Transmission<br />

System Improvements<br />

The Division takes initiatives to ensure that transmission projects are completed on time and<br />

within budget. These initiatives include improvement of the procurement approach and<br />

practice; improve project specifications and BQ; and ensuring accurate project scoping together<br />

with enhanced QA/QC process.<br />

The Chubadak 275 kV substation near Gombak which is part of the Central Area Reinforcement<br />

(CAR) Project was completed and commissioned in May 2007. With the CAR Project being close<br />

to its completion date of December 2007, it would further strengthen the security of supply<br />

around Kuala Lumpur and the Klang Valley.<br />

The 500 kV transmission line that connects the Jimah IPP Coal Fired Power Station to Lenggeng<br />

Substation and to Olak Lempit Substation is progressing to be completed by December 2007. A<br />

total of 30 projects were fully completed and commissioned during the year in review. Out of<br />

these projects, 13 were substation projects that contribute to additional 2,130 MVA transformer<br />

capacity in the system.<br />

Improvement are not restricted to the Central region alone. In the North, the Division has<br />

upgraded the Kinta Valley 66 kV with the 132 kV system. This is a milestone in the achievement<br />

of supply reliability in Perak, yet marking another milestone in Transmission history whereby<br />

the whole of 66 kV system is now de-commissioned in the National Grid, with the exception of<br />

only one dedicated feeder connected for a particular customer.<br />

Major rehabilitation of the Skudai substation was completed to strengthen the electricity<br />

supply in the Southern region which also caters for the development of Wilayah Pembangunan<br />

Iskandar.<br />

In the Eastern region, the re-configuration of the Tanah Merah-Kenyir 275 kV transmission line<br />

into Kandis would strengthen the electricity supply to Kelantan.<br />

The upgrading of the National Load Despatch Center (NLDC) project has progressed satisfactorily<br />

and is scheduled for completion by 2008. Through this project TNB will acquire a state-of-theart<br />

SCADA system and Energy Management System (EMS) to meet the future needs of TNB,<br />

providing the technological support for secure operation and the development of an intelligent<br />

grid system.<br />

128<br />

<strong>Tenaga</strong> <strong>Nasional</strong> <strong>Berhad</strong> Annual Report 2007