Builders’ Digest<br />

<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong>’s Quarterly Perspective<br />

A <strong>NEW</strong> <strong>DAY</strong><br />

TCA’s <strong>Construction</strong> Day 2010<br />

A Hand Up<br />

Bid Competition<br />

Members’ Day<br />

New Model<br />

Green Centre<br />

Vol.5 No.1 Quarter 3 2010<br />

PM# 40787580


Building made easy<br />

MAPEI products now integrated into<br />

ARCAT’s BIM systems<br />

BIM: Advantages to the construction industry<br />

• Allows a consistent method for multiple architect, construction and design professional<br />

users to develop, amend and interchange drawings without having to reformat them as<br />

with individual software programs.<br />

• Provides accurate, consistent and identical information that creates a level playing field<br />

for contractors preparing bids.<br />

• Enables all information used to prepare bid packages to be embedded into BIM images<br />

and easily accessible to bidders.<br />

• Reduces subcontractor interpretation by ensuring that product specifications are based<br />

on performance requirements for each specific application within an installation.<br />

• Separates out applications so that only specific products are embedded with specific<br />

drawings for each application. For example, an interior floor method cannot be used on<br />

exterior applications.<br />

• Promotes fast and accurate review of submittals and product substitutions, reducing<br />

liability for architects.<br />

• Provides the owner with a final drawing that contains references to specific products,<br />

assemblies and guidelines.<br />

• Provides the owner with product information for repairs or expansions.<br />

Product related data embedded into BIM<br />

Technical Data Sheets<br />

Warranty information<br />

Architect prepares working<br />

documents and conceptual<br />

drawings.<br />

Engineer prepares<br />

documentation directly from<br />

architect’s BIM model.<br />

MSDS information<br />

Links to Web-based<br />

information<br />

LEED data and<br />

compliance letters<br />

Manufacturer and/<br />

or distributor contact<br />

information<br />

Product installation<br />

recommendations<br />

Customer service<br />

contact information<br />

Contractor prepares bid package<br />

based on real information –<br />

easily transported to architect.<br />

Owner/Developer receives final<br />

drawing with products and<br />

assemblies. Can manage progress<br />

and project outcome more easily.<br />

About ARCAT<br />

ARCAT provides thousands of CAD details, specifications, BIM families,<br />

Spec Wizards, links to Websites and plenty more information from more<br />

than 10,500 manufacturers to architects, spec writers, engineers and<br />

contractors. This data greatly assists professionals in making informed<br />

product selections. See www.arcat.com.


AdvertoriAl<br />

C.W. SMITH Crane ServICe 2009 LIMITed<br />

C.W. SMITH CRANE SERVICE 2009<br />

LIMITED was established in 1965 by<br />

Harold D. Smith in the same neighbourhood<br />

in <strong>Toronto</strong> where it is located<br />

today. The company was named after<br />

his father whose distinguished service<br />

in World War 1 and longtime employment<br />

to J.N. Pitts (Winnipeg) and C.A.<br />

Pitts (<strong>Toronto</strong>) linked the company to<br />

the growing construction industry in<br />

Southern Ontario. We are proud that<br />

customers from our first year are still<br />

active today.<br />

Harold had a passion for the industry<br />

and was always available to help a<br />

friend in the industry. Many of today’s<br />

crane owners and managers started<br />

their work life at Smith.<br />

Today, the company is owned by Jean<br />

(Bobi) and ably run by Jeffrey and<br />

Kevin Robertson, who are second<br />

generation to the crane industry having<br />

grown up and apprenticed at Superior<br />

Cranes back in the day when the<br />

company had cranes.<br />

Smith Cranes re-organized in 2009 and<br />

now is poised to move ahead to serve<br />

their customers who demand “a lift<br />

with excellence at a right price with<br />

safety and time factored in.” There<br />

will be changes - and all will be for the<br />

better of the industry, the employees<br />

and the many customers served and to<br />

be served in the years to come.<br />

We are pleased with the new 90<br />

ton machine in our fleet: a Grove<br />

TMS9000E. We feel that this efficient<br />

unit will serve our customers well and<br />

be an excellent addition that meets the<br />

needs of a diversity of lifts for all sectors<br />

of the user industries.


AdvertoriAl<br />

A DV E RTO R I A L<br />

Bringing Winners of the the TCA “Trade past Contractors back to Award” life<br />

The Onyx Mechanical team provides have to build the foundation for our company Onyx Mechanical’s recent projects in the<br />

mechanical construction services for the - a commitment that proves to our clients commercial sector include:<br />

Death and taxes - those we all know are ties and demonstrate the value of building times in significant leaps and some of the<br />

ICI sector of Southern Ontario and has<br />

the universal constants, but there is a<br />

that Onyx Mechanical is prepared to stand<br />

mock ups. What can look acceptable on paper<br />

out will from change the pack,” considerably says Chris. when “If you built want in With the Food fall Court fast approaching, the rush is<br />

most • significant <strong>Toronto</strong> Eaton’s changes Centre are North still to come.<br />

third over - aging. 68 years We of can’t combined escape experience the effects in<br />

of the time plumbing and neither and can HVAC the industry. buildings Partners we the to real make world. a difference Sometimes you have you really to be have willing on to enclose the building and complete<br />

construct. Chris Nielsen, They John eventually E. McKinnon fail, just and like Bryon to to “stand contribute, there” to for be the a part answer of something to come. and the • mechanical Milton Arts elements & Entertainment required Centre to<br />

us. Backus There is, have however, built a one first-rate major difference<br />

in the - we industry can rescue and those have structures Now with the major issues resolved, the<br />

reputation<br />

provide<br />

leave your mark for those who follow to see the heat Bradford finishing. Library The finish may<br />

worked with<br />

still be months away, but Lister Block will<br />

before it’s too late.<br />

pace what of you construction could achieve,” has increased state the significantly.<br />

partners. Lister “Onyx Block is changes our achievement, daily, some-our<br />

times ahead for us all.<br />

three undoubtedly<br />

industry leaders such as GovenBrown, PCL<br />

• Square still One have CRU some interesting<br />

One Constructors, such building and in Century Hamilton, Group. Ontario,<br />

pride and our future.”<br />

• Lester Block Hamilton<br />

has escaped the wrecking ball. A historical<br />

“Our building biggest in asset downtown is our Hamilton reputation,” called Chris<br />

Lister says, Block “but will it takes live to a see significant many more effort by<br />

decades everyone of use. in the company to maintain and<br />

Breathing grow that new reputation.” life into a building that’s<br />

already had two lives is a significant<br />

That reputation is due, in no small part,<br />

challenge, one that owner LIUNA and<br />

developer to the company’s The Hi-Rise mission Group willingly to exceed its<br />

accepted. clients’ expectations. Originally built Onyx in 1886, Mechanical Lister<br />

Block does burned this by to the building ground and in 1923 maintaining and<br />

was long-term rebuilt in relationships 1924. 2009 saw with the its beginning<br />

ensuring of the satisfaction latest rebuild, through with the unparalleled old<br />

clients,<br />

structure having already been stripped and<br />

communications and teamwork.<br />

key elements preserved for reuse. Installing<br />

“When modern we HVAC commit and to plumbing something, into we a work<br />

building on schedule, never designed on budget, for such and services we don’t<br />

is a considerable challenge, but Onyx<br />

‘nickel-and-dime’ everything that comes<br />

Mechanical was up to the task.<br />

up,” says Chris.<br />

Joining Greenferd <strong>Construction</strong>’s team<br />

in One October example 2009, of Onyx Mechanical’s began installing serious<br />

the commitment mechanical to infrastructure its work is the that company’s would<br />

service support the of completed LEED construction. building. As with<br />

all heritage buildings, certain architectural<br />

elements “We fully had been support kept LEED in place construction which<br />

complicated and enjoy the participating build and in forced these the types of<br />

relocation projects,” of says various Chris. services “We believe from their that we<br />

planned have a responsibility routes. Always to mindful future generations of the to<br />

historical significance of the old interior<br />

participate in and encourage environmentally<br />

wood corridor partitions, Onyx would find<br />

alternative<br />

sustainable<br />

routes<br />

projects.”<br />

for those<br />

John<br />

services.<br />

admits that the<br />

value and effectiveness required by a LEED<br />

Another<br />

project<br />

complication<br />

comes at a premium,<br />

would prove<br />

but<br />

to<br />

says<br />

be<br />

that<br />

the old structure itself. The usually simple<br />

“Onyx is there to assist the entire project<br />

task of keeping vertical elements in line from<br />

floor team to in floor finding required the finding balance a between structural fiscal element<br />

and that social was responsibility.”<br />

perfectly vertical. In modern<br />

construction, the structure provides this<br />

The company has also devoted a<br />

reference but in a building thought to be<br />

one considerable of the first concrete amount framed of time buildings and money in<br />

Canada, in the this administrative accuracy was area lacking. of its business.<br />

With state-of-the-art computers, IT servers,<br />

In fact the structure would further complicate<br />

in-house the build plotting as the floor machines, to floor specialized heights<br />

became estimating, restrictive. and Most accounting of us usually and project<br />

take management no notice of software, ceiling height, Onyx but has when solidly Onyx Mechanical Ltd. Phone: 905-866-6699<br />

installing invested mechanical in the office elements, infrastructure. maintaining<br />

that height is critical. The reduced ceiling 214 Wilkinson Road Fax: 905-866-6690<br />

heights “There found are companies in the Lister many Block times building our size Brampton ON L6T 4M4 Website: www.onyxmech.com<br />

would that have challenge not invested the entire a fraction team’s of abili- what we


Page 9<br />

contents<br />

FEATURES<br />

6 The Way Forward<br />

New board chair Glenn Ackerley believes that the TCA’s strengths will be essential<br />

in responding to new challenges<br />

By Andrew Brooks<br />

9 A New Day<br />

TCA partnered with Junior Achievement for <strong>Construction</strong> Day 2010 – a new way<br />

to bring the good word about the industry to tomorrow’s leaders<br />

By Liz Katynski<br />

13 Hands-On Habitat<br />

How the TCA and Habitat for Humanity <strong>Toronto</strong> teamed up to make home<br />

ownership a reality for more city residents<br />

By Roma Ihnatowycz<br />

16 Future Positive<br />

The TCIC Bid Competition is a taste of real-life competition for soon-to-be<br />

construction professionals<br />

By Andrew Brooks<br />

20 Deeper into the Future<br />

TCA Members’ Day is always a major event: this year, attendees were given a thoughtful look at future<br />

opportunities<br />

By Andrew Brooks<br />

26 Green Smarts<br />

OSCAR promises much-needed support and information on sustainable building products and practices<br />

By Roma Ihnatowycz<br />

29 A New Kind of Model<br />

BIM nips project problems in the bud, supports LEED, and is even changing the legal landscape<br />

By Kelly Parker<br />

36 View from the Top<br />

A willingness to face new challenges has brought Chris Gower a long way in a short time<br />

By Kelly Parker<br />

38 Industry Think-Tank<br />

A new committee geared to SMEs helps TCA members learn and share business best practices<br />

By Roma Ihnatowycz<br />

Page 20<br />

Page 29<br />

DEPARTMENTS<br />

34 Advertisers Index<br />

41 Upcoming Events<br />

Builders' Digest Quarter 3 2010 | 5


Chairman’s Message<br />

The Way<br />

Forward<br />

New board chair Glenn Ackerley<br />

believes that the TCA’s strengths<br />

will be essential in crafting new<br />

responses to new challenges<br />

Glenn Ackerley, Chair<br />

Weirfoulds Llp<br />

By Andrew Brooks<br />

FOR GLENN ACKERLEY, A CONSTRUCTION LAWYER WITH WEIRFOULDS LLP AND<br />

the new chair of the TCA board of directors, challenges<br />

come with the territory, and they can be opportunities<br />

too. That kind of mixed bag is an accurate reflection of<br />

the state of the industry in 2010 as he sees it.<br />

As the first lawyer to be named to the position, Ackerley<br />

sees divergent viewpoints as one of the most important<br />

advantages the TCA has in working to advance the industry. “I’ve always felt that one of<br />

the TCA’s biggest strengths is its character as a mixed-trade association,” he says. “Anyone<br />

in the ICI sector can be a member, whether you’re a lawyer, architect, accountant, a<br />

mechanical contractor, an electrical contractor, a supplier... the list is huge.”<br />

That diversity also poses a challenge. “The association has to offer value to all the<br />

different types of members,” Ackerley says. “We have to focus on being relevant to all of<br />

the members in those various disciplines.”<br />

One way to remain relevant, Ackerley believes, is to focus on education — both in<br />

the usual, institutional sense, and in terms of the ongoing learning that should take<br />

place throughout a career. Remaining adaptable is an essential survival skill, especially<br />

in uncertain times.<br />

“BIM [building information modelling] is one example,” Ackerley says. “We already<br />

have a program to educate members about what BIM can do and how to get the most<br />

from the technology. And I think firms that don’t take the time to learn about technology<br />

tools like BIM now will be left behind over the long run.”<br />

BIM has benefits beyond its obvious advantages in articulating the stages and processes<br />

that go into project scoping. “Everyone has to work together, because the technology<br />

draws in all the different roles and shows how they interact,” Ackerley says. “It shortcircuits<br />

a lot of the potential conflict that can arise.” By clearly delineating the roles<br />

played by different disciplines, BIM helps to ensure that any ‘conflict’ that does arise<br />

will be over specific problems and challenges that would have had to be addressed in<br />

any case.<br />

In another way, education touches on the future health of the industry itself. The<br />

industry is aging, and the need for fresh, young talent to fill the ranks is only going to<br />

get more acute as the years go by. “There’s a real shortage of skilled trades and skilled<br />

management,” Ackerley says. “So we as an industry have to strive to attract people, to<br />

show them the kinds of opportunities they can have in this field.”<br />

Builders’<br />

Digest<br />

<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong>’s Quarterly Perspective<br />

