Thames Gateway Interim Plan Development Prospectus - EUKN
Thames Gateway Interim Plan Development Prospectus - EUKN
Thames Gateway Interim Plan Development Prospectus - EUKN
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Improving Quality of Life: Environmental and Community Infrastructure<br />
B3.10 Mainly a rural setting, the area benefits from attractive marshland and coastline<br />
on the Isle of Sheppey, as well as a range of Areas of Outstanding Natural<br />
Beauty (AONB) and Sites of Specific Scientific Interest (SSSI) throughout the<br />
borough. Improving access and delivering the Green Grid are part of Swale’s<br />
overall regeneration plans. Town centre public realm improvements will also be<br />
put in place as new development is delivered. In addition, Swale’s ‘Flying Start’<br />
project celebrating Sheppey’s aviation heritage takes advantage of this natural<br />
setting and combines it with local heritage to promote tourism on the Island.<br />
Swale’s surrounding natural setting<br />
Transport<br />
B3.11 The Iwade to Queenborough A249 improvements scheme and the new Sheppey<br />
Crossing have improved transport links between Sittingbourne and Sheppey.<br />
Essential infrastructure in progress includes the Sittingbourne Northern Relief Road<br />
and the Rushenden Link Road; both are funded and when complete will enable<br />
new development. In the longer term, Swale proposes that M2 improvements to<br />
Junction 5 and connecting the A2 and M2 via a new junction are required to<br />
consolidate existing development and accommodate further growth.<br />
102<br />
THAMES GATEWAY DEVELOPMENT PROSPECTUS