A NEW DAY A NEW DAY - Toronto Construction Association
A NEW DAY A NEW DAY - Toronto Construction Association
A NEW DAY A NEW DAY - Toronto Construction Association
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AdvertoriAl<br />
A DV E RTO R I A L<br />
Bringing Winners of the the TCA “Trade past Contractors back to Award” life<br />
The Onyx Mechanical team provides have to build the foundation for our company Onyx Mechanical’s recent projects in the<br />
mechanical construction services for the - a commitment that proves to our clients commercial sector include:<br />
Death and taxes - those we all know are ties and demonstrate the value of building times in significant leaps and some of the<br />
ICI sector of Southern Ontario and has<br />
the universal constants, but there is a<br />
that Onyx Mechanical is prepared to stand<br />
mock ups. What can look acceptable on paper<br />
out will from change the pack,” considerably says Chris. when “If you built want in With the Food fall Court fast approaching, the rush is<br />
most • significant <strong>Toronto</strong> Eaton’s changes Centre are North still to come.<br />
third over - aging. 68 years We of can’t combined escape experience the effects in<br />
of the time plumbing and neither and can HVAC the industry. buildings Partners we the to real make world. a difference Sometimes you have you really to be have willing on to enclose the building and complete<br />
construct. Chris Nielsen, They John eventually E. McKinnon fail, just and like Bryon to to “stand contribute, there” to for be the a part answer of something to come. and the • mechanical Milton Arts elements & Entertainment required Centre to<br />
us. Backus There is, have however, built a one first-rate major difference<br />
in the - we industry can rescue and those have structures Now with the major issues resolved, the<br />
reputation<br />
provide<br />
leave your mark for those who follow to see the heat Bradford finishing. Library The finish may<br />
worked with<br />
still be months away, but Lister Block will<br />
before it’s too late.<br />
pace what of you construction could achieve,” has increased state the significantly.<br />
partners. Lister “Onyx Block is changes our achievement, daily, some-our<br />
times ahead for us all.<br />
three undoubtedly<br />
industry leaders such as GovenBrown, PCL<br />
• Square still One have CRU some interesting<br />
One Constructors, such building and in Century Hamilton, Group. Ontario,<br />
pride and our future.”<br />
• Lester Block Hamilton<br />
has escaped the wrecking ball. A historical<br />
“Our building biggest in asset downtown is our Hamilton reputation,” called Chris<br />
Lister says, Block “but will it takes live to a see significant many more effort by<br />
decades everyone of use. in the company to maintain and<br />
Breathing grow that new reputation.” life into a building that’s<br />
already had two lives is a significant<br />
That reputation is due, in no small part,<br />
challenge, one that owner LIUNA and<br />
developer to the company’s The Hi-Rise mission Group willingly to exceed its<br />
accepted. clients’ expectations. Originally built Onyx in 1886, Mechanical Lister<br />
Block does burned this by to the building ground and in 1923 maintaining and<br />
was long-term rebuilt in relationships 1924. 2009 saw with the its beginning<br />
ensuring of the satisfaction latest rebuild, through with the unparalleled old<br />
clients,<br />
structure having already been stripped and<br />
communications and teamwork.<br />
key elements preserved for reuse. Installing<br />
“When modern we HVAC commit and to plumbing something, into we a work<br />
building on schedule, never designed on budget, for such and services we don’t<br />
is a considerable challenge, but Onyx<br />
‘nickel-and-dime’ everything that comes<br />
Mechanical was up to the task.<br />
up,” says Chris.<br />
Joining Greenferd <strong>Construction</strong>’s team<br />
in One October example 2009, of Onyx Mechanical’s began installing serious<br />
the commitment mechanical to infrastructure its work is the that company’s would<br />
service support the of completed LEED construction. building. As with<br />
all heritage buildings, certain architectural<br />
elements “We fully had been support kept LEED in place construction which<br />
complicated and enjoy the participating build and in forced these the types of<br />
relocation projects,” of says various Chris. services “We believe from their that we<br />
planned have a responsibility routes. Always to mindful future generations of the to<br />
historical significance of the old interior<br />
participate in and encourage environmentally<br />
wood corridor partitions, Onyx would find<br />
alternative<br />
sustainable<br />
routes<br />
projects.”<br />
for those<br />
John<br />
services.<br />
admits that the<br />
value and effectiveness required by a LEED<br />
Another<br />
project<br />
complication<br />
comes at a premium,<br />
would prove<br />
but<br />
to<br />
says<br />
be<br />
that<br />
the old structure itself. The usually simple<br />
“Onyx is there to assist the entire project<br />
task of keeping vertical elements in line from<br />
floor team to in floor finding required the finding balance a between structural fiscal element<br />
and that social was responsibility.”<br />
perfectly vertical. In modern<br />
construction, the structure provides this<br />
The company has also devoted a<br />
reference but in a building thought to be<br />
one considerable of the first concrete amount framed of time buildings and money in<br />
Canada, in the this administrative accuracy was area lacking. of its business.<br />
With state-of-the-art computers, IT servers,<br />
In fact the structure would further complicate<br />
in-house the build plotting as the floor machines, to floor specialized heights<br />
became estimating, restrictive. and Most accounting of us usually and project<br />
take management no notice of software, ceiling height, Onyx but has when solidly Onyx Mechanical Ltd. Phone: 905-866-6699<br />
installing invested mechanical in the office elements, infrastructure. maintaining<br />
that height is critical. The reduced ceiling 214 Wilkinson Road Fax: 905-866-6690<br />
heights “There found are companies in the Lister many Block times building our size Brampton ON L6T 4M4 Website: www.onyxmech.com<br />
would that have challenge not invested the entire a fraction team’s of abili- what we