<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong>’s Quarterly Perspective<br />

TCA Builders’ Digest is published for the<br />

<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong><br />

70 Leek Crescent, Richmond Hill, ON L4B 1H1<br />

Tel: (416) 499-4000 • Fax: (416) 499-8752<br />

www.tcaconnect.com<br />

Publisher<br />

Editor<br />

Associate Editor<br />

Sales Manager<br />

Sales Executives<br />

Contributing Writers<br />

Production Team Leader<br />

Published by:<br />

5255 Yonge Street, Suite 1000<br />

<strong>Toronto</strong>, Ontario M2N 6P4<br />

Toll Free: (866) 216-0860 ext. 229<br />

robertt@mediaedge.ca<br />

531 Marion Street<br />

Winnipeg, MB R2J 0J9<br />

Toll Free: (866) 201-3096<br />

Fax: (204) 480-4420<br />

www.mediaedgepublishing.com<br />

President<br />

Senior Vice-President<br />

Branch Manager<br />

Since 1867<br />

<strong>Toronto</strong><br />

<strong>Construction</strong><br />

<strong>Association</strong><br />

Kevin Brown<br />

Robert Thompson<br />

Jeanne Fronda<br />

Andrew Brooks<br />

Joe Strazzullo<br />

Nolan Ackman<br />

Marlene Moshenko<br />

Carol Simpson<br />

Jim Signatovich<br />

John Pashko<br />

Andrew Brooks<br />

Kelly Parker<br />

Roma Ihnatowycz<br />

Liz Katynski<br />

Adrienne N. Wilson<br />

Robert Thompson<br />

Nancie Privé<br />

All rights reserved. The contents of this publication may not be<br />

reproduced by any means, in whole or in part, without the prior<br />

written consent of the association. Published November 2010.<br />

Publication Mail Agreement #40787580<br />

Return undeliverable copies to:<br />

<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong><br />

70 Leek Crescent, Richmond Hill, ON L4B 1H1<br />

Phone: (416) 499-4000 • Fax: (416) 499-8752<br />

6 | Builders' Digest Quarter 3 2010


YOUR<br />

ONTARIO<br />

CONSTRUCTION<br />

SECRETARIAT<br />

We Gather and Distribute<br />

<strong>Construction</strong> Related Data<br />

We Improve Labour and<br />

Management Relations<br />

We Promote the Organized<br />

<strong>Construction</strong> Industry<br />

Serving the Organized ICI <strong>Construction</strong> Sector<br />

in Ontario Since 1993<br />

Ontario <strong>Construction</strong> Secretariat (OCS)<br />

940 The East Mall, Suite 120, Etobicoke, ON, Canada M9B 6J7<br />

T 416.620.5210 F 416.620.5310 Toll Free 1.888.878.8868<br />

www.iciconstruction.com<br />

DESIGN: RYAN ISOJIMA 2010<br />

PHOTOS: RON DE VRIES


Chairman’s Message<br />

Initiatives such as the TCA’s <strong>Construction</strong><br />

Day partnership with Junior<br />

Achievement present construction as a<br />

promising career choice to high school<br />

students long before they have to make<br />

their decision. If they’re won over, then<br />

it’s up to the higher education system to<br />

make sure that they can follow through. In<br />

that context, the development of first-class<br />

higher-education programs in construction,<br />

such as the School of <strong>Construction</strong><br />

Management and Trades at George<br />

Brown College, is one of the reasons<br />

Ackerley is optimistic about the future.<br />

STEPPING UP<br />

Public-sector initiatives have loomed large<br />

in the last couple of years with the introduction<br />

of public-sector infrastructure<br />

spending as a form of economic stimulus.<br />

Investment in areas like transit has a<br />

long-term benefit, Ackerley believes,<br />

because the infrastructure is large-scale<br />

and takes time to build. However, along<br />

with a growing number of construction<br />

industry observers, he is keeping an eye<br />

on the private sector, which will inevitably<br />

be expected to play a greater role as<br />

public-sector funding for infrastructure<br />

projects is stepped back.<br />

“I’d say the spirit in the industry is one<br />

of cautious optimism,” Ackerley says.<br />

“Overall the industry has come through<br />

the recession better than some others, but<br />

if new opportunities don’t materialize, or<br />

if we do hit a second dip as some people<br />

are saying, there could be problems.”<br />

Private-sector building, notably<br />

office-tower construction, has always made<br />

up a large proportion of construction<br />

work in <strong>Toronto</strong>. There’s a longer-term<br />

payoff here too, Ackerley believes. After<br />

a building is constructed, there’s a lot of<br />

ongoing work to be had not just in building<br />

operations and management, but also<br />

in work like interior design, renovation<br />

and equipping suites in advance of new<br />

tenants. Ackerley has legal clients in this<br />

kind of work, so he understands the<br />

benefits to be had.<br />

“I don’t know if those who are warning<br />

about a double-dip recession are right,” he<br />

says. “But whether or not it turns out to be<br />

true, as long as there’s some uncertainty<br />

the people in the private sector with money<br />

to invest will tend to hold off, and they’re<br />

the ones we need in the long term.” |BD<br />

8 | Builders' Digest Quarter 3 2010


Cover Story<br />

A <strong>NEW</strong> <strong>DAY</strong><br />

TCA partnered with Junior Achievement for <strong>Construction</strong> Day 2010 –<br />

a new way to bring the good word about the industry to tomorrow’s leaders<br />

By Liz Katynski<br />

THE POPULATION IS AGING, AND THE CONSTRUCTION<br />

industry ages with it. Despite the excellent<br />

career opportunities the field can offer,<br />

more can be done to let young people<br />

know about the benefits — personal and<br />

financial — that a career in construction<br />

can bring. This simple statement of fact<br />

lies at the heart of the TCA’s ongoing<br />

strategy to develop education and outreach<br />

programs that build the profile of<br />

construction among the general public,<br />

among young people entering the<br />

workforce — and more importantly, long<br />

before they enter the workforce.<br />

Encouraging signs already abound that<br />

people who opt for a career in construction<br />

will have all the resources they need<br />

to make that dream a reality, perhaps<br />

most notably the continuing development<br />

of first-class higher education<br />

programs such as the construction school<br />

at <strong>Toronto</strong>’s George Brown College.<br />

But practical steps must be taken now<br />

to persuade young hearts and minds<br />

that construction has something to offer<br />

them, and that their talents and energies<br />

will be in real demand by the time they<br />

enter the workforce. One new and promising<br />

response to that challenge was the<br />

recent partnership between the TCA and<br />

Junior Achievement of Central Ontario<br />

(JACO) to deliver a new program called<br />

“<strong>Construction</strong> Day” to Grade 8 students<br />

in Central Ontario schools.<br />

The first-ever <strong>Construction</strong> Day was<br />

held on April 14 with over 100 TCA<br />

volunteers visiting 50 classrooms to<br />

share their enthusiasm for careers in<br />

Katherine Lee of Bilfinger Berger Project Investments and Adriana Mema, Adriatica Safety Consulting, TCA<br />

volunteers at Windfields Junior High School, North York<br />

the construction industry. It was such a<br />

success that there are plans to make it<br />

an annual event. Junior Achievement’s<br />

“Economics for Success” program was<br />

a good fit with the TCA’s message that<br />

the construction industry has something<br />

to offer individuals of a wide range of<br />

interests and talents — and with the information<br />

that TCA delivered about the steps<br />

required to launch a construction career.<br />

“It starts with the message that students<br />

have to stay in school if they want to have<br />

Builders' Digest Quarter 3 2010 | 9


Cover Story<br />

(l to r) John Paterson of Technical Project Solutions, Maureen O’Leary, Junior Achievement and Natalie Wood, Grade 8 teacher, Harry Bowes School, Stouffville<br />

