Alqueva Capacity Expansion Enterprise<br />

The capacity expansion project is composed of a new hydraulic circuit<br />

and a new Hydroelectric Plant, which will be equipped with two reversible<br />

generator sets. The works will enable the duplication of the current<br />

installed capacity of the Alqueva Hydroelectric Plant (from 260 MW to<br />

520 MW), making it the second largest hydric plant in Portugal.<br />

Portugal<br />

40<br />

<strong>41</strong><br />

ZAGOPE Annual Report 2011<br />

CLIENT : Empresa Hidroeléctrica do Guadiana