22.11.2014 Views

Download - Tenaga Nasional Berhad

Download - Tenaga Nasional Berhad

Download - Tenaga Nasional Berhad

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Nerve and Drive<br />

The electricity business had its humble beginnings as Central<br />

Electricity Board in 1949 with an initial generation capacity of<br />

40 MW and 2,466 employees serving 45,000 customers. Over<br />

the last five decades, this has grown to a formidable proportion<br />

with <strong>Tenaga</strong> <strong>Nasional</strong> <strong>Berhad</strong> (TNB) established and having<br />

today, over 11,200 MW in installed generation capacity, more<br />

than RM67 billion in assets, over 28,000 employees, and a<br />

customer base of more than seven million. Our infrastructure<br />

is a complete generation, transmission and distribution system<br />

that forms the driving nucleus powering the nation’s progress,<br />

lighting up commerce and the lives of Malaysians.<br />

Today the electrical pulse rendered by TNB is indeed felt<br />

here, there and everywhere. As the nerve and drive of<br />

human mankind’s development, TNB through its workforce,<br />

places its commitment to all touchpoints with full fervour<br />

and dedication. From the break of dawn as reflected on the<br />

front cover of our annual report, TNB remains constant in<br />

its delivery of electricity, serving 24/7 throughout Peninsular<br />

Malaysia and Sabah. And as the country rises to the challenges<br />

of tomorrow, you can be assured that we are always there to<br />

help communities thrive.<br />

<br />

<strong>Tenaga</strong> <strong>Nasional</strong> <strong>Berhad</strong> Annual Report 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!