2 Annual Report 2011<br />
1.1 Foreword by the managing director<br />
Challenges make us stronger<br />
The challenges were ambitiously set also for 2011, while a great deal of exertion,<br />
efforts and sacrifice was devoted to their realisation. Within the framework<br />
of these endeavours, the time was solely a relative category of measuring<br />
intervals between events, which were changing the conditions of trading and<br />
electricity production. While simultaneously performing the largest energy investment,<br />
it was necessary to make additional endeavours and face challenges<br />
besides responding to changing circumstances in ordinary operating conditions.<br />
The construction of replacement Unit 6 at TEŠ was under the spotlight in 2011.<br />
In <strong>HSE</strong> and TEŠ we have been daily facing the critics of the project and responding<br />
to dilemmas and issues, explaining figures, denying false statements<br />
and arguing facts in favour of investment. Numerous activities were oriented<br />
towards ensuring proper conditions to obtain the government guarantee for the<br />
loan from the European Investment Bank. The timely acquisition of guarantee is<br />
namely extremely important for a stable and costly efficient conclusion of investment<br />
in the replacement Unit 6.<br />
It is entirely reasonable that in addition to market permeability and revenue<br />
growth, costs are decreasing and economy is increasing since the combination of<br />
measures on the level of revenue as well as costs enables long-term competitive<br />
capability and consequently good business results. In this regard, we can estimate<br />
2011 as successful, especially if we consider extremely unfavourable natural<br />
conditions, which have added a slightly bitter taste to successful electricity trade.<br />
Several months of deteriorated hydrologic conditions in the wider area of South-<br />
East Europe resulted in a slightly lower electricity production in hydropower<br />
plants within the <strong>HSE</strong> Group, while in the wider region such condition changed<br />
price ratios for electricity and costs of cross-border transfer capacities.<br />
We hope that in 2012 nature will be more prone to us and that the draught period<br />
will be followed by more extensive precipitation and thus the door will be<br />
opened to better product and trade conditions. Even the goals we have set for the<br />
current year are full of challenges and we will reach them solely with responsible<br />
and enthusiastic work, cooperation of individuals and legal entities within the<br />
<strong>HSE</strong> Group and the support of our owners. HR and professional potential of<br />
the <strong>HSE</strong> Group is exceptional and the time people devote to our projects, their