the broadest range of career options,”<br />

says TCA president John Mollenhauer.<br />

“In that sense, we’re not even there to get<br />

them to opt for construction, necessarily:<br />

we just want the kids to know that there<br />

are terrific opportunities ahead, and that<br />

they can take the first steps today, here<br />

and now.”<br />

Blending financial and career education<br />

was a good fit for both JACO and<br />

TCA, says Jennifer James, program<br />

manager, Junior Achievement of Central<br />

Ontario. “We teach financial literacy and<br />

life skills and they provide the career<br />

options. It’s all about how to achieve<br />

success in their lifetime. At <strong>Construction</strong><br />

Day, students learned about options they<br />

didn’t know about — they tend to know<br />

about only traditional jobs.”<br />

This was also the first time that JACO<br />

worked with an industry-specific organization<br />

to hold a day of training. “Most of our<br />

projects are financial-literacy-based so we<br />

often team up with economic partners,”<br />

James says. “This was a unique experience,<br />

and it could open the door to other<br />

opportunities.”<br />

JACO’s “Economics for Success” program<br />

serves as a reality check for young<br />

students by introducing them to the<br />

basics of lifetime financial planning,<br />

and to the notion that how they manage<br />

“ ”<br />

This was a unique experience, and it could open<br />

the door to other opportunities<br />

— Jennifer James, program manager, Junior Achievement of Central Ontario<br />

their activities has a direct impact on the<br />

kind of lifestyle they will be able to enjoy<br />

once they start working. “That reality<br />

check meshes very nicely with what we<br />

want to tell the kids about the breadth<br />

of our industry — about the fact that<br />

construction has a place for both creative<br />

and analytical minds,” Mollenhauer says.<br />

But the best advertisement for construction<br />

was probably the quality of the<br />

volunteers who came into the classrooms,<br />

and they did a great job, says Erin Cimino,<br />

manager of special projects, TCA. Cimino<br />

notes that one volunteer who is fluent in<br />

Spanish took it upon herself to translate<br />

for a student from Mexico to help<br />

him follow the discussions. “That’s the<br />

nature of the construction business,”<br />

she says. “People are very grounded and<br />

straightforward.”<br />

Going into the classroom is a great<br />

experience for volunteers of all ages,<br />

from recent university grads who may<br />

10 | Builders' Digest Quarter 3 2010


Cover Story<br />

feel they don’t yet have much to offer, to<br />

employees and entrepreneurs of every<br />

level working in the construction industry.<br />

In that sense <strong>Construction</strong> Day can be<br />

enriching for TCA members of all kinds.<br />

At least that’s the view of Blair Davies, vice<br />

president and general manager of Engineered<br />

Assemblies — and a <strong>Construction</strong><br />

Day volunteer. “This experience makes<br />

you realize how much you do know and<br />

how far you’ve come,” he says. “It’s a real<br />

benchmark of where you’re at.”<br />

Career enthusiasm is infectious — and<br />

of course it’s the ideal attribute for a<br />

volunteer who will be talking to people<br />

outside the industry. “I love to see<br />

the results of my work,” Davies says.<br />

“I drive by buildings I did every day.<br />

From condos to hospital projects, I<br />

never know what might be around the<br />

corner. Creating buildings is solving real<br />

problems, improving our landscape, and<br />

I love doing that.” He encourages all<br />

TCA members who took part this year<br />

to bring a friend next year and make<br />

“<br />

This experience makes you realize how much you<br />

do know and how far you’ve come. It’s a real benchmark<br />

of where you’re at<br />

the day bigger and better than ever.<br />

In order to prepare for <strong>Construction</strong><br />

Day, volunteers completed two hours’<br />

training and then spent a school day<br />

alone or with a partner in the classroom<br />

with Grade 8 students. They delivered<br />

JA’s “Economics of Success” program in<br />

their own ways, and promoted career<br />

options in the construction industry<br />

at the same time. As it was signing up<br />

volunteers for <strong>Construction</strong> Day, the TCA<br />

also recruited speakers for its speakers’<br />

bureau. The association is always on the<br />

lookout for industry professionals who<br />

are willing to give their time to spread<br />

the word about the career potential in<br />

”<br />

this industry, Cimino says. Those who are<br />

willing to donate their time and energy to<br />

promote construction careers are a logical<br />

choice to speak about construction to<br />

other audiences. And <strong>Construction</strong> Day<br />

is an opportunity to refine speaking and<br />

presentation skills.<br />

Cimino notes that although speaking<br />

to a Grade 8 classroom for a full day<br />

isn’t an easy task, the TCA volunteers<br />

exceeded expectations. “Feedback<br />

from the school boards and volunteers<br />

confirms that the day was a huge success,”<br />

Cimino says. “We were pleased<br />

with student and teacher feedback<br />

and volunteers were delighted by the<br />

— Blair Davies, vice president , Engineered Assemblies<br />

Reduce paper by 85% on your next<br />

project with Bluebeam PDF Revu<br />

Built for the design and construction<br />

industry, Bluebeam PDF Revu is a<br />

powerful PDF creation, markup and<br />

editing solution for digital project<br />

communication and collaboration.<br />

Whether you are working from the<br />

office or at the jobsite on a tablet PC,<br />

Bluebeam includes all the features you<br />

need to take your project paperless.<br />

Achieve amazing time and cost savings<br />

by creating submittals, answering RFIs,<br />

taking measurements and completing<br />

punchlists digitally in PDF.<br />

Start saving at<br />

bluebeam.com/results<br />

Or visit us at<br />

Construct Canada booth #1032<br />

85% reduction<br />

in paper usage<br />

65% increase<br />

in productivity<br />

© 2010 Bluebeam Software, Inc.<br />

Builders' Digest Quarter 3 2010 | 11


Cover Story<br />

TCA volunteer Richard Brightling from Albion Architectural<br />

experience. The JA curriculum teaches<br />

students to be financially responsible and<br />

how to plan for their career and life goals<br />

– and we complement that program.”<br />

TEAMING UP<br />

JACO and the TCA first came together last<br />

year to discuss the possibility of this kind<br />

of program. As the volunteers taught the<br />

course, it was expected that they would<br />

naturally highlight career opportunities<br />

in construction, says Cimino. “Our association’s<br />

mission was to highlight the<br />

professional job opportunities in construction,<br />

and generate greater awareness of<br />

them. As we know, opportunities in the construction<br />

industry are often overlooked.”<br />

The construction industry employs<br />

over 1.2 million people in Canada in a<br />

variety of careers. In terms of growth,<br />

the industry is outpacing the economy,<br />

which should make it a natural area of<br />

interest for anyone who wants a financially<br />

rewarding career.<br />

To drive that message home, TCA<br />

volunteers had the help of a slick new<br />

TCA promotional video called “Careers in<br />

<strong>Construction</strong>.” The concise, contemporary<br />

presentation covers the full scope of<br />

career options in construction for men<br />

12 | Builders' Digest Quarter 3 2010<br />

and women with a wide range of interests<br />

and talents. The video shows people in<br />

construction talking about what they do,<br />

the training they have and what they like<br />

most about their work.<br />

The speakers in the video relate their<br />

jobs to school subjects and areas of interest<br />

that kids can relate to, enabling them<br />

to see themselves in the same roles in the<br />

future. But instead of becoming overly<br />

specialized in its treatment of the industry,<br />

the video focuses on the broad vision that<br />

goes into putting together the right team<br />

to get a construction project completed.<br />

The unique blending of creative and<br />

analytical talents that construction offers<br />

is underlined by examining the roles<br />

architects and interior designers play<br />

alongside engineers, contractors, skilled<br />

tradespeople, skilled labourers and<br />

others.<br />

The video also points out the opportunities<br />

for entrepreneurs, and adds a<br />

reminder that a successful career is not<br />

all about gain to oneself. It’s important to<br />

give back to the community too.<br />

REALITY CHECK<br />

“Economics for Success” challenges students<br />

to think in realistic, practical terms,<br />

and to relate the achievement of lifetime<br />

goals to decisions that they will have to<br />

make soon — and are even making right<br />

now. Above all, the main message is that<br />

staying in school is the most important<br />

thing they can do if they want the broadest<br />

range of options later. The program<br />

has a practical way of emphasizing that<br />

point, says JACO’s Jennifer James.<br />

“Kids start with a budget including<br />

their necessities and luxuries,” she says.<br />

“Of course they want nice cars, vacations,<br />

fancy clothing and the latest technology.<br />

Then we give them a mock job at minimum<br />

wage, and 99 per cent say they can’t<br />

support themselves. We talk about debt,<br />

but it’s not an option in the program —<br />

they have to cover their expenses with<br />

their income. This is a reality lesson for<br />

most of them.”<br />

Having volunteers on hand who could<br />

talk about their own careers in construction<br />

was a perfect fit. “We encourage<br />

volunteers to add their life experience,”<br />

James says. ”That’s what really resonates<br />

with students — real stories. For the most<br />

part, these kids have not had part-time<br />

jobs. They don’t realize that an hourly<br />

wage is not the same as net earnings and<br />

how their expenses will add up. It makes<br />

them appreciate home — at least for a<br />

little while!”<br />

The students were eager to learn<br />

about construction, and they had a lot of<br />

interesting questions that got volunteers<br />

thinking. For example, one asked ‘are<br />

you rich’ “So we had to consider for a<br />

moment what wealth means and how you<br />

measure that,” Davies says.<br />

“We had a chance to help kids to follow<br />

their dreams and get an education,” he<br />

adds. “We also shared how the construction<br />

industry is a cool place to be. I’m sure<br />

we touched a few minds and hearts at a<br />

perfect time for kids to get going towards<br />

their careers.”<br />

His last word on <strong>Construction</strong> Day<br />

“Boy, it was fun!” |BD


HOUSING<br />

The June 8 groundbreaking ceremony for the townhome complex on Kingston Road<br />

Hands-On Habitat<br />

TCA and Habitat <strong>Toronto</strong> team up to make home<br />

By ROMA IHNATOWYCZ<br />

ownership a reality for more city residents<br />

IT’S BEEN 22 YEARS SINCE HABITAT FOR HUMANITY SET UP<br />

shop in <strong>Toronto</strong>, building housing for<br />

needy families across the city. Now, thanks<br />

to a new partnership with the <strong>Toronto</strong><br />

<strong>Construction</strong> <strong>Association</strong> (TCA), things<br />

have been turned up a notch. With this<br />

new alliance, Habitat <strong>Toronto</strong> expects<br />

to dramatically increase the number<br />

of houses it constructs in the Greater<br />

<strong>Toronto</strong> Area (GTA), making home<br />

ownership a reality for far more lowincome<br />

families as a result.<br />

“In <strong>Toronto</strong> we’re now building about<br />

50 houses a year, and with the TCA’s<br />

help we expect to build 100 a year,” says<br />

Neil Hetherington, CEO of Habitat for<br />

Humanity <strong>Toronto</strong>. “We’re going to make<br />

that leap. There is a real need out there<br />

for hard-working families to have safe,<br />

decent, affordable homes.”<br />

While Habitat for Humanity regularly<br />

partners with various organizations — not<br />

to mention the individual families it<br />

helps — the collaboration with the TCA<br />

is unique. It involves TCA members<br />

donating products and services toward<br />

the construction of the homes, beginning<br />

with a 29-townhome complex in<br />

Scarborough. The association’s Young<br />

<strong>Construction</strong> Executive Club (YCEC) has<br />

already committed to a goal of $500,000<br />

worth of gifts-in-kind to the residential<br />

construction project, which was in the<br />

excavation phase at press time.<br />

“The difference with this partnership is<br />

that the TCA is really working to engage<br />

its members not only to donate money,<br />

but to donate the products they manufacture<br />

and the services they deliver,” says<br />

Hetherington.<br />

WIN-WIN PARTNERSHIP<br />

The TCA’s president John Mollenhauer<br />

is equally pleased with the arrangement,<br />

and the opportunity it provides to TCA<br />

members to help those in need of<br />

decent housing. “We like that Habitat<br />

for Humanity creates opportunities<br />

for families to help themselves,” says<br />

Mollenhauer. “That is our kind of charity.<br />

It’s not just about handing out money, but<br />

helping families with home ownership.”<br />

Unlike many other charities, Habitat<br />

for Humanity works on a model that<br />

allows individuals and families to help<br />

themselves by enlisting them to donate<br />

500 volunteer hours in the construction<br />

of their new home. Habitat also extends<br />

interest-free loans for the properties,<br />

which means that homeowners can pay<br />

them off without the heavy burden of<br />

fluctuating interest rates or demanding<br />

qualification requirements.<br />

A number of TCA members have<br />

already stepped up to the plate with<br />

support, including PCL, EllisDon, and<br />

Dufferin Concrete, which will be providing<br />

all the concrete for the project.<br />

Mollenhauer stresses that the beauty of<br />

the arrangement between the two organizations<br />

lies in the fact that smaller TCA<br />

business members can make meaningful<br />

contributions through their goods or<br />

services, without having to pony up large<br />

sums of money not necessarily readily<br />

available to them.<br />

“It struck us when we first started<br />

talking to Habitat that there was a more<br />

meaningful way that we could help<br />

than just delivering cash contributions,”<br />

explains Mollenhauer. “Instead of our<br />

members putting up money so that<br />

Habitat will have the wherewithal to<br />

build the project, we are looking to help<br />

Builders' Digest Quarter 3 2010 | 13


HOUSING<br />

At a Glance:<br />

the 4572 Kingston<br />

Road project<br />

• 29 townhomes<br />

• GreenHouse certified<br />

• Architects and landscape<br />

consultants: HOK<br />

• Total lot area: 4,235 square metres<br />

• Gross floor area: 3,240 square<br />

metres<br />

• Parking spaces: 34 cars<br />

• Mix of two- and three-storey<br />

townhouses in four blocks<br />

• Two- to five-bedroom units<br />

• Civil engineer: The Municipal<br />

Infrastructure Group<br />

• Forced air gas heat<br />

them build homes for considerably less<br />

by encouraging our members to supply<br />

material and, in some cases, labour that<br />

Habitat would otherwise have to pay for.”<br />

These materials include just about<br />

everything required in the construction<br />

of a new home, from drywall to light<br />

fixtures, and all the way to doorknobs.<br />

The Scarborough project, which happens<br />

to be the second-largest Habitat<br />

housing development in the history of<br />

<strong>Toronto</strong>, is currently on the lookout for<br />

lumber, windows and asphalt shingles.<br />

But what is important to note, says<br />

Hetherington, is that the timeline for<br />

making donations is not critical, and<br />

they can be made at any point during the<br />

construction process. In fact, the not-forprofit<br />

group is opening a new warehouse<br />

in the city for storing all supplies.<br />

So far the response from TCA members<br />

has been strong, and they’ve been “thrilled<br />

to get involved,” notes Mollenhauer.<br />

“ ”<br />

In <strong>Toronto</strong> we’re now building about 50 houses a year,<br />

and with the TCA’s help we expect to build 100 a year<br />

Their contributions, combined with<br />

other partnerships Habitat for Humanity<br />

is involved in, are expected to dramatically<br />

drive down the construction costs<br />

for the Scarborough housing complex:<br />

from the $110 to $125 per square foot<br />

range to about $65 per square foot. “This<br />

means that we can develop an affordable<br />

home, and with any additional money<br />

we receive we can buy land and building<br />

materials for more homes,” says Habitat’s<br />

Hetherington.<br />

CUTTING-EDGE CONSTRUCTION<br />

The groundbreaking ceremony for the<br />

Scarborough development, which was<br />

designed by HOK, one of the country’s<br />

premier architectural firms, took place<br />

June 8, and construction is expected to<br />

be completed in December 2011, right in<br />

time for the holidays. “A special dedication<br />

service will be held the Sunday before<br />

Christmas, and some families will be able<br />

to move in and start the New Year in their<br />

new homes,” says Hetherington.<br />

The housing development will be<br />

GreenHouse-certified, and its location<br />

at Kingston Road and Morningside<br />

Avenue is smack in the middle of<br />

a neighbourhood undergoing some<br />

notable improvements. “It is in a wonderful<br />

community where there is this<br />

incredible revitalization taking place,”<br />

says Hetherington. “What you are seeing<br />

is a community really thriving with new<br />

shops, the Morningside Mall that just got<br />

— Neil Hetherington, CEO, Habitat for Humanity <strong>Toronto</strong><br />

revamped [and] great schools; and we are<br />

part of the community being built.”<br />

The planning and high-level management<br />

of the project will be led by a<br />

steering committee made up of Wayne<br />

Dempsey, vice president of construction<br />

at Habitat for Humanity; Matt Stainton of<br />

PCL; Mike Kern of Vanbots; and Joe Perry<br />

of EllisDon. Day-to-day management of<br />

donations is being handled by TCA staffers<br />

Erin Cimino, manager, special projects;<br />

and Evelyn Kilcullen, executive assistant.<br />

While many may see Habitat for<br />

Humanity as an organization that builds<br />

houses, the reality is that by making home<br />

ownership possible, it does much more<br />

than that. It helps people build, or in<br />

some cases rebuild, their lives, a point not<br />

lost on the TCA’s John Mollenhauer when<br />

he first signed on for the partnership. It is<br />

this ability to make a significant difference<br />

in people’s lives and the future lives<br />

of their children that really makes the<br />

project worthwhile for everyone involved.<br />

“The statistics are extraordinary,” notes<br />

Mollenhauer. “These families all have<br />

kids, and a number of them have gone<br />

on to colleges and universities and so on.<br />

So it has paid enormous dividends. It has<br />

changed the lives of these families.”<br />

For TCA members interested in<br />

making a donation, or learning more<br />

about the Habitat for Humanity Kingston<br />

Road Project, please contact Erin<br />

Cimino at erincimino@tcaconnect.com,<br />

416-499-4000 ext. 149. |BD<br />

• Fire Sprinkler Systems<br />

• Fire Pumps<br />

• Fire Hose Systems<br />

• Residential Sprinkler Systems<br />

• CO2, FM 200, and Water Mist Suppression System<br />

• Fire Alarm and Security Systems<br />

• Design and Consulting<br />

• Systems Maintenance and Testing<br />

FOR ALL YOUR<br />

FIRE PROTECTION REQUIREMENTS<br />

24 HOUR SERVICE<br />

Phone: 905.564.7060<br />

Fax: 905.564.7070<br />

www.vipond.ca<br />

6380 Vipond Drive<br />

Mississauga, ON<br />

14 | Builders' Digest Quarter 3 2010


Funny. This bell<br />

sounds a lot<br />

like the one in<br />

Schindler elevators.<br />

It says we’re at your service. For new elevators and<br />

escalators, upgrades, emergency repairs, scheduled maintenance.<br />

Ring us – what can we do for you today<br />

Performance on every level.<br />

Schindler Elevator Corporation<br />

40 Cowdray Court<br />

Scarborough, ON M1S 1A1<br />

Phone: 416-332-8280<br />

Fax: 416-332-8276<br />

www.ca.schindler.com


BID Competition<br />

Future<br />

The<br />

Positive<br />

TCIC Bid Competition is an<br />

instructive, energizing taste of<br />

real-life conditions for soon-to-be<br />

construction professionals<br />

By Andrew Brooks<br />

THE BEST LEARNING ENVIRONMENT IS ONE THAT IS AS CLOSE<br />

as possible to real life. That’s the philosophy<br />

behind the <strong>Construction</strong> Institute<br />

of Canada (TCIC) Bid Competition, an<br />

event that invites teams of construction<br />

students to assemble and submit a bid<br />

on a construction project in real-life<br />

conditions. The TCIC hosts the event,<br />

and construction companies also play<br />

an active role, contributing prize money<br />

– and contributing experienced industry<br />

veterans to mentor the student teams<br />

16 | Builders' Digest Quarter 3 2010<br />

through the process. After a successful<br />

inaugural run in 2009, the competition<br />

was held again this year, and the future<br />

looks very bright.<br />

“The idea is to have students submit<br />

complete bids based on a set of contract<br />

documents,” says Roxanne Drisdelle,<br />

TCIC Professional Development<br />

Coordinator. The bids have to contain<br />

quantity take-offs for own-forces work, a<br />

sub-trade analysis and selection, as well as<br />

an overhead and pricing summary. The<br />

bids are judged to three criteria: most<br />

outstanding professional conduct; most<br />

accurate and complete bid package; and<br />

coming closest to the targeted price.<br />

The bids are based on actual projects.<br />

This year the assigned project was over<br />

$2 million in upgrades to Camp Oochigeas,<br />

a resort for children with cancer<br />

in Muskoka, Ontario. Project drawings<br />

were donated by Duncan Ross Architect<br />

of Huntsville, Ontario. The assignment<br />

went out at the end of January, and


BID Competition<br />

First place, Most Accurate and Complete Bid: Apex Contracting Inc. (David Petrozza,<br />

