Thames Gateway Interim Plan Development Prospectus - EUKN
Thames Gateway Interim Plan Development Prospectus - EUKN
Thames Gateway Interim Plan Development Prospectus - EUKN
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Area Description Outputs/ Phasing Estimates<br />
Capacity<br />
West<br />
Thurrock –<br />
Commodore<br />
Kitchens<br />
This 6 hectare area will be used for<br />
mixed uses including light industry and<br />
housing sites.<br />
Number of<br />
homes to be<br />
determined<br />
<strong>Development</strong> to start 2008<br />
to complete in 2013.<br />
Remediated sites to be<br />
offered to the market<br />
in 2008<br />
West<br />
Thurrock –<br />
Askews<br />
Farm &<br />
Hillside<br />
This 4.3 hectare site will form a<br />
residentially-led mixed-use<br />
development.<br />
250 homes<br />
<strong>Development</strong> to start 2008<br />
to complete in 2013.<br />
Remediated sites to be<br />
offered to the market<br />
in 2008<br />
West<br />
Thurrock<br />
Primary<br />
School<br />
A new school is at the heart of current<br />
proposals to regenerate the Schoolfield<br />
Road area of West Thurrock.<br />
<strong>Development</strong> proposals have come<br />
forward to redevelop this area, build a<br />
new two form entry primary school<br />
and 300 plus dwellings. The developer<br />
has now obtained options on most of<br />
the sites involved.<br />
580 new<br />
housing units<br />
Indirectly<br />
supports<br />
1000 units<br />
210 new<br />
student places<br />
1 new school<br />
West<br />
Thurrock –<br />
LCR sites<br />
These 3.77 hectares are located within<br />
West Thurrock and benefit from<br />
designated access onto purpose-built<br />
roads as part of the CTRL works. They<br />
have been outlined for light industrial<br />
use – decanting from Botany Way sites<br />
in Purfleet.<br />
300 jobs<br />
retained<br />
Begin between 2006-10<br />
Grays<br />
Grays –<br />
Waterfront<br />
Opportunity<br />
<strong>Development</strong> of 210-berth marina with<br />
retail and housing on Grays waterfront.<br />
A study is currently<br />
assessing the potential<br />
of exploiting Grays’<br />
waterfront, based around a<br />
210-berth marina. A brief<br />
for second stage viability<br />
testing is being finalised.<br />
Project begins during the<br />
period 2010-14<br />
THAMES GATEWAY DEVELOPMENT PROSPECTUS 127