5. SECURITY DEPOSIT :<br />
The selected contractor shall furnish a Security Deposit amounting to 10% of the<br />
annual value of the work order within 15 days of the award of contract ,by<br />
way of Demand Draft in favour of the “North Eastern Electricity Supply Company<br />
of Odisha Ltd.”, on whose behalf the work order has been placed. The Security<br />
Deposit will be forfeited, in case the vendor fails to execute the order to the<br />
satisfaction of NESCO. The Security Deposit amount shall remain with NESCO<br />
till the end of contract plus additional three months and shall not bear any<br />
interest and shall be liable for forfeiture in case of the breach of any terms and<br />
conditions of the Contract.<br />
5.1 The Earnest money already deposited shall be refunded after receipt of Security<br />
Deposit.<br />
5.2 The contractors, to whom the work is awarded shall have to execute an<br />
indemnity bond in favour NESCO , thereby indemnifying the authorities and<br />
staff of NESCO against theft, loss of material, damages of any kind to the<br />
plant and installations, damages to buildings and appurtenances due to any<br />
mishandling/mistakes in operation and maintenance, as this will be the<br />
sole responsibility of the contractor and to be made good by the contractor at<br />
his risk and cost. The contractor is also to declare in the indemnity bond that<br />
he/his firm/his partners shall be held fully responsible for any damages due to<br />
fire caused by any mishandling, mal-operation, or improper maintenance and<br />
replacement of materials of electrical installation, air-conditioning plant and<br />
connected installations and that all such damages will be made good by him/his<br />
firm/his partners at his/their own risk and cost.<br />
5.3 All procedures either technical or security measures as followed in NESCO for<br />
all contractors shall be followed in the case of this contract also.<br />
5.4 The conditions beyond its reasonable control such as, but not limited to,<br />
war, strikes, fires, Flood, governmental restrictions or power failures, damages<br />
etc, shall not be Deemed a breach of the contract.<br />
5.5 Except where otherwise provided in the contract, all questions and disputes<br />
relating to the meaning of the specification, and instruction herein before<br />
mentioned and as to the quality of the materials, services as to any question,<br />
claim, right, matter or thing whatsoever, in any way arising out of or relating to<br />
the contract, specifications, estimates, instructions, orders or these conditions or<br />
otherwise concerning the works, or the execution of the same whether arising<br />
during the process of the work or after the completion or abandonment thereof<br />
shall be referred to arbitration in accordance with the Arbitration and Conciliation<br />
Act,1996 or any statutory modification or reenactment thereof for the time being<br />
inforce. The place of arbitration shall be Bhubaneswar. The arbitral procedure<br />
shall be conducted in English language and any award or awards shall be<br />
rendered in English. The procedural law of the arbitration shall be Indian law.<br />
The award of the arbitrator shall be final and conclusive and binding upon<br />
the parties. The cost of the arbitration shall be borne by the parties in equal<br />