28.12.2014 Views

Thames Gateway Interim Plan Development Prospectus - EUKN

Thames Gateway Interim Plan Development Prospectus - EUKN

Thames Gateway Interim Plan Development Prospectus - EUKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Improving Quality of Life: Environmental and Community Infrastructure<br />

B3.10 Mainly a rural setting, the area benefits from attractive marshland and coastline<br />

on the Isle of Sheppey, as well as a range of Areas of Outstanding Natural<br />

Beauty (AONB) and Sites of Specific Scientific Interest (SSSI) throughout the<br />

borough. Improving access and delivering the Green Grid are part of Swale’s<br />

overall regeneration plans. Town centre public realm improvements will also be<br />

put in place as new development is delivered. In addition, Swale’s ‘Flying Start’<br />

project celebrating Sheppey’s aviation heritage takes advantage of this natural<br />

setting and combines it with local heritage to promote tourism on the Island.<br />

Swale’s surrounding natural setting<br />

Transport<br />

B3.11 The Iwade to Queenborough A249 improvements scheme and the new Sheppey<br />

Crossing have improved transport links between Sittingbourne and Sheppey.<br />

Essential infrastructure in progress includes the Sittingbourne Northern Relief Road<br />

and the Rushenden Link Road; both are funded and when complete will enable<br />

new development. In the longer term, Swale proposes that M2 improvements to<br />

Junction 5 and connecting the A2 and M2 via a new junction are required to<br />

consolidate existing development and accommodate further growth.<br />

102<br />

THAMES GATEWAY DEVELOPMENT PROSPECTUS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!