02.01.2015 Views

Designing Wells to Optimize Performance and Efficiency - ICWT

Designing Wells to Optimize Performance and Efficiency - ICWT

Designing Wells to Optimize Performance and Efficiency - ICWT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Preliminary Development<br />

• Preliminary development comprises those procedures<br />

performed by the drill rig immediately after casing, screen,<br />

<strong>and</strong> gravel installation.<br />

• These procedures include Swabbing <strong>and</strong> Circulating, Jetting,<br />

Wire-line Swabbing <strong>and</strong> bailing, <strong>and</strong> simultaneous Swabbing<br />

<strong>and</strong> Airlifting.<br />

• Chemical Development is included here.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!