INSTALLATION<br />
INSTALLATION<br />
9 UNPACKING<br />
<strong>The</strong> boiler is supplied fully assembled in one pack A, together<br />
with a st<strong>and</strong>ard flue assembly for lengths up to 960 mm<br />
(37” 3/4), rear or side flue outlet, in pack B.<br />
Unpack <strong>and</strong> check the contents.<br />
Pack A contents<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
<strong>The</strong> boiler.<br />
Hardware pack<br />
Wall mounting plate<br />
Wall mounting template<br />
Installation & Servicing instructions.<br />
<strong>The</strong> User’s Instructions.<br />
Filling loop assembly<br />
Restrictor pack<br />
Pack B contents<br />
I Air intake pipe ø 100 mm (4”)<br />
J Flue pipe ø 60 mm (2” 3/8) with terminal grille assembly<br />
K B<strong>and</strong><br />
L Turret---air pipe gasket<br />
M Flue pipe gaskets --- 2 off<br />
N Boiler---turret gasket<br />
O Flue turret<br />
P Self tapping screws 4,8x13 --- 4 off<br />
Q Self tapping screw 4,2x13 --- 2 off<br />
R Wall finishing gaskets --- 2 off<br />
R<br />
Q<br />
P<br />
A<br />
D<br />
O<br />
I<br />
N<br />
M<br />
L<br />
K<br />
J<br />
B<br />
E<br />
C<br />
Hardware pack contents<br />
F<br />
F 22 mm CH connection pipe --- 2 off.<br />
F 22 mm Gas supply connection pipe --- 1 off.<br />
F 15 mm DHW cold inlet connection pipe --- 1 off. *<br />
F 15 mm DHW hot outlet connection pipe --- 1 off. *<br />
F 1/2” connection nut --- 2 off. *<br />
F 1/2” sealing washer --- 3 off. *<br />
F 3/4” sealing washer --- 6 off.<br />
F 3/4” Gas supply isolating valve --- 1 off.<br />
F 3/4” CH circuit isolating valve --- 2 off.<br />
F 1/2” DHW cold inlet isolating valve --- 1 off. *<br />
* Mini C24, Mini C28 <strong>and</strong> Mini C32 only<br />
G<br />
H<br />
Optional extras, if ordered, are available in separate boxes.<br />
F Electronic programmer kit *<br />
F Extension duct kit pack D (ø 60/100)<br />
F Flue support kit<br />
F Vertical outlet flue kit with elbow (ø 60/100)<br />
F 90° Elbow kit (ø 60/100)<br />
F 45° Elbow kit (ø 60/100)<br />
F Roof flue kit (ø 80/125)<br />
F Pitched roof tile (for roof flue kit)<br />
F Flat roof tile (for roof flue kit)<br />
F Extension duct kit (ø 80/125)<br />
F 90° Elbow kit (ø 80/125)<br />
F 45° Elbow kit (ø 80/125)<br />
F Condense drain (ø 80/125)<br />
F Twin pipe kit (ø 80) with air <strong>and</strong> flue terminals<br />
F Extension duct kit (ø 80)<br />
F 90° Elbow kit (ø 80) female---female<br />
F 90° Elbow kit (ø 80) male---female<br />
F 45° Elbow kit (ø 80) male---female<br />
F Condense drain (ø 80)<br />
F Condense trap<br />
F St<strong>and</strong>---off bracket<br />
F Pre---piping frame<br />
F Natural gas to LPG conversion kit<br />
F LPG to natural gas conversion kit<br />
10 PACKAGING<br />
To unpack the boiler refer to the instructions on carton end<br />
flap.<br />
12<br />
Mini --- Installation & Servicing