Designing Wells to Optimize Performance and Efficiency - ICWT
Designing Wells to Optimize Performance and Efficiency - ICWT
Designing Wells to Optimize Performance and Efficiency - ICWT
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Specific Drawdown, s/Q (ft/GPM)<br />
Specific Drawdown, s/Q (ft/GPM)<br />
Specific Drawdown, s/Q (ft/GPM)<br />
Specific Drawdown, s/Q (ft/GPM)<br />
Well Development Type I - Under Developed<br />
0.16<br />
0.07<br />
• Five Types of well development<br />
0.14<br />
0.12<br />
0.1<br />
• Examples of Jurupa<br />
0.08<br />
0.06<br />
0.04<br />
• LACWD 40 4-68<br />
0.02<br />
Figure 6.6 Well Development Types<br />
0.06<br />
0.05<br />
0.04<br />
0.03<br />
0.02<br />
0.01<br />
Well Development Type II - Transitional<br />
0<br />
0 20 40 60 80 100 120 140 160 180 200<br />
Flow Rate, Q (GPM)<br />
Type I<br />
0<br />
0 20 40 60 80 100 120 140 160 180 200<br />
Flow Rate, Q (GPM)<br />
Type II<br />
Well Development Type III - Fully Developed<br />
0.1<br />
0.09<br />
0.08<br />
0.07<br />
0.06<br />
0.05<br />
0.04<br />
0.03<br />
0.02<br />
0.01<br />
0<br />
0 20 40 60 80 100 120 140 160 180 200<br />
Flow Rate, Q (GPM)<br />
0.25<br />
0.2<br />
0.15<br />
0.1<br />
0.05<br />
Well Development Type IV & V<br />
Fully Developed at Low Flow Rates - Transitional at High Flow Rates<br />
0<br />
0 20 40 60 80 100 120 140 160 180 200<br />
Flow Rate, Q (GPM)<br />
Type III<br />
TypeIV<br />
Type V