23.12.2014 Views

PHOSPHAX sc - Can-Am Instruments Ltd.

PHOSPHAX sc - Can-Am Instruments Ltd.

PHOSPHAX sc - Can-Am Instruments Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installation<br />

3.3 Mechanical Installation<br />

Choose a suitable place to install the instrument. Plan the<br />

mechanical installation before positioning posts or drilling holes.<br />

Refer to Figure 2 for instrument dimensions.<br />

Ensure the fastening has sufficient load bearing capacity<br />

(approximately 160 kg). The wall plugs must be selected and<br />

approved to suit the properties of the wall.<br />

Plan cable and tubing routes to avoid sharp bends and tripping<br />

hazards.<br />

When connecting two analyzers (e. g. for measuring two<br />

parameters with a FILTRAX or Ultrafiltration), plan where the<br />

instruments are to be installed and consider the length of the<br />

heated drain tubing (2 m).<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!