01.01.2015 Views

installation and servicing - The Initiative Group

installation and servicing - The Initiative Group

installation and servicing - The Initiative Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATION<br />

INSTALLATION<br />

9 UNPACKING<br />

<strong>The</strong> boiler is supplied fully assembled in one pack A, together<br />

with a st<strong>and</strong>ard flue assembly for lengths up to 960 mm<br />

(37” 3/4), rear or side flue outlet, in pack B.<br />

Unpack <strong>and</strong> check the contents.<br />

Pack A contents<br />

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

<strong>The</strong> boiler.<br />

Hardware pack<br />

Wall mounting plate<br />

Wall mounting template<br />

Installation & Servicing instructions.<br />

<strong>The</strong> User’s Instructions.<br />

Filling loop assembly<br />

Restrictor pack<br />

Pack B contents<br />

I Air intake pipe ø 100 mm (4”)<br />

J Flue pipe ø 60 mm (2” 3/8) with terminal grille assembly<br />

K B<strong>and</strong><br />

L Turret---air pipe gasket<br />

M Flue pipe gaskets --- 2 off<br />

N Boiler---turret gasket<br />

O Flue turret<br />

P Self tapping screws 4,8x13 --- 4 off<br />

Q Self tapping screw 4,2x13 --- 2 off<br />

R Wall finishing gaskets --- 2 off<br />

R<br />

Q<br />

P<br />

A<br />

D<br />

O<br />

I<br />

N<br />

M<br />

L<br />

K<br />

J<br />

B<br />

E<br />

C<br />

Hardware pack contents<br />

F<br />

F 22 mm CH connection pipe --- 2 off.<br />

F 22 mm Gas supply connection pipe --- 1 off.<br />

F 15 mm DHW cold inlet connection pipe --- 1 off. *<br />

F 15 mm DHW hot outlet connection pipe --- 1 off. *<br />

F 1/2” connection nut --- 2 off. *<br />

F 1/2” sealing washer --- 3 off. *<br />

F 3/4” sealing washer --- 6 off.<br />

F 3/4” Gas supply isolating valve --- 1 off.<br />

F 3/4” CH circuit isolating valve --- 2 off.<br />

F 1/2” DHW cold inlet isolating valve --- 1 off. *<br />

* Mini C24, Mini C28 <strong>and</strong> Mini C32 only<br />

G<br />

H<br />

Optional extras, if ordered, are available in separate boxes.<br />

F Electronic programmer kit *<br />

F Extension duct kit pack D (ø 60/100)<br />

F Flue support kit<br />

F Vertical outlet flue kit with elbow (ø 60/100)<br />

F 90° Elbow kit (ø 60/100)<br />

F 45° Elbow kit (ø 60/100)<br />

F Roof flue kit (ø 80/125)<br />

F Pitched roof tile (for roof flue kit)<br />

F Flat roof tile (for roof flue kit)<br />

F Extension duct kit (ø 80/125)<br />

F 90° Elbow kit (ø 80/125)<br />

F 45° Elbow kit (ø 80/125)<br />

F Condense drain (ø 80/125)<br />

F Twin pipe kit (ø 80) with air <strong>and</strong> flue terminals<br />

F Extension duct kit (ø 80)<br />

F 90° Elbow kit (ø 80) female---female<br />

F 90° Elbow kit (ø 80) male---female<br />

F 45° Elbow kit (ø 80) male---female<br />

F Condense drain (ø 80)<br />

F Condense trap<br />

F St<strong>and</strong>---off bracket<br />

F Pre---piping frame<br />

F Natural gas to LPG conversion kit<br />

F LPG to natural gas conversion kit<br />

10 PACKAGING<br />

To unpack the boiler refer to the instructions on carton end<br />

flap.<br />

12<br />

Mini --- Installation & Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!