GRAIN STIR-ATOR - David Manufacturing Co.
GRAIN STIR-ATOR - David Manufacturing Co.
GRAIN STIR-ATOR - David Manufacturing Co.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PNEG-1156 DIII Stir-Ator<br />
Assembly & Installation<br />
10. TROLLEY DRIVE ARM<br />
TO CABLE<br />
A. <strong>Co</strong>nnect trolley drive arm to cable connector<br />
using one 1/2" SAE flat washer and 5/32" x<br />
1" cotter pin. See Photos 10A, 10B, &<br />
10C. BE SURE CABLE CONNECTOR IS<br />
AS SHOWN IN PHOTO 10C. If assembled<br />
incorrectly, connector will not go around<br />
cable pulleys.<br />
Cable <strong>Co</strong>nnector<br />
Trolley Drive Arm<br />
BE SURE THE TROLLEY DRIVE ARM<br />
POINTS TO THE CENTER OF THE BIN!!<br />
DOUBLE CHECK THE TROLLEY UNIT ON<br />
THE MAIN FRAME HAS BEEN INSTALLED<br />
IN THE CORRECT OPERATING POSITION.<br />
Photo 10A<br />
1/2" Flat Washer<br />
5/32" x 1" <strong>Co</strong>tter Pin<br />
Photo 10B<br />
Trolley<br />
Drive<br />
Arm<br />
Cable<br />
Cable <strong>Co</strong>nnector<br />
Cable Pulleys<br />
Trolley Drive Arm<br />
Photo 10C<br />
Photo 41<br />
29