GRAIN STIR-ATOR - David Manufacturing Co.
GRAIN STIR-ATOR - David Manufacturing Co.
GRAIN STIR-ATOR - David Manufacturing Co.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Assembly & Installation<br />
PNEG-1156 DIII Stir-Ator<br />
Check that the trolley hold-down rods and<br />
wheels are properly positioned. There<br />
should be approximately 1/4" between the<br />
top of the hold-down rods and the bottom of<br />
the frame rails. See Photos 6H and 6I.<br />
1/4"<br />
Hold Down Rods<br />
Frame Rail<br />
Photo 6H<br />
Trolley<br />
Wheel<br />
Vice Grip<br />
Photo 6I<br />
24