 3 <strong>and</strong> 5 will remove further trees <strong>and</strong> keep<br />
on top of regrowth of trees, bramble <strong>and</strong> bracken.<br />
• Logs will be piled to create deadwood habitat.<br />
• All works will occur outside the bird nesting season (March to August inclusive).<br />
• <strong>Management</strong> will be informed further by monitoring in May/June.<br />
15