<strong>North</strong> <strong>North</strong>allerton <strong>Development</strong> <strong>Area</strong> – Masterplan Framework & Design Guidance<br />
the northern countryside edge.<br />
The number of additional<br />
dwellings this provides for<br />
should be defined.<br />
Framework. It provides for<br />
around 85 additional units,<br />
Table 5.2: <strong>North</strong>allerton <strong>Area</strong> Forum - comments and<br />
responses<br />
Consultation Comment<br />
Masterplan Response<br />
There should be no vehicle<br />
link between Winton Road and<br />
Mowbray Road (in DPD area<br />
NM5C), only pedestrian and<br />
cycle links.<br />
Potential locations for public<br />
art.<br />
This link is now pedestrian and<br />
cycle only in the masterplan.<br />
Design guidance point B2<br />
makes recommendation<br />
regarding the siting of public<br />
art.<br />
5.18 The assessments undertaken by the consultant team, and<br />
discussed and agreed with the Steering Group, also provided a<br />
robust testing and support of the Preferred Masterplan<br />
Framework. Comments were also provided from key<br />
stakeholders on the emerging masterplan and these influenced<br />
subsequent design development.<br />
5.19 The emerging Preferred Masterplan was also tabled at a<br />
meeting of the <strong>North</strong>allerton <strong>Area</strong> Forum on 1 st February 2011.<br />
This resulted in the following comments and responses.<br />
Road issues: design speed<br />
and alignment; traffic and<br />
noise levels; access to<br />
industrial estate; landscaping.<br />
Flooding issues: concern with<br />
the potential position of the<br />
new school.<br />
EA engagement: query over<br />
whether the EA (Environment<br />
Agency) were specifically<br />
engaged by the consultants.<br />
Extensions to the LDF<br />
allocation<br />
boundary<br />
(specifically land parcel NM5c)<br />
and the additional housing<br />
proposed.<br />
A traffic model was<br />
commissioned to test the road<br />
design. Noise reduction and<br />
landscaping is addressed in<br />
masterplan amendments.<br />
Ultimately a dual solution was<br />
reached – providing a<br />
separate access to the<br />
industrial estate.<br />
It is confirmed that this location<br />
is outside of the EA flood<br />
zone.<br />
Confirmation that WYG did<br />
interview the EA and that the<br />
EA also attended workshops<br />
and meetings during the study.<br />
A further meeting was held<br />
with the EA - who confirmed<br />
that areas of flooding concern<br />
could be resolved by improved<br />
surface water drainage in the<br />
development).<br />
Confirmation that the<br />
extension represented 3.08 Ha<br />
and approximately 48<br />
dwellings, although total<br />
numbers still did not exceed<br />
the Allocations DPD total.<br />
Further Forum consultation. The masterplan was also<br />
41