03.01.2015 Views

Final Environmental Impact Statement for the Chemistry and ...

Final Environmental Impact Statement for the Chemistry and ...

Final Environmental Impact Statement for the Chemistry and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Final</strong> EIS <strong>for</strong> <strong>the</strong> <strong>Chemistry</strong> <strong>and</strong> Metallurgy Research Building Replacement Project at Los Alamos National Laboratory<br />

š<br />

š<br />

š<br />

š<br />

Table 4–11 Emissions from <strong>the</strong> CMRR Facility under Alternative 1 ......................4-23<br />

Table 4–12 Annual Radiological <strong>Impact</strong>s on <strong>the</strong> Public from CMRR Operations under<br />

Alternative 1........................................................4-23<br />

Table 4–13 Annual Radiological <strong>Impact</strong>s to Workers from CMRR Facility Operations under<br />

Alternative 1........................................................4-24<br />

Table 4–14 Accident Frequency <strong>and</strong> Consequences under Alternatives 1 <strong>and</strong> 3 .............4-26<br />

Table 4–15 Annual Accident Risks under Alternatives 1 <strong>and</strong> 3 ..........................4-26<br />

Table 4–16 Selected Waste Generation Rates from CMR Operations <strong>and</strong> LANL Activities . . . 4-29<br />

Table 4–17 Site Infrastructure Requirements <strong>for</strong> Facility Construction under Alternative 2<br />

(Greenfield Alternative)...............................................4-33<br />

Table 4–18 Annual Site Infrastructure Requirements <strong>for</strong> Facility Operations<br />

under Alternative 2 (Greenfield Alternative) ...............................4-33<br />

Table 4–19 Nonradiological Air Quality Concentrations at <strong>the</strong> Site Boundary at TA-6<br />

(Alternative 2, Greenfield Alternative) – Construction .......................4-34<br />

Table 4–20 Nonradiological Air Quality Concentrations at <strong>the</strong> Site Boundary at TA-6<br />

(Alternative 2, Greenfield Alternative) – Operations ........................4-35<br />

Table 4–21 Emissions from <strong>the</strong> CMRR Facility under Alternative 2 ......................4-42<br />

Table 4–22 Annual Radiological <strong>Impact</strong>s on <strong>the</strong> Public from CMRR Facility Operations<br />

under Alternative 2 ...................................................4-43<br />

Table 4–23 Annual Radiological <strong>Impact</strong>s to Workers from CMRR Facility Operations<br />

under Alternative 2 (Greenfield Alternative) ...............................4-43<br />

Table 4–24 Accident Frequency <strong>and</strong> Consequences under Alternatives 2 <strong>and</strong> 4 .............4-45<br />

Table 4–25 Annual Accident Risks under Alternatives 2 <strong>and</strong> 4 ..........................4-45<br />

Table 4–26 Transportation Accident <strong>Impact</strong>s to <strong>the</strong> Maximally Exposed Individual<br />

Member of <strong>the</strong> Public.................................................4-70<br />

Table 4–27 Estimated Combined Infrastructure Requirements at LANL ...................4-77<br />

Table 4–28 Estimated Maximum Cumulative Air Quality Concentrations at <strong>the</strong> TA-55 Site<br />

Boundary (micrograms per cubic meter) ..................................4-79<br />

Table 4–29 Estimated Annual Cumulative Radioactive Waste Generated at LANL<br />

(cubic yards)........................................................4-80<br />

Chapter 5<br />

Table 5–1 Applicable DOE Orders <strong>and</strong> Directives...................................5-15<br />

Table 5–2 Applicable State of New Mexico Laws, Regulations, <strong>and</strong> Agreements ..........5-16<br />

Appendix A<br />

Table A–1 <strong>Impact</strong> Assessment Protocol <strong>for</strong> L<strong>and</strong> Resources ........................... A-2<br />

Table A–2 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Infrastructure ............................. A-3<br />

Table A–3 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Air Quality ............................... A-6<br />

Table A–4 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Noise ................................... A-8<br />

Table A–5 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Geology <strong>and</strong> Soils ......................... A-9<br />

Table A–6<br />

The Modified Mercalli Intensity Scale of 1931, with Generalized Correlations to<br />

Magnitude <strong>and</strong> Peak Ground Acceleration ............................... A-10<br />

Table A–7 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Water Use <strong>and</strong> Availability ................. A-12<br />

Table A–8 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Water Quality ............................ A-12<br />

Table A–9 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Ecological Resources ...................... A-15<br />

Table A–10 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Cultural <strong>and</strong> Paleontological Resources ....... A-16<br />

Table A–11 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Socioeconomics .......................... A-17<br />

Table A–12 <strong>Impact</strong> Assessment Protocol <strong>for</strong> Waste Management ....................... A-19<br />

Table A–13 Key Resources <strong>and</strong> Associated Regions of Influence ....................... A-20<br />

xviii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!