Joseph Lisi, Mark Farano, Anthony Zambri) Apex also won third place in the Most<br />

Professional Bid category<br />

Second place, Most Accurate and Complete Bid: DJEC <strong>Construction</strong> Manager<br />

(David Champion, Jeff Jackson, Eric Rautanen, Cameron Hester)<br />

teams had two months to assemble bids<br />

before the submission deadline, which<br />

was handled exactly the way a real one<br />

would be, with a precise deadline down<br />

to the hour, minute and second, and a<br />

site – the TCIC head office in Richmond<br />

Hill – where teams had to present their<br />

completed packages. “It’s just like a<br />

real-life bid submission,” Drisdelle says.<br />

The competition was launched on<br />

February 26 and the bids were due to<br />

be handed in by 3 p.m. sharp on April 6<br />

at the TCIC offices. On April 6, with the<br />

bids submitted and the teams on hand,<br />

the TCIC hosted a social and networking<br />

event for the team members and sponsors,<br />

and the winners were announced.<br />

The formal award presentations were<br />

made later, at Members Day on May 12.<br />

Winners received cash prizes and<br />

plaques. All participants received certificates<br />

– and their participation in the<br />

competition was factored into their class<br />

marks, Drisdelle says. This year more<br />

than 100 students entered in 41 teams,<br />

which was about double the number<br />

that took part in 2009.<br />

A unique feature of the event is that<br />

it’s educational for the judges as well<br />

as the entrants. The entrants this time<br />

around were students in the third year<br />

of the four-year degree program in construction<br />

at George Brown College – but<br />

the “owners/developers” who judged<br />

the bids were students, too, and from the<br />

fourth year of the same program.<br />

Builders' Digest Quarter 3 2010 | 17


BID Competition<br />

First place, Most Professional Bid: Tangent <strong>Construction</strong> Inc. (Gianluca Caligiuri, Albert<br />

Melchior)<br />

Second Place, Most Professional Bid: JAKS Consulting Inc. (Kayleigh Dobbin,<br />

Scott Chant, Andrew Dingemans, Jordan Spergel)<br />

The fact that entrants doubled in one year demonstrates<br />

that the Bid Competition is an idea whose time has come. The<br />

TCIC has heard from schools across Canada that are interested<br />

in participating. At press time, the TCIC was just ramping up its<br />

outreach efforts to these and other schools to make the 2011<br />

competition an even bigger success. “The exponential growth<br />

of this competition will be enormous,” says John Mollenhauer,<br />

TCIC Vice Chancellor and President. “Everyone involved in<br />

the construction industry in any way, shape or form is better for<br />

having had some estimating experience.”<br />

The companies that contributed prize money and provided<br />

mentors for competitors take the same view. “We have a real<br />

shortage of people in the industry who can do estimates,”<br />

says Deborah Fillippe, HR Director of Kenaidan Contracting.<br />

“When a student applies and we see that they’ve been in the<br />

competition, we see that as a strong plus for that candidate.”<br />

This is the kind of hands-on education that construction<br />

students can really use: it furthers their education but it also<br />

lets them get their feet wet in the real world of bidding and<br />

estimating, which is the heart and soul of the industry. “The<br />

competition is good hands-on experience,” Mollenhauer says.<br />

“When these students go into workforce they’ll have a true<br />

feeling for what it’s really like.”<br />

Most importantly they’ll experience up-close the apparent<br />

paradox that makes construction such a uniquely attractive<br />

career: the fact that competition and a spirit of camaraderie<br />

can co-exist so well. That spirit shows clearly in the faces of the<br />

winning teams.<br />

Craig Lesurf, Senior Vice President of <strong>Construction</strong> Operations,<br />

Vanbots, probably sums it up best: “This competition is<br />

extremely valuable in shaping our future leaders.”<br />

NOTE: A video of the Bid Competition can be viewed at<br />

the TCIC website (www.tcic.ca) or at the TCIC’s Student Bid<br />

Competition website at www.tcicbidcomp.com. |BD<br />

First place, Closest to Budgeted Price: RockSolid (Jonathan Graf, Pascal Uwajeneza,<br />

Nick Walden, Kegan Buchanan)<br />

18 | Builders' Digest Quarter 3 2010<br />

Second Place, Closest to Budgeted Price: JAKS Consulting Inc. (Scott Chant,<br />

Andrew Dingemans, Kayleigh Dobbin, Jordan Spergel)


Widest Selection of <strong>Construction</strong> Equipment in Ontario<br />

• Largest inventory of telescope and<br />

articulating booms, scissor lifts, forklifts,<br />

Power & HVAC and dirt equipment<br />

• 24/7 Customer Care Center and<br />

Emergency Service<br />

• Safety Training & MTO Compliant<br />

• Delivery to Job Site<br />

• New & Used Equipment Sales<br />

Consider it done. TM<br />

Visit one of our 28 Ontario locations today.<br />

General Rental<br />

Aerial<br />

Barrie<br />

705-722-8181<br />

Guelph<br />

519-824-6760<br />

Mississauga<br />

905-814-8533<br />

Sarnia<br />

519-344-2475<br />

Walkerton<br />

519-881-2921<br />

Brampton<br />

905-456-2820<br />

Belleville<br />

613-968-9595<br />

Kenora<br />

807-548-1234<br />

North Bay<br />

705-472-4080<br />

Scarborough<br />

416-289-1010<br />

Waterloo<br />

519-885-5000<br />

Dryden<br />

807-937-3325<br />

Brantford<br />

519-756-0700<br />

Kingston<br />

613-389-5211<br />

Oshawa<br />

905-576-7200<br />

Stoney Creek<br />

905-643-6701<br />

Windsor<br />

519-966-2772<br />

London<br />

519-685-5438<br />

Cambridge<br />

519-623-3720<br />

Kitchener<br />

519-576-6000<br />

Ottawa<br />

613-745-3060<br />

Stratford<br />

519-271-1952<br />

Oshawa<br />

905-439-2304<br />

Collingwood<br />

705-445-7811<br />

London<br />

519-453-3660<br />

St. Catharines<br />

905-685-4269<br />

<strong>Toronto</strong><br />

416-461-9887<br />

Stoney Creek<br />

905-643-0999<br />

Rentals • Sales • Service • Supplies<br />

800-UR-RENTS<br />

unitedrentals.com


Members' Day<br />

Deeper into the Future<br />

TCA Members’ Day is a major event: this year, attendees were given a thoughtful<br />

appraisal of opportunities in the “Post-Stimulus Age”<br />

By Andrew Brooks<br />

Keynote speaker George Smitherman lays out his vision for<br />

the city<br />

TCA president John Mollenhauer (left) and TCA board chair Glenn Ackerley with George Smitherman after the<br />

keynote<br />

TCA MEMBERS’ <strong>DAY</strong> AND OPEN HOUSE IS ALWAYS A<br />

standout professional/social event on<br />

<strong>Toronto</strong>’s construction calendar. This year<br />

marked the 16th Members’ Day, which<br />

was held at the TCA <strong>Construction</strong> Centre<br />

in Richmond Hill on Wednesday, May 12.<br />

Attendance was strong and the takeaways<br />

were excellent as always. Attendees were<br />

treated to an animated keynote by prominent<br />

provincial and municipal politician<br />

George Smitherman; they heard from<br />

a panel of industry experts about what<br />

kinds of opportunities they can anticipate<br />

once infrastructure stimulus funding<br />

has ended; they got a hands-on look at<br />

industry products and services; they met<br />

20 | Builders' Digest Quarter 3 2010<br />

some of the future stars of the construction<br />

business from across the country;<br />

they were treated to a fantastic barbecue<br />

lunch; and most important of all, they<br />

had fun — and an opportunity to get to<br />

know some of their peers in the industry.<br />

A CANDIDATE’S KEYNOTE<br />

As a current <strong>Toronto</strong> mayoralty candidate<br />

and former Ontario Deputy Premier and<br />

Minister of Energy and Infrastructure,<br />

Smitherman has a unique perspective on<br />

the city and how it fits into the broader<br />

infrastructure picture. Always a compelling<br />

speaker, he delivered an off-the-cuff<br />

keynote talk about his vision for the city’s<br />

future, and told attendees that he believes<br />

more infrastructure work is required to<br />

bring the kind of renewal the city needs.<br />

Smitherman’s mayoralty campaign<br />

platform features a two-phase “Integrated<br />

Transportation Plan” that promises to<br />

bring together public and private transportation<br />

modes. A major element of the<br />

plan is expansion of the TTC. The first<br />

phase extends to 2015, in time for the<br />

Pan Am Games, and promises to focus<br />

on expansion of existing transit routes<br />

as well as the opening of a rail link from<br />

Union Station to Pearson International<br />

Airport. The second phase extends to<br />

2020 and will feature further transit


MFM BUILDING<br />

PRODUCTS<br />

MFM Building Products – Excellence in Weather<br />

Barrier Products<br />

MFM Building Products offers the construction industry more than<br />

50 years experience in providing waterproofing and weather barrier<br />

products. The company has continued to grow and foster new<br />

product development, improve product performance and reduce<br />

overall costs with a value-based philosophy.<br />

All MFM products are tested and retested to ensure that they exceed<br />

customer expectations for performance and reliability. An in-house<br />

testing facility and strict manufacturing practices are focused on<br />

providing a consistent product, pallet after pallet, box after box.<br />

Peel & Seal® Self-Stick Roofing Solution<br />

Peel & Seal® is the original self-stick roll roofing membrane<br />

designed for low-slope/low-pitch residential and commercial roofing<br />

applications. Available in various color options, Peel & Seal® selfadheres<br />

for fast installation and reduces labor and material costs. By<br />

lowering internal temperatures, Peel & Seal® is the economical and<br />

environmentally friendly solution!<br />

MFM Underlayment Products<br />

Regardless of the conditions outside, MFM Underlayment<br />

solutions deliver top-of-the-line protection for any roof. The<br />

MFM family of smooth or mineral-surfaced underlayments are<br />

self-adhesive, self-sealing membranes designed to perform in<br />

extreme weather conditions including high temperature and metal<br />

roofing applications.<br />

Peel & Seal ® is the professional, fast and<br />

profitable low-slope roofing system<br />

IB-3 StormStopper is the ultimate underlayment<br />

membrane waterproofing solution<br />

MFM – A Solutions Provider<br />

MFM offers a skilled technical sales force that is knowledgeable and<br />

experienced in the construction industry and can recommend the<br />

right MFM product for a specific application. Contact an MFM<br />

Building Products professional today for the right solution to your<br />

waterproofing or weather barrier needs at 800-882-7663 or visit<br />

www.solutions.mfmbp.com.<br />

MFM Building Products – A Pioneer in the <strong>Construction</strong><br />

Industry for More Than 50 Years<br />

Peel & Seal ® is ideal for commercial or<br />

residential waterproofing applications<br />

MFM Building Products<br />

P.O. Box 340<br />

Coshocton, Ohio 43812<br />

800-882-7663<br />

www.mfmbp.com<br />

MFM Sales Contact:<br />

Tony Reis<br />

Email: treis@mfmbp.com


Members' Day<br />

Industry forum members (l to r): John O’Toole,<br />

Executive Vice President and Executive Managing<br />

Director from CB Richard Ellis; Brad Lambert, Regional<br />

Vice President, Real Estate Markets-Ontario, RBC;<br />

Leslie Woo, Vice President of Policy and Planning<br />

at Metrolinx; and Bill Hutchinson, Council Chair,<br />

i-Waterfront Advisory Council Executive Director,<br />

Intelligent Communities Waterfront <strong>Toronto</strong><br />

CAREERS YOU<br />

CAN BUILD ON.<br />

extensions to integrate suburban areas,<br />

especially the city’s northwest. The end<br />

result, Smitherman says, will be that GTA<br />

residents will be able to travel anywhere<br />

across the GTA conveniently by transit —<br />

a far cry from the situation today.<br />

Other planks in Smitherman’s<br />

campaign platform of interest to builders<br />

include investments in the revitalization<br />

of city parks, improved and new sports<br />

and recreation facilities (part and parcel<br />

of the work being done for the Pan Am<br />

Games), and increasing the number of<br />

indoor playgrounds.<br />

POST-STIMULUS PERSPECTIVES<br />

The industry forum brought together four<br />

industry insiders for a longer-term look at<br />

construction in <strong>Toronto</strong>. John O’Toole<br />

TRAINING TO<strong>DAY</strong> TO MEET<br />

THE DEMANDS OF TOMORROW<br />

UNITED ASSOCIATION LOCAL 46<br />

PLUMBERS, STEAMFITTERS AND WELDERS<br />

22 | Builders' Digest Quarter 3 2010<br />

WWW.UALOCAL46.ORG<br />

Leslie Woo reminded attendees of the transit investment<br />

deficit <strong>Toronto</strong> still suffers from. That and the fact that<br />

the GTA continues to grow at a rapid pace means that<br />

projects like the Metrolinx “Big Move” transit plan – $50<br />

billion to be invested over 25 years – will be delivering<br />

construction opportunities long into the future


1 2<br />

3<br />

4<br />

5<br />

6<br />

A national practice<br />

solving local problems<br />

8<br />

7 10<br />

Strategic Advice<br />

Representation<br />

Consultation<br />

12<br />

O N T A R I O L A W Y E R S<br />

T O R O N T O<br />

1. Geza Banfai<br />

416 643.6968<br />

gbanfai@heenan.ca<br />

2. Joel Watson<br />

416 643.6955<br />

jwatson@heenan.ca<br />

3. Howard Krupat<br />

416 643.6969<br />

hkrupat@heenan.ca<br />

4. Steven Sokalsky<br />

416 643.6941<br />

ssokalsky@heenan.ca<br />

5. Matthew Benson<br />

416 643.6956<br />

mbenson@heenan.ca<br />

6. Samantha Ambrozy<br />

416 360.3546<br />

sambrozy@heenan.ca<br />

O T T A W A<br />

7. Louis-Pierre Grégoire<br />

613 236.1751<br />

lpgregoire@heenan.ca<br />

8. Alyssa Tomkins<br />

613 236.6942<br />

atomkins@heenan.ca<br />

<strong>Construction</strong><br />

R e c o g n i z e d , R e s p e c t e d , E x p e r i e n c e d .<br />

Heenan Blaikie LLP • Lawyers I Patent and Trade-mark Agents • <strong>Toronto</strong> Montreal Vancouver Québec Calgary Sherbrooke Ottawa Trois-Rivières Victoria Paris Singapore • heenanblaikie.com


