25.12.2014 Views

GTPP Afam VI, Port Harcourt - STEAG Energy Services GmbH

GTPP Afam VI, Port Harcourt - STEAG Energy Services GmbH

GTPP Afam VI, Port Harcourt - STEAG Energy Services GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>GTPP</strong> <strong>Afam</strong> <strong>VI</strong>, <strong>Port</strong> <strong>Harcourt</strong> - Nigeria<br />

Power Station:<br />

Contract Scope:<br />

<strong>Afam</strong> <strong>VI</strong>, 640 MW CCPP<br />

Plant Management, Expatriate Managers, Local O&M Staff, Supply Chain<br />

Management, Provision of O&M documentation<br />

Contract Date: Since June 13, 2005<br />

Owner:<br />

Location:<br />

Fuel:<br />

Gas Turbines:<br />

SPDC - Shell Petroleum Development Corporation of Nigeria,<br />

Lagos, Nigeria (30 % Shell, 55% NNPC, 10% Total, 5% Agip)<br />

<strong>Afam</strong>, <strong>Port</strong> <strong>Harcourt</strong>, Rivers State, South - East of Nigeria<br />

Natural Gas<br />

3 x Alstom GT13E2 (3 x 147.4 MW e 30.9 ºC)<br />

Steam Generator:<br />

Double pressure drum-type HRSG - Doosan<br />

Steam Turbine:<br />

Control System:<br />

1 x 230 MW, air-cooled condenser<br />

Egatrol (GT), Alspa (ST), maxDNS (HRSG+BOP)<br />

Evonik <strong>Energy</strong> <strong>Services</strong> <strong>GmbH</strong> · Rellinghauser Str. 1-11 · 45128 Essen · Germany · Fon +49 (0)201/177 03 · Fax +49 (0)201/177 1990<br />

Internet: http:/ /www.evonik.de/energyservices · E-Mail: encotec@steag.de


<strong>Afam</strong> site is located 25 km northeast of <strong>Port</strong> <strong>Harcourt</strong> in Rivers State, Nigeria.<br />

<strong>Afam</strong> <strong>VI</strong> is a 650MW Combined Cycle Power Plant consisting of 3 x gas fired Alstom<br />

13E2 gas turbine generator units with heat recovery steam generators by Doosan<br />

(Korea) and 1 x Alstom steam turbine. The plant is due to complete in 2010 and will be<br />

commission in 4 steps with the first gas turbine operational in November 2008. The EPC<br />

contractor is Daewoo Engineering and Construction.<br />

Evonik expatriate managers worked closely with the SPDC Project team, providing<br />

administrative, documentation and engineering support as well as training and asset<br />

local staff. Evonik has provided the O&M crew during the commissioning under<br />

responsibility of the EPC contracter Daewoo and ronders the 0&M services to the plant.<br />

The gas turbin heavy maintenance is provided by OEM based on a Long-term Service<br />

Agreement. All other supplies, routine GT maintenance and heavy balance of plant<br />

maintenance are within Evonik scope. This project is the largest power plant with<br />

outsourcing of O&M service and a good example to show under which scheme Nigerian<br />

engineers and technicans in Nigeria can develop their capacities and show excellent<br />

O&M performance.<br />

<strong>Afam</strong> <strong>VI</strong> is one of the first power plants in Nigeria to incorporate heat recovery<br />

technology (combined cycle power plant) and as such is seen as a flagship project.<br />

Evonik is well placed to take the plant forward to full commercial operation and will be a<br />

powerful contestant in the accelerated expansion of Nigeria‘s electricity infrastructure.<br />

Evonik <strong>Energy</strong> <strong>Services</strong> <strong>GmbH</strong> · Rellinghauser Str. 1-11 · 45128 Essen · Germany · Fon +49 (0)201/177 03 · Fax +49 (0)201/177 1990<br />

Internet: http:/ /www.evonik.de/energyservices · E-Mail: encotec@steag.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!