26.12.2014 Views

A NEW DAY A NEW DAY - Toronto Construction Association

A NEW DAY A NEW DAY - Toronto Construction Association

A NEW DAY A NEW DAY - Toronto Construction Association

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AdvertoriAl<br />

A DV E RTO R I A L<br />

Bringing Winners of the the TCA “Trade past Contractors back to Award” life<br />

The Onyx Mechanical team provides have to build the foundation for our company Onyx Mechanical’s recent projects in the<br />

mechanical construction services for the - a commitment that proves to our clients commercial sector include:<br />

Death and taxes - those we all know are ties and demonstrate the value of building times in significant leaps and some of the<br />

ICI sector of Southern Ontario and has<br />

the universal constants, but there is a<br />

that Onyx Mechanical is prepared to stand<br />

mock ups. What can look acceptable on paper<br />

out will from change the pack,” considerably says Chris. when “If you built want in With the Food fall Court fast approaching, the rush is<br />

most • significant <strong>Toronto</strong> Eaton’s changes Centre are North still to come.<br />

third over - aging. 68 years We of can’t combined escape experience the effects in<br />

of the time plumbing and neither and can HVAC the industry. buildings Partners we the to real make world. a difference Sometimes you have you really to be have willing on to enclose the building and complete<br />

construct. Chris Nielsen, They John eventually E. McKinnon fail, just and like Bryon to to “stand contribute, there” to for be the a part answer of something to come. and the • mechanical Milton Arts elements & Entertainment required Centre to<br />

us. Backus There is, have however, built a one first-rate major difference<br />

in the - we industry can rescue and those have structures Now with the major issues resolved, the<br />

reputation<br />

provide<br />

leave your mark for those who follow to see the heat Bradford finishing. Library The finish may<br />

worked with<br />

still be months away, but Lister Block will<br />

before it’s too late.<br />

pace what of you construction could achieve,” has increased state the significantly.<br />

partners. Lister “Onyx Block is changes our achievement, daily, some-our<br />

times ahead for us all.<br />

three undoubtedly<br />

industry leaders such as GovenBrown, PCL<br />

• Square still One have CRU some interesting<br />

One Constructors, such building and in Century Hamilton, Group. Ontario,<br />

pride and our future.”<br />

• Lester Block Hamilton<br />

has escaped the wrecking ball. A historical<br />

“Our building biggest in asset downtown is our Hamilton reputation,” called Chris<br />

Lister says, Block “but will it takes live to a see significant many more effort by<br />

decades everyone of use. in the company to maintain and<br />

Breathing grow that new reputation.” life into a building that’s<br />

already had two lives is a significant<br />

That reputation is due, in no small part,<br />

challenge, one that owner LIUNA and<br />

developer to the company’s The Hi-Rise mission Group willingly to exceed its<br />

accepted. clients’ expectations. Originally built Onyx in 1886, Mechanical Lister<br />

Block does burned this by to the building ground and in 1923 maintaining and<br />

was long-term rebuilt in relationships 1924. 2009 saw with the its beginning<br />

ensuring of the satisfaction latest rebuild, through with the unparalleled old<br />

clients,<br />

structure having already been stripped and<br />

communications and teamwork.<br />

key elements preserved for reuse. Installing<br />

“When modern we HVAC commit and to plumbing something, into we a work<br />

building on schedule, never designed on budget, for such and services we don’t<br />

is a considerable challenge, but Onyx<br />

‘nickel-and-dime’ everything that comes<br />

Mechanical was up to the task.<br />

up,” says Chris.<br />

Joining Greenferd <strong>Construction</strong>’s team<br />

in One October example 2009, of Onyx Mechanical’s began installing serious<br />

the commitment mechanical to infrastructure its work is the that company’s would<br />

service support the of completed LEED construction. building. As with<br />

all heritage buildings, certain architectural<br />

elements “We fully had been support kept LEED in place construction which<br />

complicated and enjoy the participating build and in forced these the types of<br />

relocation projects,” of says various Chris. services “We believe from their that we<br />

planned have a responsibility routes. Always to mindful future generations of the to<br />

historical significance of the old interior<br />

participate in and encourage environmentally<br />

wood corridor partitions, Onyx would find<br />

alternative<br />

sustainable<br />

routes<br />

projects.”<br />

for those<br />

John<br />

services.<br />

admits that the<br />

value and effectiveness required by a LEED<br />

Another<br />

project<br />

complication<br />

comes at a premium,<br />

would prove<br />

but<br />

to<br />

says<br />

be<br />

that<br />

the old structure itself. The usually simple<br />

“Onyx is there to assist the entire project<br />

task of keeping vertical elements in line from<br />

floor team to in floor finding required the finding balance a between structural fiscal element<br />

and that social was responsibility.”<br />

perfectly vertical. In modern<br />

construction, the structure provides this<br />

The company has also devoted a<br />

reference but in a building thought to be<br />

one considerable of the first concrete amount framed of time buildings and money in<br />

Canada, in the this administrative accuracy was area lacking. of its business.<br />

With state-of-the-art computers, IT servers,<br />

In fact the structure would further complicate<br />

in-house the build plotting as the floor machines, to floor specialized heights<br />

became estimating, restrictive. and Most accounting of us usually and project<br />

take management no notice of software, ceiling height, Onyx but has when solidly Onyx Mechanical Ltd. Phone: 905-866-6699<br />

installing invested mechanical in the office elements, infrastructure. maintaining<br />

that height is critical. The reduced ceiling 214 Wilkinson Road Fax: 905-866-6690<br />

heights “There found are companies in the Lister many Block times building our size Brampton ON L6T 4M4 Website: www.onyxmech.com<br />

would that have challenge not invested the entire a fraction team’s of abili- what we

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!