Members' Day<br />

<strong>Construction</strong> is one of the most ‘hands-on’ industries there is, so it was appropriate to give Members’ Day attendees a chance to interact with industry products and talk to the<br />

people who deliver them. Booths were set up inside the <strong>Construction</strong> Centre and also outside on the grounds<br />

of CB Richard Ellis, Brad Lambert from<br />

RBC, Leslie Woo of Metrolinx and Bill<br />

Hutchinson, Intelligent Communities<br />

Waterfront <strong>Toronto</strong>, looked at the future<br />

of construction in <strong>Toronto</strong> after the largescale<br />

infrastructure funding programs<br />

end in 2011. If construction in <strong>Toronto</strong><br />

experiences any kind of slump, O’Toole<br />

said, it will be a slump from an elevated<br />

starting point. The city’s market for office<br />

space ranks sixth in the world, and it’s a<br />

very active environment. New construction<br />

adds hundreds of millions of dollars’<br />

worth of work, and the drive to bring<br />

Some of the industry professionals who helped make<br />

the day a success<br />

24 | Builders' Digest Quarter 3 2010<br />

older inventory up to competitive standards<br />

adds some $400 million more.<br />

The signs are also good as far as Leslie<br />

Woo of Metrolinx is concerned. Woo<br />

laid out the demographic developments<br />

that are transforming <strong>Toronto</strong>, pointing<br />

out that another 2.62 million people<br />

will move into the Greater <strong>Toronto</strong> and<br />

Hamilton Area (GTHA) in the next 20<br />

years. That’s in the context of what she<br />

calls the “Lost Generation of Investment”<br />

in transportation infrastructure. No<br />

one who commutes to work in <strong>Toronto</strong><br />

needs to be told that traffic congestion<br />

is a serious problem, but many attendees<br />

were probably surprised to hear how<br />

serious the economic cost is now, and how<br />

quickly it’s going to get much worse.<br />

“Today, congestion in the GTHA costs<br />

commuters $3.3 billion, and drains $2.2<br />

billion out of the region’s economy,” she<br />

said. “By 2031, those figures will be $7.8<br />

billion for commuters and $7.2 billion<br />

out of the economy.” To put this in<br />

context, that’s significantly more than the<br />

comparable current figures for New York<br />

and Chicago.<br />

Brad Lambert of RBC noted that,<br />

financially at least, <strong>Toronto</strong> seems to have<br />

weathered the recession fairly well. “We<br />

haven’t seen a big increase in the number<br />

of stressed loans,” he said. “In fact, that<br />

number has been fairly steady over the<br />

last 10 years.” Lambert countered some<br />

conventional wisdom by suggesting that<br />

while 2009 and 2010 have seen a bit of<br />

a slowdown in terms of volume of work,<br />

the private sector remains active and<br />

involved, and ready to contribute to<br />

construction investment as the market<br />

begins to pick up.<br />

“I think generally it’s not all doom and<br />

gloom,” he said, “especially compared<br />

with the year before, when there was the<br />

expectation of a real decline.”<br />

Bill Hutchinson backed up that viewpoint<br />

in his presentation, pointing to<br />

the combination of public and private<br />

interests that are actively engaged in<br />

major projects along <strong>Toronto</strong>’s waterfront.<br />

These are largely in preparation for<br />

the 2015 Pan Am Games, which require<br />

major investment in housing and event<br />

venues. But the work extends beyond<br />

that time frame: the buildout for the East<br />

Bayfront revitalization extends 10 to 15<br />

years and offers private sector investors<br />

lots of low-risk development space.<br />

Hutchinson also gave attendees an<br />

intriguing glimpse of the planned hightech<br />

backbone for <strong>Toronto</strong>’s waterfront<br />

community, which will support stateof-the-art<br />

services for residents and<br />

businesses.<br />

In addition to the panel and keynote,<br />

a highlight of the event was the handing


out of awards to the winning entrants in<br />

the <strong>Construction</strong> Institute of Canada’s<br />

Simulated Student Bid Competition. The<br />

competition is held annually, and challenges<br />

third-year construction students<br />

from across Canada to submit complete<br />

bids on an actual project in a true-to-life<br />

simulation of competitive conditions.<br />

The competition took place in April and<br />

was based on $2.2 million in upgrades to<br />

Camp Oochigeas in Muskoka. The contest<br />

is judged by fourth-year students. Firstplace<br />

winners in the three awards<br />

categories were:<br />

Most Accurate and Complete Bid:<br />

1st Place ($2,000 prize) – Team Apex<br />

Contracting: David Petrozza, Joseph Lisi,<br />

Mark Farano and Anthony Zambri<br />

Most Professional Bid: 1st Place ($1,000<br />

prize) – Team Tangent <strong>Construction</strong>:<br />

Gianluca Caligiuri and Albert Melchior<br />

Closest to Budgeted Price: 1st Place<br />

($1,000 prize) – RockSolid: Kegan<br />

Buchanan, Nick Walden, Jonathan Graf<br />

and Pascal Uwajeneza<br />

Members’ Day includes the TCA’s<br />

annual Open House, offering attendees<br />

a chance to check out the <strong>Construction</strong><br />

Centre facilities, including the Physical<br />

Members' Day<br />

Plans Room and Electronic Plans Room. It<br />

also features a trade show, which showcases<br />

products and services for the construction<br />

industry at staffed supplier booths. |BD<br />

Some of the winners of the <strong>Construction</strong> Institute of Canada’s 2010 Simulated Student Bid Competition: Team<br />

Tangent <strong>Construction</strong> Inc.’s Gianluca Caligiuri (l) and Albert Melchior accept the $1,000 first place award for Most<br />

Professional Bid<br />

Cause<br />

Effect<br />

Programs<br />

designed by<br />

industry<br />

Job-ready<br />

graduates<br />

George Brown College programs are<br />

designed in partnership with industry to<br />

produce job-ready graduates for industry.<br />

Partner with us now to connect with your<br />

future construction professionals.<br />

Want to know more Contact us today.<br />

416-415-5000 Ext. 3817<br />

georgebrown.ca/build<br />

GBC_10009_Builder'sDigest_v1.indd 1<br />

Builders' Digest 1/25/10 Quarter 3:13:47 3 2010 PM | 25


SUSTAINABILITY<br />

GREEN IS GOOD, AS THEY SAY, BUT IT CAN ALSO BE A<br />

tangled jungle for those trying to make<br />

their way through the myriad of products<br />

and services that are out there. While<br />

everyone is pushing for more sustainable<br />

building practices, those charged with<br />

getting the job done still face some tough<br />

challenges in understanding the market,<br />

its supplies and its practices.<br />

Fortunately in Ontario, help is on the<br />

way. A special centre showcasing and<br />

explaining sustainable construction technologies<br />

is set to open in Vaughan, in the<br />

southern part of the province, this fall.<br />

The Ontario Sustainable <strong>Construction</strong><br />

and Resource Centre (OSCAR) promises<br />

to offer green building support and<br />

to lessen the knowledge gap that exists<br />

between suppliers, building professionals<br />

and the government sector on the topic<br />

of sustainable building practices.<br />

“Our goal is to increase the economic<br />

prosperity of Ontario’s green building<br />

products industry by offering services<br />

and programs that help drive innovation<br />

in our six ‘Ps’: product, practices,<br />

projects, policy, performance and service<br />

providers,” explains Julie Scarcella, the<br />

centre’s executive director, and the<br />

person who has spearheaded the project<br />

from the very beginning.<br />

A longtime sustainable building<br />

consultant and project manager through<br />

her own company, Blue Wilderness<br />

Management Group Inc., Scarcella has<br />

experienced the aforementioned ‘knowledge<br />

gap’ firsthand. She can easily cite<br />

stories reflecting the dire consequences<br />

of this information shortfall — from<br />

cutting-edge supplies gone bad due<br />

to improper storage, to projects held<br />

up for months because of government<br />

inspectors who lack knowledge on a new<br />

practice being employed.<br />

By way of example, Scarcella relates<br />

a recent experience in her own family.<br />

“My mother just built a cottage utilizing a<br />

Green Smarts<br />

A new Ontario resource centre promises muchneeded<br />

support and information on sustainable<br />

building products and practices<br />

wastewater system that was off the grid. It<br />

took two years to get approval through the<br />

municipality to get the system installed.<br />

The inspector had not [seen] that system<br />

before and the builder did not want to<br />

make reference to it. They didn’t know<br />

how to make it to code. It cost twice as<br />

much as my mother had budgeted for,<br />

and took twice as much time.”<br />

LOSSES ACROSS THE BOARD<br />

On a larger scale, building contractors<br />

face similar scenarios across the country<br />

every day, even with those supplies being<br />

manufactured right on their home turf<br />

in Canada. Like Scarcella’s mother, businesses<br />

are losing time and money in<br />

BY Roma Ihnatowycz<br />

the process, and this is where the new<br />

resource centre should be able to help. “If<br />

we are looking at time management and<br />

cost management, that is where OSCAR is<br />

going to assist,” notes Scarcella.<br />

Part of the problem is that the green<br />

manufacturing industry is so advanced<br />

that building professionals are having a<br />

hard time keeping up. As a result there<br />

is a certain disconnect, and reconnecting<br />

the dots is imperative in order to both<br />

optimize the technology and move the<br />

province forward as a leader in environmentally<br />

friendly construction.<br />

While OSCAR is a first for Ontario,<br />

many other countries, particularly in<br />

Western Europe, already have similar<br />

26 | Builders' Digest Quarter 3 2010


SUSTAINABILITY<br />

“ ”<br />

There is a lot of fine-tuning. There is a lot that we want to do, and it’s about honing<br />

in on the key services that OSCAR needs to provide and that the industry needs<br />

— Julie Scarcella, Executive Director, Ontario Sustainable <strong>Construction</strong> and Resource Centre<br />

sustainable resource centres in place, as does British Columbia<br />

here in Canada. Ontario is now playing catch-up — a strange<br />

scenario given that more than half of the country’s construction<br />

activity takes place in the province.<br />

Ontario also ranks high in terms of LEED buildings going up.<br />

Blue Wilderness reports that it has the greatest number of registered<br />

and certified LEED projects for all building types. That’s<br />

about 36 per cent of the market, compared to British Columbia<br />

with 24 per cent and Alberta with 16 per cent.<br />

With the help of the new centre, Scarcella hopes to position<br />

the province as a true leader in the green building sector in<br />

Canada. “It’s going to be one of OSCAR’s mandates,” she says.<br />

“There are many not-for-profit organizations with their own<br />

mandates in the province, but there hasn’t been leadership<br />

from a province-wide standpoint to look at the green building<br />

sector and what it represents.”<br />

OSCAR will act as a go-to information point for a wide range<br />

of interested parties, be they architects, construction professionals,<br />

tradespeople, students or the general public. If it’s tied<br />

to green building, OSCAR will have the answers people are<br />

looking for — information that is currently not readily available<br />

through traditional channels, and certainly not all in one location.<br />

“Take a water cistern,” notes Scarcella. “When it comes to<br />

finding a manufacturer, knowing how to install it properly, the<br />

correct specifications, critical documentation — this information<br />

is nowhere to be found. It’s difficult to find the information<br />

that you need to install the cistern and to utilize it. The second<br />

problem in Canada is that we don’t have product standards to<br />

help manufacturers reduce their carbon footprints.”<br />

The centre will also be a place where various professionals<br />

— from LEED consultants to manufacturers — can meet on<br />

common ground to learn and develop new ideas and technology.<br />

One of its goals is to combine the talents of the industry<br />

by working together to advance new partnerships, and to establish<br />

a physical ‘campus’ to foster education, sharing of ideas,<br />

demonstrations and innovation in the green building industry.<br />

needed to turn OSCAR into a fully operational resource centre.<br />

To date, there has been no financial support from the government;<br />

however, Scarcella and her staff of three are still working<br />

on this.<br />

The Centre will start operation slowly, opening for limited<br />

hours and offering select services to start, while it works on<br />

building and developing others. “There is a lot of fine-tuning,”<br />

says Scarcella. “There is a lot that we want to do, and it’s about<br />

honing in on the key services that OSCAR needs to provide and<br />

that the industry needs.”<br />

In the long term, training will be a key component of the<br />

service offerings, both on site and off. Plans are in place to<br />

introduce a ‘Training on Wheels’ program to bring OSCAR’s<br />

educational component to different regions across the province.<br />

“OSCAR can help all of Ontario. This is not a City of<br />

Vaughan project or a City of <strong>Toronto</strong> project. We want to get to<br />

the other regions,” says Scarcella.<br />

“‘Training on Wheels’ means that if we’re looking at specific<br />

construction materials or renewables, we can take that training<br />

to a satellite area. We can bring the training and the knowledge<br />

to a specific remote area. This probably won’t be realized until<br />

year three, but ‘Training on Wheels’ is an important component<br />

of our business plan.”<br />

OSCAR has already been embraced by 10 key industry associations,<br />

including the <strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong>, the<br />

