12.10 Each personnel deployed by the Tenderer should be issued identity card with<br />
passport size photograph affixed on it and duly attested by the tenderer. A photo<br />
copy of such identity card to be given to Officer-in- charge of 33/11 KV sub-stations.<br />
12.11 The Tenderer should maintain in the prescribed format wage-cum-muster roll<br />
which should be available at site.<br />
12.12 The Tenderer shall be responsible to provide group accidental insurance to its<br />
employees and in case of any accident occurring to any of the employees engaged by<br />
the contractor, no compensation shall be payable by the NESCO. The contractor on<br />
demand from NESCO shall have to produce the copy of the valid insurance policy,<br />
covering the names of the employees engaged by him. The contractor shall also be<br />
responsible for the safety of his employees and in case of any safety threat from public,<br />
natural calamity or otherwise causing harm to his employees, NESCO will not be<br />
liable for any compensation to the contractor and his employees.<br />
12.13 The sub-station and its environment will be kept neat and clean. Cleaning agents<br />
such as soap, detergent, cotton waste, etc., shall be provided by the tenderer.<br />
12.14 The tenderer shall follow the provisions of the Electricity Act 2003 and the<br />
Regulations framed there under. The contractor should provide all fire fitting<br />
equipments and other safety equipments essential as per Electricity Rules and maintain<br />
the same throughout the contract period.<br />
12.15 The tenderer shall maintain record of LC issue and return in the NESCO‟s<br />
prescribed format. The detailed procedure of issuing LC shall be approved by<br />
NESCO and shall be followed strictly by the tenderer.<br />
12.16 Wherever fuse call centre is provided, the staff provided by the tenderer may also<br />
be made responsible for lodging fuse call reports and handing over to the concerned<br />
line man & recording of action taken. In such a case separate MIS on the received<br />
and disposed would require to be provided to Engineer In charge.<br />
12.17 The tenderer shall maintain printed log sheets duly approved by NESCO for<br />
recording hourly readings of voltmeter, frequency meter etc available at the substation<br />
with different equipment / panels etc.<br />
12.18 MD, NESCO has got rights for any negotiation in respect of Rates and<br />
eligibility criteria in the best interest of Company. NESCO reserves the right<br />
to cancel or reject tender(s) without assigning any reason and without being<br />
liable to refund the cost of Tender document there upon.<br />
12.19 Any other terms and conditions as per NESCO, Rules and Regulations,<br />
Tender Specification: NESCO/O&M/12, Dt.28.12.12<br />