<strong>Plan</strong>ting events within Area 4 have been planned over several years to allow for the control of<br />
invasive weed species and the collection of adequate amounts of seed for direct seeding. The<br />
result is an extended maintenance program of six years instead of five. Primary areas for<br />
revegetation are Zones A, B, C, D and E. Secondary areas for revegetation are F, G and H,<br />
depending on funding availability.<br />
Table 25. Revegetation Works Program - <strong>Management</strong> Area 4 .<br />
Activity Zone Details Timing Cost Details Cost<br />
Year 1: Site preparation & Revegetation<br />
Site preparation<br />
Boom spray<br />
A<br />
Targeted Galenia<br />
control<br />
Jan / Feb $150 ha $1,360<br />
Pre planting weed<br />
control<br />
B,D& E<br />
Control of herbaceous<br />
weeds within planting<br />
areas; include<br />
spraying individual<br />
planting locations for<br />
species requiring<br />
treeguards.<br />
April / May 55 hrs $3,025<br />
Total area = 4.02 ha<br />
<strong>Plan</strong>t supply B,D& E Tube stock<br />
<strong>Plan</strong>ts – 7,336<br />
June $1.10 each $8,070<br />
Site preparation<br />
<strong>Plan</strong>t bowl,<br />
Treeguards, Stake<br />
(Refer individual<br />
zones for details)<br />
D& E Total = 4,396 plants Prepare bowls<br />
prior to planting.<br />
Supply and fit<br />
treeguard and<br />
stake during<br />
planting<br />
Prepare supply<br />
and fit = $3.50<br />
per plant<br />
$15,386<br />
<strong>Plan</strong>ting B,D& E Labour (planting 7,336<br />
plants)<br />
Maintenance event B,D& E Follow up weed<br />
control / slashing<br />
around plantings<br />
July/ August $1.30 each plant $9,537<br />
Sept-Oct 50 hrs $2,750<br />
Total $40,128<br />
Contingency 10% Total $44,141<br />
Year 2: Site preparation, revegetation, ongoing maintenance and weed control<br />
Site preparation<br />
Boom spray<br />
A<br />
Targeted Galenia<br />
control<br />
Jan / Feb $150 ha $1,360<br />
Maintenance event B,D& E Follow up weed<br />
control / slashing<br />
around plantings<br />
April / May 50 hrs $2,750<br />