PHOSPHAX sc - Can-Am Instruments Ltd.
PHOSPHAX sc - Can-Am Instruments Ltd.
PHOSPHAX sc - Can-Am Instruments Ltd.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Installation<br />
3.3 Mechanical Installation<br />
Choose a suitable place to install the instrument. Plan the<br />
mechanical installation before positioning posts or drilling holes.<br />
Refer to Figure 2 for instrument dimensions.<br />
Ensure the fastening has sufficient load bearing capacity<br />
(approximately 160 kg). The wall plugs must be selected and<br />
approved to suit the properties of the wall.<br />
Plan cable and tubing routes to avoid sharp bends and tripping<br />
hazards.<br />
When connecting two analyzers (e. g. for measuring two<br />
parameters with a FILTRAX or Ultrafiltration), plan where the<br />
instruments are to be installed and consider the length of the<br />
heated drain tubing (2 m).<br />
10