<strong>North</strong> <strong>North</strong>allerton <strong>Development</strong> <strong>Area</strong> – Masterplan Framework & Design Guidance<br />

the northern countryside edge.<br />

The number of additional<br />

dwellings this provides for<br />

should be defined.<br />

Framework. It provides for<br />

around 85 additional units,<br />

Table 5.2: <strong>North</strong>allerton <strong>Area</strong> Forum - comments and<br />

responses<br />

Consultation Comment<br />

Masterplan Response<br />

There should be no vehicle<br />

link between Winton Road and<br />

Mowbray Road (in DPD area<br />

NM5C), only pedestrian and<br />

cycle links.<br />

Potential locations for public<br />

art.<br />

This link is now pedestrian and<br />

cycle only in the masterplan.<br />

Design guidance point B2<br />

makes recommendation<br />

regarding the siting of public<br />

art.<br />

5.18 The assessments undertaken by the consultant team, and<br />

discussed and agreed with the Steering Group, also provided a<br />

robust testing and support of the Preferred Masterplan<br />

Framework. Comments were also provided from key<br />

stakeholders on the emerging masterplan and these influenced<br />

subsequent design development.<br />

5.19 The emerging Preferred Masterplan was also tabled at a<br />

meeting of the <strong>North</strong>allerton <strong>Area</strong> Forum on 1 st February 2011.<br />

This resulted in the following comments and responses.<br />

Road issues: design speed<br />

and alignment; traffic and<br />

noise levels; access to<br />

industrial estate; landscaping.<br />

Flooding issues: concern with<br />

the potential position of the<br />

new school.<br />

EA engagement: query over<br />

whether the EA (Environment<br />

Agency) were specifically<br />

engaged by the consultants.<br />

Extensions to the LDF<br />

allocation<br />

boundary<br />

(specifically land parcel NM5c)<br />

and the additional housing<br />

proposed.<br />

A traffic model was<br />

commissioned to test the road<br />

design. Noise reduction and<br />

landscaping is addressed in<br />

masterplan amendments.<br />

Ultimately a dual solution was<br />

reached – providing a<br />

separate access to the<br />

industrial estate.<br />

It is confirmed that this location<br />

is outside of the EA flood<br />

zone.<br />

Confirmation that WYG did<br />

interview the EA and that the<br />

EA also attended workshops<br />

and meetings during the study.<br />

A further meeting was held<br />

with the EA - who confirmed<br />

that areas of flooding concern<br />

could be resolved by improved<br />

surface water drainage in the<br />

development).<br />

Confirmation that the<br />

extension represented 3.08 Ha<br />

and approximately 48<br />

dwellings, although total<br />

numbers still did not exceed<br />

the Allocations DPD total.<br />

Further Forum consultation. The masterplan was also<br />

41