<strong>Toronto</strong> Green Building Council and the Ontario Society of<br />

Professional Engineers. They view the resource centre as a valuable<br />

addition to the province’s green building playing field. As<br />

the project gains momentum, and opens its doors for business<br />

in the fall, everyone will be able to benefit from its services. |BD<br />

GRADUAL START<br />

OSCAR will operate as a not-for-profit corporation, and is<br />

expected to open in a limited capacity this fall, while continuing<br />

to seek necessary funding. Scarcella has invested more than<br />

$200,000 to get things off the ground; however, more funding is<br />

Builders' Digest Quarter 3 2010 | 27


Walters Group


BUILDING INFORMATION MODELLING<br />

A New Kind<br />

of Model<br />

BIM fosters teamwork, nips<br />

project problems in the bud,<br />

supports LEED design – and is<br />

even changing construction’s<br />

legal landscape<br />

By Kelly Parker<br />

All images courtesy of Autodesk<br />

THE NEXT WAVE IS HERE.<br />

Maybe the term “tide” is more appropriate, as the use of Building Information Modelling<br />

— a term coined by design software vendor Autodesk, but which has since become<br />

a generic term for the process known as BIM — relentlessly advances as arguably the<br />

most significant evolution ever in construction technology.<br />

Properly defined, BIM is a process that delivers construction projects using parametric<br />

modelling of the building in virtual space, prior to construction. The model<br />

is then shared between and passed from discipline to discipline along the project<br />

delivery chain, with content being added and extracted as needed by the consulting<br />

and construction teams.<br />

Builders' Digest Quarter 3 2010 | 29


BUILDING INFORMATION MODELLING<br />

“[BIM is] kind of a<br />

scary concept in the world<br />

of construction, but the<br />

idea should be that any<br />

discipline can look into this<br />

thing; it’s transparent and<br />

it brings the team together<br />

big-time — it’s all about<br />

collaboration<br />

”<br />

Al Prowse, President,<br />

H. Griffiths Co. Ltd.<br />

The living virtual model ultimately contains all pertinent<br />

information including building materials and specifications,<br />

constructability details, environmental design and building<br />

lifecycle data. BIM software provides all constituents of the<br />

construction process an end-to-end look at all elements of a<br />

building’s construction phases and overall lifecycle, and in the<br />

process enables closer and more effective co-operation between<br />

all of them.<br />

The resulting efficiencies are nothing short of startling, with<br />

anecdotal reports by some users of ROIs of 1000 per cent.<br />

McGraw Hill published a 2008 Smart Market Report on BIM<br />

that indicated the increasing adoption of BIM use even then.<br />

Co-sponsored by the buildingSMART Alliance, the Smart<br />

Market Report identified that experienced users (in the United<br />

States, at least) were realizing greater productivity, improved<br />

communications and a competitive edge when bidding work.*<br />

Al Prowse is President of H. Griffiths Co. Ltd., and the<br />

MCA Canada rep on the Canada BIM Council — the recently<br />

formed advocacy, resource and standards council for the<br />

process. Prowse explains that whereas before, everything<br />

was just put on paper and everybody worked it all out on<br />

site — which is quite costly — the concept behind BIM is that<br />

everybody shares in the development of the model. “Every<br />

time someone touches and handles this thing,” he says,<br />

“the model should be enriched — it should become more<br />

defined with more information. It’s kind of a scary concept<br />

in the world of construction, but the idea should be that any<br />

discipline can look into this thing; it’s transparent and it brings<br />

the team together big-time — it’s all about collaboration.”<br />

The fact that these constituents all get into the same room at<br />

the same time so early is itself a major shift from the old norm,<br />

according to Scott Burke, Solutions Consultant and Team<br />

Manager with AEC Solutions. “It simply didn’t happen. They<br />

would talk to each other when required and might be brought<br />

30 | Builders' Digest Quarter 3 2010


BUILDING INFORMATION MODELLING<br />

in later in the process. Now,” he says,<br />

“when a project starts, everybody who is<br />

going to be involved gets together in a<br />

room and talks about coordination, who<br />

is going to be responsible for what, and<br />

when the model should be ready to be<br />

delivered to an MEP engineer.” Burke<br />

notes that BIM causes more communication<br />

than previously possible “because we<br />

have this model with which to share the<br />

information in a much more dynamic,<br />

graphic and accurate way.”<br />

That information is the real power<br />

of BIM. “I always say that the ‘i’ in BIM<br />

should be capitalized,” emphasises Burke,<br />

“because that is the most important part<br />

of the process. As an engineer draws a<br />

structural component, the information<br />

about that component is embedded in<br />

the object, including engineering properties<br />

— the type of steel used, the weight of<br />

that steel and its dimensional properties.”<br />

INFORMATION EXCHANGE<br />

That all of this information can be so<br />

easily shared is part of what makes BIM<br />

so important to the industry. “If an<br />

MEP engineer changes the size of an<br />

air-handling unit — which changes its<br />

electrical properties — that information<br />

is automatically updated on the electrical<br />

engineer’s drawing so that he knows that<br />

the circuit might [need changing]. Once<br />

that change is made,” he explains, “the<br />

architect also sees that perhaps there<br />

is more room in the space because the<br />

air-handling unit is now smaller, so it’s<br />

the information sharing that is the key<br />

to BIM.”<br />

The other advantage to BIM is that<br />

it allows for the virtual testing of what<br />

Prowse calls the “what-if scenarios.” “Let’s<br />

say that you have a huge piece of equipment<br />

that has to come into a building<br />

throughout a construction cycle,” he<br />

explains. “When you know the exact<br />

physical requirements to get it through,<br />

you can hold off on putting this wall<br />

in, or on putting that piece of concrete<br />

there until that other task is done. All of<br />

a sudden, maybe you don’t need to bring<br />

in that crane and your costing can be<br />

controlled, your scheduling can be better<br />

planned — any time that you’re not taking<br />

steps backwards, you’re realizing savings.”<br />

One of the greatest advantages of<br />

BIM is in the area of design for LEED<br />

credits. “Previously,” notes Burke, “energy<br />

testing and analysis couldn’t be done<br />

until the building was built. Now, the<br />

HVAC engineer can take the Revit model<br />

from the architect and do his heat and<br />

energy load calculations on it to find out<br />

how much energy he is going to need to<br />

heat and cool the building. He can even<br />

make suggestions to the architect — ‘If<br />

you just rotate the building on the site<br />

by 15 degrees, we can save $5,000 a<br />

year in heating or cooling costs, or if we<br />

change the roof to this or the orientation<br />

of something,’ so BIM really is a huge<br />

advantage there.”<br />

This wholesale change in the process<br />

has also modified contractual arrangements.<br />

“The AIA [American Institute of<br />

Architects] here in the States,” says Burke,<br />

“has written whole new contracts for BIM<br />

because clarity is essential around issues<br />

like who owns the model, and who is<br />

Builders' Digest Quarter 3 2010 | 31


BUILDING INFORMATION MODELLING<br />

responsible for what, so there is a whole<br />

new legal practice that is evolving out of<br />

BIM. In many respects HVAC engineers<br />

are becoming more responsible for things;<br />

overall, I think, there is still the same level<br />

of responsibility on everyone’s part, but<br />

it’s being shifted around a little bit.”<br />

Of all of the constituents realizing the<br />

advantages of BIM, Burke feels it’s the<br />

construction industry that is outpacing all<br />

in adopting the process, “because they’re<br />

all about bottom line and money and how<br />

to keep things from getting screwed up<br />

because they’re the ones who have to eat<br />

that, so the construction industry really<br />

seems to be latching onto BIM, either by<br />

requiring BIM models, or making their<br />

own from 2-D plans.”<br />

To that end, in fact, Autodesk has<br />

another product called Navisworks,<br />

a reading-only program designed to<br />

extract and co-ordinate information<br />

32 | Builders' Digest Quarter 3 2010


Canada’s Leading “SPECIALTY”<br />

Insurance Company<br />

Contract Surety<br />

Our experience in Contract Surety<br />

Bonding continues to build solid and<br />

long-term relationships between<br />

brokers and contractors.<br />

OTHER PRODUCTS:<br />

• Contract Surety • Directors’ and Officers’ Liability<br />

• Fidelity Bonds • Credit Insurance<br />

• Commercial/Miscellaneous Surety<br />

• ® (Executive Home and Automobile Insurance)<br />

<br />

SINCE 1872<br />

gcna.com


BUILDING INFORMATION MODELLING<br />

from BIM models from any company, not just Autodesk. “The<br />

construction industry is latching onto Navisworks,” explains<br />

Burke, “because it’s enabling them to take models from Bentley,<br />

ArchiCAD, Autodesk and any other company, combine it into<br />

one structure and then do their own interference reports,<br />

construction scheduling and so on. Navisworks is becoming the<br />

main tool of the construction industry.”<br />

Ultimately, BIM’s benefit is in eliminating the grey areas. “It<br />

takes you past the discussion along the lines of ‘it should work,’”<br />

emphasises Prowse, “because you can see right in the modelling<br />

that it will work. BIM is a huge advantage in planning and<br />

executing what we do.”<br />

*Download the free report: http://construction.ecnext.<br />

com/coms2/summary_0249-296182_ITM_analytics |BD<br />

ADVERTISERS INDEX<br />

Vol. 5 No.1 Quarter 3 2010<br />

Builders’ Digest<br />

BEC Equipment................................................42<br />

www.becequipment.ca<br />

BlueBeam Software Inc...................................11<br />

www.bluebeam.com<br />

C.W. Smith Crane<br />

Service Ltd....................................................... 3<br />

www.cwsmithcraneservice.com<br />

Continental Cabinet Company Inc..................39<br />

www.continentalcabinet.com<br />

Geninfo Solutions Inc......................................31<br />

www.geninfosolutions.com<br />

Heenan Blaikie Management Ltd...................23<br />

www.heenanblaikie.com<br />

George Brown College....................................25<br />

www.georgebrown.ca<br />

The Graff Company ULC..................................32<br />

www.graffconcrete.com<br />

The Graham Group..........................................30<br />

www.graham.ca<br />

The Guarantee Company of North America...33<br />

www.gcna.com<br />

Imaginit Technologies............................ 40 & 42<br />

www.rand.com<br />

34 | Builders' Digest Quarter 3 2010<br />

KIB Restoration...............................................32<br />

www.kibrestoration.com<br />

CANet Ontario.................................................37<br />

www.canetontario.cc<br />

MAPEI Inc...................... Inside Front Cover & 42<br />

www.mapei.com<br />

Mathews, Dinsdale & Clark LLP......................42<br />

www.mathewsdinsdale.com<br />

MFM Building Products Corp..........................21<br />

www.solutions.mfmbp.com<br />

Oakridge Kitchen & Bath/a Division of<br />

Oakridge Millwork Ltd...........Inside Back Cover<br />

www.oakridgekitchens.ca<br />

Ontario <strong>Construction</strong> Secretariat..................... 7<br />

www.iciconstruction.com<br />

Onyx Mechanical Ltd................................ 4 & 42<br />

www.onyxmech.com<br />

Permacon Group..............................................42<br />

www.permacon.ca<br />

Peterbilt of Canada.........................................42<br />

www.peterbilt.com<br />

RBC Financial Group........................................35<br />

www.rbc.com<br />

Schindler Elevator Corporation......................15<br />

www.ca.schindler.com<br />

Sobotec Ltd......................................................42<br />

www.sobotec.com<br />

Synstone..........................................................17<br />

www.synstone.com<br />

The TRH Group.................................................42<br />

www.trh-group.com<br />

Tractel Group..................................................... 8<br />

www.tractel.com<br />

Trisura Guarantee Insurance Company...........27<br />

www.trisura.com<br />

United <strong>Association</strong> Local 46............................22<br />

www.ualocal46.org<br />

United Rentals of Canada...................... 19 & 42<br />

www.ur.com<br />

Vipond Inc........................................................14<br />

www.vipond.ca<br />

Walters Group Inc............................................28<br />

www.waltersinc.com<br />

WeirFoulds LLP....................Outside Back Cover<br />

www.weirfoulds.com<br />

Zone Electric Inc..............................................42<br />

www.zonelectric.ca


To Lease<br />

or not<br />

to Lease<br />

Acquiring new equipment<br />

can be an effective way<br />

to boost productivity and<br />

increase capacity. Financing<br />

this investment in your<br />

business, however, can be<br />

one of the greatest challenges<br />

for many businesses.<br />

Business growth<br />

starts with a<br />

conversation.<br />

To take your construction business to the next level,<br />

RBC ® has dedicated teams of industry specialized<br />

account managers who have a deep understanding<br />

of what drives your market and business model.<br />

Leasing can be an efficient and<br />

effective financing alternative<br />

for managing growth and planning<br />

for the replacement of existing<br />

equipment and technology, while<br />

preserving cash flow. Paying for<br />

equipment outright may restrict<br />

cash which could be better deployed<br />

to finance sales (i.e. receivables<br />

and inventory) or distribute to<br />

shareholders. Avoiding the heavy<br />

up-front cash costs of purchasing<br />

equipment and reducing monthly<br />

finance payments are two of the key<br />

reasons why many companies prefer<br />

to lease.<br />

Is leasing right for your company<br />

First consider how long you will<br />

actually use the equipment in<br />

question. If you only need it for<br />

a limited time, if the equipment<br />

will soon become obsolete, or if<br />

you prefer to upgrade every couple<br />

of years, then leasing may be a<br />

better option.<br />

If you plan to keep the equipment<br />

for its entire useful life, it may or may<br />

not be better to buy it, depending on<br />

your cash flow requirements and tax<br />

situation. Some leases are structured for<br />

To start a conversation today, visit<br />

rbcroyalbank.com/commercial<br />

specialized purposes such as allowing<br />

your company to accelerate claims for tax<br />

credits; they can be advantageous even<br />

if you plan to keep the asset for its entire<br />

productive life. It is important to consider<br />

fully the financial implications before<br />

deciding between a lease, a loan or a<br />

cash purchase.<br />

It is generally not wise to pay for<br />

long-term assets with working capital.<br />

If you do, you may hinder your future<br />

ability to pay recurring obligations<br />

like rent, utilities or payroll if business<br />

conditions get tougher.<br />

Before deciding to lease, compare the<br />

total leasing cost with the total cost of<br />

financing the purchase price by way of<br />

a loan. Remember to include the costs<br />

of any loan interest, insurance and<br />

taxes that you can expect to pay if<br />

you own the asset.<br />

Bottom line<br />

Leasing can be an ideal form of financing<br />

for both income-producing equipment<br />

as well as leasehold improvements,<br />

computers, office furniture and many<br />

other equipment requirements.<br />

For more information about how<br />

RBC can help you and your business,<br />

speak with an RBC <strong>Construction</strong><br />

Specialist today by calling<br />

1-800 ROYAL ® 2-0. Or visit<br />

www.rbcroyalbank.com/commercial<br />

to learn more.<br />

TM<br />

These materials are provided by Royal Bank of Canada for general information purposes only.<br />

