23.11.2014 Views

English - BCSD Static Server - Bakersfield City School District

English - BCSD Static Server - Bakersfield City School District

English - BCSD Static Server - Bakersfield City School District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IV. <strong>School</strong> Facilities<br />

<strong>School</strong> Facility Conditions and Planned Improvements (<strong>School</strong> Year 2012-13)<br />

This section provides information from the most recent Facility Inspection Tool (FIT) data (or equivalent), including:<br />

• Description of the safety, cleanliness, and adequacy of the school facility<br />

• Description of any planned or recently completed facility improvements<br />

• The year and month in which the data were collected<br />

• Description of any needed maintenance to ensure good repair<br />

Year and month in which data were collected: 9/2012<br />

Compton <strong>School</strong> was built in 1960. It sits on 9.9 acres of which 4.01 acres is playground. This school has 25 classrooms, a multipurpose<br />

facility, two science labs, band room, teacher tutor room, lounge room, counseling room, wood shop, PTA room, computer<br />

room, nurse/psychologist room and a library. The campus has staff dinning and a workroom.<br />

The custodial staff adheres to a weekly cleaning schedule that includes classrooms, restrooms, cafeteria and kitchen areas.<br />

The <strong>District</strong>’s Mobile Maintenance Team visits the school site at least twice a year. Maintenance emergencies are addressed<br />

immediately. <strong>District</strong> personnel maintain the grounds at least once every two weeks.<br />

This site also is maintained to ensure a clean, safe, and functional facility as determined pursuant to a Facility Inspection Tool<br />

developed by the State of California Office of Public <strong>School</strong> Construction.<br />

For the 2011-12/2012-13 school year, the <strong>District</strong>’s governing board has approved deferred maintenance projects for this school<br />

that resulted in the completion of a protective asphalt coating.<br />

During the 2012-2013 school year, local bond funds Measure G and state matching funds will be used to modernize this site. The<br />

work on this project is scheduled to begin in 2013 and estimated to be completed prior to the start of the 2014-2015 school year.<br />

<strong>School</strong> Facility Good Repair Status (<strong>School</strong> Year 2012-13)<br />

This section provides information from the most recent Facility Inspection Tool (FIT) data (or equivalent), including:<br />

• Determination of repair status for systems listed<br />

• Description of any needed maintenance to ensure good repair<br />

• The Overall Rating (bottom row)<br />

System Inspected<br />

Systems:<br />

Gas Leaks, Mechanical/HVAC, Sewer<br />

Interior:<br />

Interior Surfaces<br />

Cleanliness:<br />

Overall Cleanliness, Pest/ Vermin Infestation<br />

Electrical:<br />

Electrical<br />

Repair Status<br />

Exemplary Good Fair Poor<br />

Repair Needed and<br />

Action Taken or Planned<br />

[ ] [X] [ ] [ ] Room 11 - HVAC leaking water into<br />

classrooms.<br />

12/5/12 - Cleaned condensation.<br />

[ ] [X] [ ] [ ]<br />

[ ] [X] [ ] [ ]<br />

[ ] [ ] [ ] [X] Rooms 10,11, 12,16,19,24 - Daisy<br />

chain power strip.<br />

12/11/12 - Corrected.<br />

Room 11 - Top electrical plug on<br />

west wall does not work.<br />

12/11/12 - Electrical plug fixed.<br />

2011-12 <strong>School</strong> Accountability Report Card for Compton Junior High <strong>School</strong> Page 4 of 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!