SITE LAYOUT PRINCIPLES<br />

INDICATIVE LAND USES<br />

ESTATE INFRASTRUCTURE<br />

BUILT DESIGN<br />

The development of the area is predicated on<br />

the construction of the new link road between<br />

<strong>Mill</strong> <strong>Lane</strong> and the A1120 Tesco roundabout.<br />

To maximise views into open countryside and provide a focal<br />

point the link road will follow a straight line between the<br />

roundabout and the Clamp Farm cluster of buildings. Where<br />

the new road veers east to avoid the cluster and intercept<br />

with <strong>Mill</strong> <strong>Lane</strong>, the open view will be maintained by the<br />

creation of an open area replicating the Tye /Ling feature<br />

found in many <strong>Suffolk</strong> villages (yellow on Masterplan).<br />

The new link road and central roundabout will be designed<br />

and constructed to <strong>Suffolk</strong> County Council approval and<br />

to a specification providing adequate capacity for Phase 1<br />

and Phase 2 and local traffic diverted from <strong>Mill</strong> <strong>Lane</strong>. It is<br />

anticipated that this will dictate that elements of the road<br />

will be twin lane.<br />

Dispersal of the road network to Phase 2 in the north and<br />

the warehouse zone in the south will be via distributor<br />

roads aligned with the Overhead High Voltage Power Lines<br />

thus minimising disruption and loss of developable area to<br />

these cables and preserving open access to them.<br />

The Link road and these distributor roads will be<br />

constructed to <strong>Suffolk</strong> County Council approval and<br />

offered for adoption by the Council Highways authority.<br />

Following construction of the new link road <strong>Mill</strong> <strong>Lane</strong><br />

will be closed to through traffic and temporary access<br />

allowed for Braziers Hall and <strong>Mill</strong> lane cottages westwards<br />

to Creeting Road shared with pedestrian and cycleways<br />

utilizing the former lane.<br />

The Phase 2 Business Park will be the subject of a separate<br />

planning application but will be accessed via the northern<br />

distributor road within the Phase 1 Site as indicated white<br />

on the Masterplan<br />

The Masterplan illustrates indicative layout<br />

principles such as the location and extent of<br />

the proposed public and business land uses. A<br />

mix of predominantly B1, B2 and B8 land uses<br />

will be permitted in the following<br />

approximate proportions :<br />

Total<br />

Area in<br />

Hectares<br />

(Ha)<br />

Total<br />

Employment<br />

Area<br />

(Ha)<br />

Area<br />

of B1<br />

Offices<br />

(Ha)<br />

Area of<br />

Other<br />

Business<br />

Units<br />

(Ha)<br />

Phase 1 58 29.0 2 6 21.0<br />

Phase 2 21 10.5 2 4.5 4.0<br />

Total 79 39.5 4 10.5 25.0<br />

Other Uses including Sui Generis use and those within<br />

Use Class D commonly found on Business parks will be<br />

considered . The distribution of Uses within the Site will<br />

depend upon type of user and quality of the particular<br />

development but will be subject to additional specific<br />

guidance as below:<br />

Keys sites for landmark buildings are identified.<br />

These will mark junctions and activity nodes and aid<br />

navigation whilst simultaneously masking poorer visual<br />

aspects (eg the view of the maltings) . Such buildings<br />

might be approved from any use class but will be<br />

distinctive and memorable incorporating high quality<br />

materials and landscaping.<br />

The blue plot of circa 0.5 ha denotes a Business Park<br />

central services facility housing mixed facilities such<br />

as a Town Edge Bus Stop with ‘Real Time Passenger<br />

Information’ (RTPI), taxi rank, waiting area, small<br />

shop, small cafeteria, offices, crèche.<br />

Area of<br />

Warehouses<br />

(Ha)<br />

Two plots of circa 0.5 ha coloured Khaki denote business<br />

units designed and constructed to resemble traditional<br />

agricultural buildings<br />

The main estate/ link road (dark red), north<br />

south distributor roads (white) will be<br />

constructed in the approximate locations<br />

indicated on the Masterplan to adoption<br />

standards and incorporate the planting<br />

designs specified on the Landscape key of<br />

the Masterplan.<br />

Additional minor plot access roads will be constructed<br />

within the framework of the main estate roads, land use<br />

zones and landscaping belts also to adoptable standard and<br />

offered for adoption. The design will specify carriageway<br />

and hardened footpath up to plot boundary.<br />

A cohesive standard of paving materials, signage , lighting,<br />

planting and boundary treatments will be agreed with the<br />

Planning Authority and County Highways Authority to<br />

create a high quality public realm with a sense of identity.<br />

Street Lighting will be designed to minimise light pollution<br />

and negative impact on the adjoining countryside. Lighting<br />

of key features and Landmark Buildings will be employed<br />

to aid legibility of the area and a sense of security after sun<br />

down. This will also be designed to minimise light pollution.<br />

Within the cohesive framework of the estate<br />

infrastructure the design of individual<br />

buildings will not be subject to any common<br />

design theme but will encourage differing<br />

approaches to include the use of sustainable<br />

materials and construction methods and,<br />

for buildings over 1,000 sq m, achieve at<br />

minimum an equivalent rating to BREEAM<br />

Very Good standard.<br />

The Masterplan illustrates maximum eaves heights<br />

appropriate to the various developments plots thus<br />

ensuring that the tallest buildings are located on the valley<br />

floor alongside the existing multi storey maltings buildings<br />

all of which will be hidden from external view as the<br />

planting belts mature<br />

Lighting will be designed to minimise light pollution.<br />

Illuminated bollards will be used where possible as a means<br />

of providing subtle low-level lighting and picking out routes.<br />

A plot of circa 1 ha coloured Lime Green denotes an<br />

area reserved for ‘green’ uses which may include the<br />

construction of low impact buildings and infrastructure.<br />

02

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!