28.12.2014 Views

Thames Gateway Interim Plan Development Prospectus - EUKN

Thames Gateway Interim Plan Development Prospectus - EUKN

Thames Gateway Interim Plan Development Prospectus - EUKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Area Description Outputs/ Phasing Estimates<br />

Capacity<br />

West<br />

Thurrock –<br />

Commodore<br />

Kitchens<br />

This 6 hectare area will be used for<br />

mixed uses including light industry and<br />

housing sites.<br />

Number of<br />

homes to be<br />

determined<br />

<strong>Development</strong> to start 2008<br />

to complete in 2013.<br />

Remediated sites to be<br />

offered to the market<br />

in 2008<br />

West<br />

Thurrock –<br />

Askews<br />

Farm &<br />

Hillside<br />

This 4.3 hectare site will form a<br />

residentially-led mixed-use<br />

development.<br />

250 homes<br />

<strong>Development</strong> to start 2008<br />

to complete in 2013.<br />

Remediated sites to be<br />

offered to the market<br />

in 2008<br />

West<br />

Thurrock<br />

Primary<br />

School<br />

A new school is at the heart of current<br />

proposals to regenerate the Schoolfield<br />

Road area of West Thurrock.<br />

<strong>Development</strong> proposals have come<br />

forward to redevelop this area, build a<br />

new two form entry primary school<br />

and 300 plus dwellings. The developer<br />

has now obtained options on most of<br />

the sites involved.<br />

580 new<br />

housing units<br />

Indirectly<br />

supports<br />

1000 units<br />

210 new<br />

student places<br />

1 new school<br />

West<br />

Thurrock –<br />

LCR sites<br />

These 3.77 hectares are located within<br />

West Thurrock and benefit from<br />

designated access onto purpose-built<br />

roads as part of the CTRL works. They<br />

have been outlined for light industrial<br />

use – decanting from Botany Way sites<br />

in Purfleet.<br />

300 jobs<br />

retained<br />

Begin between 2006-10<br />

Grays<br />

Grays –<br />

Waterfront<br />

Opportunity<br />

<strong>Development</strong> of 210-berth marina with<br />

retail and housing on Grays waterfront.<br />

A study is currently<br />

assessing the potential<br />

of exploiting Grays’<br />

waterfront, based around a<br />

210-berth marina. A brief<br />

for second stage viability<br />

testing is being finalised.<br />

Project begins during the<br />

period 2010-14<br />

THAMES GATEWAY DEVELOPMENT PROSPECTUS 127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!