Alqueva Capacity Expansion Enterprise<br />
The capacity expansion project is composed of a new hydraulic circuit<br />
and a new Hydroelectric Plant, which will be equipped with two reversible<br />
generator sets. The works will enable the duplication of the current<br />
installed capacity of the Alqueva Hydroelectric Plant (from 260 MW to<br />
520 MW), making it the second largest hydric plant in Portugal.<br />
Portugal<br />
40<br />
<strong>41</strong><br />
ZAGOPE Annual Report 2011<br />
CLIENT : Empresa Hidroeléctrica do Guadiana