®<br />

Registered trademarks of Royal Bank of Canada. RBC and Royal Bank are registered trademarks of Royal Bank of Canada. Trademarks of Royal Bank of Canada.


profile<br />

View from<br />

THE TOP<br />

A willingness to face new challenges has brought<br />

Chris Gower a long way in a short time<br />

By Kelly Parker<br />

THERE IS A COMMON THREAD TO BE FOUND IN<br />

the successful and still growing career<br />

of Chris Gower, PCL Constructors’<br />

regional vice president for Central and<br />

Eastern Canada: people. Gower was<br />

recently named to the “Top 40 Under<br />

40,” an annual listing and awards event<br />

organized by executive search firm<br />

The Caldwell Partners International<br />

to honour Canadians under 40 for<br />

outstanding achievement.<br />

Over his 15-year PCL career, Gower has<br />

managed multimillion-dollar construction<br />

projects, including the $396-million<br />

Infield Development project at the<br />

Lester B. Pearson International Airport<br />

in <strong>Toronto</strong>, and has been responsible for<br />

more than $1.3 billion of work in Ontario<br />

and the Atlantic provinces.<br />

All of this can be traced back to<br />

his London high school years when<br />

Gower was given a chance to work some<br />

construction with his older brother, one<br />

of several mentoring figures he credits for<br />

this recent accolade.<br />

Gower found intrigue in the idea that<br />

in constructing something, he was able to<br />

leave a little bit of himself behind. Soon<br />

he was enrolled in a Fanshawe College<br />

course in construction engineering, technology<br />

and management. “It’s funny,” he<br />

says, “because you start off framing houses<br />

and not really thinking in broader terms<br />

about what the industry has to offer. I<br />

just loved what I was doing; reading blueprints,<br />

building buildings and just being<br />

part of all of that. From there, college<br />

broadened my curiosity about other<br />

aspects of the business — the engineering,<br />

legal and people side of the business.”<br />

A stint with Altus Helyar as a quantity<br />

surveyor and cost consultant after college<br />

gave Gower a foundation for the business<br />

— a sense of how projects were<br />

financed and the economics behind<br />

the business. Eventually, he felt the pull<br />

of the building aspect of the business<br />

that first attracted him and he took<br />

a junior estimator position at PCL<br />

36 | Builders' Digest Quarter 3 2010


profile<br />

“<br />

There have been lots of people who have helped along the way, from old-time<br />

superintendents who helped you get through that first job, to that district manager who<br />

pushed you into a job that you didn’t think you could do<br />

”<br />

— Chris Gower, regional vice president, PCL Constructors<br />

before getting into project management. Following a stint<br />

as PCL district manager in Saskatchewan, he was called<br />

back to <strong>Toronto</strong> to take on the series of positions that led<br />

