2 Annual Report 2011<br />

1.1 Foreword by the managing director<br />

Challenges make us stronger<br />

The challenges were ambitiously set also for 2011, while a great deal of exertion,<br />

efforts and sacrifice was devoted to their realisation. Within the framework<br />

of these endeavours, the time was solely a relative category of measuring<br />

intervals between events, which were changing the conditions of trading and<br />

electricity production. While simultaneously performing the largest energy investment,<br />

it was necessary to make additional endeavours and face challenges<br />

besides responding to changing circumstances in ordinary operating conditions.<br />

The construction of replacement Unit 6 at TEŠ was under the spotlight in 2011.<br />

In <strong>HSE</strong> and TEŠ we have been daily facing the critics of the project and responding<br />

to dilemmas and issues, explaining figures, denying false statements<br />

and arguing facts in favour of investment. Numerous activities were oriented<br />

towards ensuring proper conditions to obtain the government guarantee for the<br />

loan from the European Investment Bank. The timely acquisition of guarantee is<br />

namely extremely important for a stable and costly efficient conclusion of investment<br />

in the replacement Unit 6.<br />

It is entirely reasonable that in addition to market permeability and revenue<br />

growth, costs are decreasing and economy is increasing since the combination of<br />

measures on the level of revenue as well as costs enables long-term competitive<br />

capability and consequently good business results. In this regard, we can estimate<br />

2011 as successful, especially if we consider extremely unfavourable natural<br />

conditions, which have added a slightly bitter taste to successful electricity trade.<br />

Several months of deteriorated hydrologic conditions in the wider area of South-<br />

East Europe resulted in a slightly lower electricity production in hydropower<br />

plants within the <strong>HSE</strong> Group, while in the wider region such condition changed<br />

price ratios for electricity and costs of cross-border transfer capacities.<br />

We hope that in 2012 nature will be more prone to us and that the draught period<br />

will be followed by more extensive precipitation and thus the door will be<br />

opened to better product and trade conditions. Even the goals we have set for the<br />

current year are full of challenges and we will reach them solely with responsible<br />

and enthusiastic work, cooperation of individuals and legal entities within the<br />

<strong>HSE</strong> Group and the support of our owners. HR and professional potential of<br />

the <strong>HSE</strong> Group is exceptional and the time people devote to our projects, their