23.11.2014 Views

GRAIN STIR-ATOR - David Manufacturing Co.

GRAIN STIR-ATOR - David Manufacturing Co.

GRAIN STIR-ATOR - David Manufacturing Co.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PNEG-1156 DIII Stir-Ator<br />

Assembly & Installation<br />

10. TROLLEY DRIVE ARM<br />

TO CABLE<br />

A. <strong>Co</strong>nnect trolley drive arm to cable connector<br />

using one 1/2" SAE flat washer and 5/32" x<br />

1" cotter pin. See Photos 10A, 10B, &<br />

10C. BE SURE CABLE CONNECTOR IS<br />

AS SHOWN IN PHOTO 10C. If assembled<br />

incorrectly, connector will not go around<br />

cable pulleys.<br />

Cable <strong>Co</strong>nnector<br />

Trolley Drive Arm<br />

BE SURE THE TROLLEY DRIVE ARM<br />

POINTS TO THE CENTER OF THE BIN!!<br />

DOUBLE CHECK THE TROLLEY UNIT ON<br />

THE MAIN FRAME HAS BEEN INSTALLED<br />

IN THE CORRECT OPERATING POSITION.<br />

Photo 10A<br />

1/2" Flat Washer<br />

5/32" x 1" <strong>Co</strong>tter Pin<br />

Photo 10B<br />

Trolley<br />

Drive<br />

Arm<br />

Cable<br />

Cable <strong>Co</strong>nnector<br />

Cable Pulleys<br />

Trolley Drive Arm<br />

Photo 10C<br />

Photo 41<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!