him to his current office just over a year and a half ago.<br />

PUSHING THE BOUNDARIES<br />

It’s been a relatively swift trip, which Gower attributes to a<br />

willingness to step out of his comfort zone. “I think some<br />

people are debilitated by fear or an inability to take on the<br />

next role,” he explains, “where we really don’t know all of<br />

the answers, but you figure it out as you go. For me, I’ve<br />

been somewhat fearless in taking on new challenges, and<br />

I haven’t been afraid to fail. The other thing is; when you<br />

do fail — and everybody does to varying degrees — I always<br />

thought it was really important to learn from those things.”<br />

Gower is also quick to credit the people who were there to<br />

support him as he made his mistakes. “I’ve had tons of great<br />

mentors and I share this accolade in a large part with PCL.<br />

There have been lots of people who have helped along the way,<br />

from old-time superintendents who helped you get through<br />

that first job, to that district manager who pushed you into a<br />

job that you didn’t think you could do, or the president of an<br />

organization who enabled you to take on an opportunity out of<br />

province to try new things that way. Our company is really big<br />

on mentoring, and I didn’t get here by myself, that’s for sure.”<br />

Now that he is here, Gower has his eyes on two major industry<br />

issues: government funding and foreign rules of competition.<br />

He is supportive of industry efforts to persuade the government<br />

to continue injecting money into the system amid<br />

rumours that it is going to begin tightening those purse strings.<br />

“Certainly, they have to do that in a timely manner because they<br />

can’t continue to spend forever, but construction is such a huge<br />

factor in the GDP that if it’s sustained by itself, it’s going to help<br />

the overall economic picture. If the government turns off the<br />

tap, the whole industry is going to get real quiet because the<br />

private sector hasn’t yet kicked in following the economic crash<br />

to any great degree — it’s coming, but it’s not nearly at a volume<br />

that will replace the funding provided by the government.”<br />

Gower would also like to see more focus on the evaluation<br />

criteria relating to foreign competition. “There is nothing<br />

wrong with bringing international competition into the<br />

marketplace,” he emphasizes, “but there has to be some<br />

fairness around how they’re assessed and evaluated against<br />

local competition. We need a level playing field, because if it’s<br />

not, the government thinks that it’s buying smarter and better,<br />

and maybe it’s not and the money is just leaving the country.”<br />

THE HOME FRONT<br />

Despite a demanding work schedule that has recently expanded<br />

to include responsibility for a new PCL office in Australia,<br />

Gower is actively involved in the community, loaning his efforts<br />

to associations such as The Darling Home for Kids (formally<br />

the Rose Cherry Home). Very occasionally, he can be found on<br />

a golf course, or out for a rare dinner with his wife of 16 years.<br />

More likely, though, he’s at his 11-year-old son’s games, or at his<br />

8-year-old daughter’s dance performances.<br />

Travel is also an integral part of their family life, as the Gowers<br />

try to instill a love of learning about other places and people in<br />

their kids. Having explored France last year, plans are underway<br />

for a trek to Italy this year.<br />

You get the sense that part of the reason Gower wants to take<br />

his kids outside of their suburban geographical box is to show<br />

them the wonders the world can hold for them if they only have<br />

the courage to get out there. That, and the fact that everywhere<br />

they go in life, to whatever place on the planet, there will be<br />

people to teach them life’s most valuable lessons.<br />

Fearlessness and an appreciation for what people can teach<br />

an open mind, after all, have taken Gower himself this far along<br />

his own journey. |BD<br />

Builders' Digest Quarter 3 2010 | 37


BUSINESS PRACTICES & CHALLENGES<br />

BRINGING TOGETHER A GROUP OF LIKE-MINDED<br />

professionals to share solutions to their<br />

problems has recently gained ground on<br />

Internet blogs and with various special<br />

interest groups across the country. The<br />

reasoning behind it is simple: individuals<br />

who have devised solutions to unique<br />

industry obstacles are best positioned to<br />

help others facing similar challenges.<br />

This was top of mind when the <strong>Toronto</strong><br />

<strong>Construction</strong> <strong>Association</strong> decided to step<br />

into the fray with its newly established<br />

Small Business Best Practices Committee.<br />

The committee aims to assist TCA<br />

members by providing them with a valuable<br />

forum to learn from their peers. This<br />

type of in-house ‘brain trust’ represents a<br />

first for the organization.<br />

“The concept is to create an opportunity<br />

for business owners of small-and mediumsized<br />

enterprises to brainstorm on best<br />

practices for building a better business in<br />

the construction industry,” explains TCA<br />

volunteer and Chartered Accountant<br />

Joel Baker, who spearheaded the concept<br />

and chairs the committee. “It’s about<br />

giving members something of value.”<br />

How exactly will best practices be<br />

determined The beauty of such a forum,<br />

notes Baker, is that it will be ‘organic’ in<br />

nature and that solutions will be established<br />

in the course of discussion. “It’s an<br />

exchange of ideas, recommendations and<br />

solutions that have proven to be effective<br />

for our constituents. We’ve all learned<br />

lessons along the way about running our<br />

businesses more effectively — why not<br />

share them” asks Baker, a partner with<br />

SBLR LLP Chartered Accountants, a<br />

<strong>Toronto</strong>-based firm that specializes in the<br />

construction sector.<br />

“It’s about working on your business<br />

rather than just working in your business,”<br />

Industry<br />

Think-Tank<br />

“We’ve all learned lessons along the way about<br />

running our businesses more effectively — why not<br />

share them” – Joel Baker<br />

By Roma Ihnatowycz<br />

38 | Builders' Digest Quarter 3 2010


BUSINESS PRACTICES & CHALLENGES<br />

benefit from the open exchange of<br />

information. “We will take minutes of<br />

the meetings and then write up everything<br />

in the newsletters that the TCA<br />

puts out,” says Baker. “As a result, we<br />

can let members at large know the best<br />

practices of other business owners.”<br />

FOCUS ON SMEs<br />

Committee members will be small and<br />

medium-sized business owners, owing to<br />

the fact that they represent by far the association’s<br />

largest constituency — upwards<br />

of 90 per cent of the TCA membership.<br />

“We want to appeal to the majority of the<br />

constituency. Talking about problems<br />

that relate to a large public contractor<br />

wouldn’t relate to 95 per cent of the<br />

constituency. Similarly, the committee is<br />

not intended to deal with individuals that<br />

contract business,” Baker says.<br />

Baker likens the setup to a think-tank<br />

for construction professionals, and says<br />

continues Baker. “A lot of business owners<br />

are busy hammering the nails and not<br />

paying attention to details like contracts,<br />

recruitment and cost controls. Those are<br />

the types of issues that these people have<br />

to discuss.”<br />

Baker, who also sits on the TCA’s Strategic<br />

Planning Committee and its Allied<br />

Professionals Committee, will chair the<br />

meetings, which will take place four to<br />

six times annually. While limited to a<br />

workable group of about 25 members, a<br />

complete overview of the discussion —<br />

and any valuable information gleaned<br />

from it — will be shared with the entire<br />

TCA membership via the association’s<br />

monthly newsletter.<br />

This way, all TCA members can<br />

Continental Cabinet Company Inc<br />

547 Clarke Road, London ON N5V 2E1<br />

Phone: 519-455-3830 • Fax: 519-455-9993<br />

Email: Email: reception@continentalcabinet.com<br />

pvolk@continentalcabinet.com<br />

Website: continentalcabinet.com<br />

Builders' Digest Quarter 3 2010 | 39


BUSINESS PRACTICES & CHALLENGES<br />

Joel Baker: the new committee combines cooperation with confidentiality<br />

(BIM)<br />

Is there a REAL benefit to BIM<br />

for General Contractors<br />

BIM helps general contractors<br />

and builders gain a competitive<br />

advantage with:<br />

• Better insight into<br />

constructability and<br />

materials costs, before a<br />

project begins<br />

• Improved coordination and<br />

clash detection, leading to<br />

fewer errors and change<br />

orders<br />

• Enhanced 4D construction<br />

scheduling, linking<br />

timelines to 3D building<br />

model geometry to keep<br />

projects on track<br />

Contact us TO<strong>DAY</strong>!<br />

Brian Gauthier<br />

Senior Account Representative<br />

bgauthier@rand.com<br />

T: 905-625-2000 Ext. 5230<br />

www.rand.com/imaginit<br />

he was inspired by organizations such as the Young Presidents’<br />

Organization (YPO), an online global networking forum of<br />

young CEOs for the exchange of ideas. “What happens is that<br />

you get a group of like-minded business owners in an industry<br />

together and they feel free to share issues that they are experiencing.<br />

The true value, however, is realized by sharing solutions<br />

that have worked for them,” says Baker.<br />

Tackling small business challenges head-on will strengthen<br />

the value proposition delivered to TCA members, which in turn<br />

will help grow the association’s membership base. It will boost<br />

the TCA’s capacity to help members cope with the many hurdles<br />

they face by allowing them to apply the very tangible skills and<br />

knowledge provided by the broad range of construction professionals<br />

that will sit on the committee.<br />

Also, and perhaps most importantly, this tangible business<br />

benefit will be delivered at no cost. For smaller companies<br />

trying to shepherd their organizations through a rocky market,<br />

this represents a much-appreciated complimentary resource.<br />

Topics for the meetings will vary in scope and subject matter,<br />

based first and foremost on relevance. Ideas already being<br />

floated include business improvement and growth concepts,<br />

strategic business planning, performance indicators, business<br />

transition planning, accounting and cost-control systems, to<br />

name a few.<br />

For those concerned about confidentiality and competition,<br />

Baker stresses this shouldn’t pose a concern. In many cases businesses<br />

are not direct competitors, and if they are, their owners<br />

can be guarded in the knowledge they share. “One business<br />

may be in the not-for-profit sector, and the other in the housing<br />

industry, so there is not a conflict of interest or a competitive<br />

issue,” points out Baker. “And if there is, they may choose not<br />

to share certain things. But what’s wrong with sharing best<br />

practices in human resources or employee benefits Or insurance<br />

tips, accounting systems, or remuneration to the CEO<br />

Everyone can benefit from that type of exchange.”<br />

Clearly, challenges specific and unique to the construction<br />

industry are best suited for discussion in a forum of like-minded<br />

professionals. By bringing together builders, contractors and<br />

suppliers actively working in construction, industry-specific challenges<br />

can be fully assessed, dissected and resolved — whether<br />

it’s looking at how to attract young people to the profession,<br />

or dealing with the bonding industry, or putting together the<br />

best construction contract. Only a group of skilled construction<br />

professionals can explore these and other industry-specific<br />

topics to their full extent.<br />

On a final note, aside from the educational benefit of joining<br />

the committee, its volunteers will also be doing something for<br />

the good of the TCA and its members. This represents an added<br />

incentive to get on board and help out. “As a member of an<br />

association, you want to take part in it,” says Baker. “That is why<br />

members join an association . . . to help make it strong, and to<br />

help it benefit the industry. You get what you give.” |BD<br />

The TCA is currently looking for volunteers to sit on its<br />

Small Business Best Practices Committee. Those interested in<br />

joining can contact Lenore Villeneuve, committee coordinator, at<br />

lvilleneuve@tcaconnect.com, 416-499-4000, ext. 113.<br />

40 | Builders' Digest Quarter 3 2010


<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong><br />

Upcoming Events<br />

Collaborative Web-Based Process:<br />

The Next Technology Step in <strong>Construction</strong><br />

Construct Canada 2010<br />

The Close Out – Best Practices for<br />

Closing out a <strong>Construction</strong> Project<br />

ADR: Why Litigation May Be Like Working Without a Hard-<br />

Hat: Learn More about ADR – the Cost-Effective Alternative<br />

TCA Christmas Lunch<br />

Export Ready – Diversifying your Business<br />

beyond North America<br />

TCA Annual General Meeting<br />

TCA Ski Day<br />

Annual Golf Classic<br />

007 Diamond Casino Gala<br />

Tuesday, November 16, 2010<br />

Location: TCA<br />

Wednesday, December 1 to Friday, December 3, 2010<br />

Location: Metro Convention Centre<br />

Wednesday, December 1, 2010<br />

At Construct Canada<br />

Thursday, December 2, 2010<br />

At Construct Canada<br />

Friday, December 3, 2010<br />

Location: Metro Convention Centre<br />

2011, date to be confirmed<br />

Airport Hotel, <strong>Toronto</strong><br />

Thursday, January 27, 2011<br />

Woodbine Entertainment Centre<br />

Friday, February 25, 2011<br />

Alpine Ski Club, Collingwood<br />

Tickets go on sale January 3, 2011<br />

Thursday, May 19, 2011<br />

Copper Creek & Eagles Nest Golf Clubs<br />

Tickets go on sale April 2, 2011<br />

Saturday, February 11, 2012<br />

Liberty Grand Entertainment Complex<br />

For further information please contact Mary McBride, Special Events Coordinator • Email mmcbride@tcaconnect.com<br />

<strong>Toronto</strong> <strong>Construction</strong> <strong>Association</strong>, 70 Leek Crescent, Richmond Hill, Ontario L4B 1H1 • www.tcic.ca<br />

Young <strong>Construction</strong> Executives Club<br />

Thursday, November 11, 2010<br />

YCEC Annual Pub Night<br />

Madison Avenue Pub<br />

14 Madison Avenue, near Spadina and Bloor, <strong>Toronto</strong><br />

YCEC Family Skate/Hockey<br />

Saturday, January 29, 2011<br />

Brampton Powerade Centre<br />

Poker Night March 2011<br />

YCEC <strong>Toronto</strong> Harbour Boat Cruise June 2011<br />

YCEC Board of Directors Golf Invitational September 2011<br />

Working Weekend – Leadership for Young Executives October 2011<br />

Pub Night November 2011<br />

For further information please contact Erin Cimino, Manager, Special Projects • Email ecimino@tcaconnect.com<br />

The <strong>Construction</strong> Institute of Canada<br />

Seminar: <strong>Construction</strong> Liens and Trusts Thursday, November 18, 2010<br />

Course: Help with Green Building Rating Systems Tuesday, November 23, 2010 to Tuesday, January 11, 2011<br />

Workshop: The Close-Out Project<br />

Wednesday, December 1, 2010<br />

At Construct Canada<br />

<strong>Construction</strong> Management Essentials Part 1<br />

Monday, January 10, 2011<br />

Ten weeks<br />

Blueprint Reading and Estimating Level 1<br />

Tuesday, January 11, 2011<br />

Ten weeks<br />

<strong>Construction</strong> Management Essentials Part 2<br />

Wednesday, January 12, 2011<br />

Ten weeks<br />

Planning and Scheduling<br />

Thursday, January 13, 2011<br />

Ten weeks<br />

The Leadership Challenge Wednesday, March 2 to Friday, March 4, 2011<br />

For further information please contact Roxanne Drisdelle, Professional Development Co-ordinator at<br />

(416) 499-4000 ext. 116 • Email rdrisdelle@tcaconnect.com • www.tcic.ca<br />

The<br />

<strong>Construction</strong><br />

Institute of<br />

Canada<br />

Builders' Digest Quarter 3 2010 | 41


BUYERS' & SOURCE GUIDE<br />

Aluminium Building Panels<br />

Backhoe Equipment<br />

Concrete Masonry Products<br />

SOBOTEC LTD.<br />

67 BURFORD ROAD<br />

HAMILTON, ON L8E 3C6<br />

Vladimir Sobot<br />

vdsobot@sobotec.com<br />

Tel.: 905-578-1278 / Fax: 905-578-1446<br />

Website: www.sobotec.com<br />

BEC EQUIPMENT<br />

1780 BONHILL ROAD<br />

MISSISSAUGA ON L5T 1C8<br />

George Conley<br />

Tel.: 905-670-7678 / Fax: 905-670-7260<br />

Website: www.becequipment.ca<br />

PERMACON GROUP<br />

8375 5TH SIDE ROAD<br />

MILTON, ON L9T 2X7<br />

Marcus Poirier<br />

cs.milton@permacon.ca<br />

Tel.: 1-800-265-0692 / Fax: 905-875-4216<br />

Website: www.permaconpro.ca<br />

Electrical Contractor<br />

Equipment Rentals<br />

Insurance<br />

®<br />

electric inc.<br />

ZONE ELECTRIC INC.<br />

37 SEWELLS LANE<br />

BRAMPTON, ON L7A 2Z9<br />

Henry Medley<br />

info@zonelectric.ca<br />

Tel.: 416-628-9681 / Fax: 905-495-1532<br />

Website: www.zonelectric.ca<br />

Lawyers<br />

MATHEWS DINSDALE & CLARK LLP<br />

1 QUEEN ST EAST, 25th Floor<br />

TORONTO, ON M5C 2Z1<br />

Theresia Skoberne<br />

tskoberne@mathewsdinsdale.com<br />

Tel.: 416-869-8556 / Fax: 416-862-8247<br />

Website: www.mathewsdinsdale.com<br />

UNITED RENTALS<br />

2790 ARGENTIA ROAD<br />

MISSISSAUGA, ON L5N 8L2<br />

C. Freeborn<br />

cfreeborn@ur.com<br />

Tel.: 416-433-9644 / Fax: 647-723-0364<br />

Website: www.ur.com<br />

(BIM)<br />

Is there a REAL benefit to BIM<br />

for General Contractors<br />

BIM helps general contractors<br />

and builders gain a competitive<br />

advantage with:<br />

• Better insight into<br />

Manufactured Tile & Stone Installation constructability and<br />

& Concrete Restoration Systems materials costs, before a Mechanical<br />

project begins<br />

• Improved coordination and<br />

clash detection, leading to<br />

fewer errors and change<br />

orders<br />

• Enhanced 4D construction<br />

MAPEI INC.<br />

scheduling, linking ONYX MECHANICAL LTD.<br />

2130 WILLIAMS PARKWAY<br />

timelines to 3D building 214 WILKINSON RD<br />

BRAMPTON, ON L6S 5X7<br />

model geometry BRAMPTON, to keep ON L6T 4M4<br />

John Wm. Sommers<br />

projects on trackKaren Backus<br />

jsommers@mapei.com<br />

Contact us TO<strong>DAY</strong>!<br />

karen@onyxmech.com<br />

Tel.: 905-799-2663 / Fax: 905-799-2436<br />

Tel.: 905-866-6699 / Fax: 905-866-6690<br />

Website: www.mapei.com Brian Gauthier Website: www.onyxmech.com<br />

Senior Account Representative<br />

bgauthier@rand.com<br />

T: 905-625-2000 Ext. 5230<br />

www.rand.com/imaginit<br />

TRISURA GUARANTEE INSURANCE COMPANY<br />

70 YORK STREET, SUITE 1100<br />

TORONTO, ONTARIO M5J 1S9<br />

Sarah Mainella<br />

sarah.mainella@trisura.com<br />

Tel.: 416-214-2555 / Fax: 416-214-9597<br />

Website : www.trisura.com<br />

Safety, Environmental<br />

Training & Education<br />

Technologies<br />

Truck Manufacturers<br />

THE TRH GROUP<br />

261 MILWAY AVENUE, UNIT #1<br />

CONCORD, ON L4K 3K9<br />

Al Aiello<br />

sales@trh-group.com<br />

Tel: 905-669-9517 / Fax: 905-669-9496<br />

Toll Free: 800-806-8444<br />

Website: www.trh-group.com<br />

42 | Builders' Digest Quarter 3 2010<br />

IMAGINIT TECHNOLOGIES<br />

905 BEACH AVENUE<br />

VANCOUVER, BC V6Z 1E1<br />

Nathania MacGregor<br />

nmacgregor@rand.com<br />

Tel.: 604-270-7660 / Fax: 604-270-7630<br />

Website: www.rand.com<br />

PETERBILT OF CANADA<br />

6711 MISSISSAUGA ROAD, SUITE 501<br />

MISSISSAUGA, ON L5N 4J8<br />

Greg Grabinsky<br />

greg.grabinsky@paccar.com<br />

Tel.: 905-858-7097 / Fax: 905-858-7091<br />

Website: www.peterbilt.com


Oakridge Kitchens - Affordable Elegance<br />

At Oakridge Kitchens we build kitchens, vanities, media centres, wall units, and bars.<br />

We deliver quality workmanship and functional designs, customized to suit your needs, at a reasonable price.<br />

Multi-unit Kitchens: OAKRIDGE KITCHENS line of multi-unit<br />

kitchens is designed and manufactured with the condo, apartment<br />

units and rental market in mind.<br />

Custom Kitchens: Our expertise in kitchen cabinets covers the<br />

entire gamut, from multi-unit kitchens all the way to beautifully<br />

designed and custom made kitchens.<br />

Bathroom Vanities: Let Oakridge Kitchens custom design your<br />

bathroom vanity and turn your bathroom into an oasis of comfort.<br />

Wall Units: Your custom built wall unit or media centre will look<br />

good, keep you organized, hide equipment, wires and connectors<br />

and be the focal point of your room.<br />

Bars: A room with an ambience of fun and enjoyment that can add<br />

an entirely new dimension to your home.<br />

Architectural Millwork: Your place of business needs to be<br />

efficient and functional and it needs to tell your employees,<br />

colleagues and customers something about your company. Unique,<br />

custom designed architectural millwork can help set your place of<br />

business, and your company, apart from the rest.<br />

Our company: Our family owned and operated business is proud<br />

of our innovative designs, quality workmanship and exceptional<br />

service. The Oakridge team consists of Paul DiGirolamo,<br />

responsible for design and custom millwork; Lorenzo DiGirolamo,<br />

responsible for production and field installations; and Michael<br />

DiGirolamo, in charge of sales, marketing and customer service.<br />

Protecting your environment: We are Environmentally Friendly<br />

Certified. Oakridge Kitchens now offers the choice of utilizing urea<br />

formaldehyde free plywood and particle core materials.<br />

Quality Statement Oakridge products are guaranteed to give<br />

100% satisfaction in every way. If our product or service proves<br />

otherwise, we promise to correct the problem to the complete<br />

satisfaction of our customers. All of our products and installations<br />

are warranted against materials defect and workmanship. This has<br />

been our family tradition since 1992.<br />

9 Bradwick Dr., Concord, Ontario L4K 2T4<br />

Ph: (905) 761-2815 Fax: (905) 761-5984<br />

ouzi@oakridgemillwork.ca


“WeirFoulds has serviced our<br />

corporate, real estate, leasing,<br />

design-build, construction,<br />

consulting and other legal needs<br />

for more than 35 years, as we<br />

expanded from a single location to a<br />

multi-faceted complex of companies<br />

with offices throughout the world.”<br />

Victor Smith, CEO, Ingenium Group Inc.,<br />

An Integrated Consulting and Design-Build Company<br />

grew up with WeirFoulds.<br />

To find out more, call Glenn Ackerley<br />

at 416.947.5008 or email him at<br />

ackerley@weirfoulds.com.<br />

Protect your future. Gain a competitive advantage. WeirFoulds LLP.<br />

416.365.1110<br />

www.weirfoulds.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!