23.12.2014 Views

download brochure - Prologis

download brochure - Prologis

download brochure - Prologis

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. SPECIFICATION<br />

LANDLORDS GENERIC FIT OUT<br />

Warehouse Frost Protection<br />

Frost protection heating to 6 deg C with floor mounted<br />

indirect action gas fired heaters.<br />

Warehouse Lighting<br />

Very high efficiency linear fluorescent warehouse lighting<br />

designed to achieve light levels of 250lux at floor level<br />

in a ‘wide aisle’ racking arrangement.<br />

Lighting will include daylight controls, dimming and<br />

movement detection at each point of entry to the<br />

racking aisles to reduce energy consumption and<br />

hours of operation.<br />

Warehouse Sprinklers<br />

Wet ‘roof protection’ sprinkler installation to<br />

BSEN 12845 and LPC rules for category 3 goods.<br />

Tanks, pumps and valve sets include provision for<br />

future connection of an in-rack sprinkler system based<br />

on a ‘wide aisle’ racking arrangement and 20m deep<br />

marshalling areas.<br />

Warehouse Fire Alarm<br />

Warehouse fire alarm system, linked to the office fire<br />

alarm, with manual ‘break glass’ contacts for escape<br />

doors, sounders and high level beam detection.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!