03.01.2015 Views

Final Environmental Impact Statement for the Chemistry and ...

Final Environmental Impact Statement for the Chemistry and ...

Final Environmental Impact Statement for the Chemistry and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Final</strong> EIS <strong>for</strong> <strong>the</strong> <strong>Chemistry</strong> <strong>and</strong> Metallurgy Research Building Replacement Project at Los Alamos National Laboratory<br />

š<br />

š<br />

š<br />

š<br />

š<br />

1.6.1.10 <strong>Environmental</strong> Assessment <strong>for</strong> <strong>the</strong> Proposed Future Disposition of<br />

Certain Cerro Gr<strong>and</strong>e Fire Flood <strong>and</strong> Sediment Retention Structures<br />

at Los Alamos National Laboratory, Los Alamos, New Mexico<br />

(DOE/EA-1408) ..............................................1-17<br />

1.6.1.11 <strong>Environmental</strong> Assessment <strong>for</strong> Proposed Access Control <strong>and</strong> Traffic<br />

Improvements at Los Alamos National Laboratory, Los Alamos,<br />

New Mexico (DOE/EA-1429) ...................................1-18<br />

1.6.1.12 <strong>Environmental</strong> Assessment <strong>for</strong> <strong>the</strong> Installation <strong>and</strong> Operation of<br />

Combustion Turbine Generators at Los Alamos National Laboratory,<br />

Los Alamos, New Mexico (DOE/EA-1430) ........................1-18<br />

1.6.1.13 <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong> <strong>for</strong> <strong>the</strong> Proposed Relocation of<br />

Technical Area 18 Capabilities <strong>and</strong> Materials at <strong>the</strong> Los Alamos<br />

National Laboratory (DOE/EIS-319) .............................1-19<br />

1.6.2 Ongoing NEPA Compliance Actions .....................................1-19<br />

1.6.2.1 Supplemental Programmatic <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong> on<br />

Stockpile Stewardship <strong>and</strong> Management <strong>for</strong> a Modern Pit Facility<br />

(DOE/EIS-0236-S2) ..........................................1-19<br />

1.6.2.2 <strong>Environmental</strong> Assessment <strong>for</strong> <strong>the</strong> Proposed Issuance of a Special<br />

Use Permit to <strong>the</strong> Incorporated County of Los Alamos <strong>for</strong> <strong>the</strong><br />

Development <strong>and</strong> Operation of a New Solid Waste L<strong>and</strong>fill at<br />

Los Alamos National Laboratory, Los Alamos, New Mexico<br />

(DOE/EA-1460) ..............................................1-21<br />

1.6.2.3 <strong>Environmental</strong> Assessment <strong>for</strong> Partial Conversion of an Existing TA-55<br />

Building into a Nondestructive Examination Facility at Los Alamos<br />

National Laboratory, Los Alamos, New Mexico (DOE/EA-1428) .......1-21<br />

1.6.3 Relationships to O<strong>the</strong>r LANL Projects ...................................1-21<br />

1.7 The Scoping Process .......................................................1-22<br />

1.8 Issues Raised During <strong>the</strong> Public Comment Period on <strong>the</strong> Draft EIS...................1-24<br />

1.9 Changes Since <strong>the</strong> Publication of <strong>the</strong> Draft EIS ..................................1-26<br />

2. PROJECT DESCRIPTION AND ALTERNATIVES .................................2-1<br />

2.1 Current <strong>and</strong> Future Support of Stockpile Stewardship ..............................2-1<br />

2.2 Description of <strong>the</strong> Existing CMR Building.......................................2-2<br />

2.2.1 Overview ...........................................................2-2<br />

2.2.2 Administrative Wing ..................................................2-4<br />

2.2.3 Laboratories .........................................................2-4<br />

2.2.4 Hot Cells (Wing 9) ....................................................2-4<br />

2.3 CMR Capabilities ..........................................................2-5<br />

2.3.1 AC <strong>and</strong> MC .........................................................2-5<br />

2.3.2 Destructive <strong>and</strong> Nondestructive Analysis ..................................2-5<br />

2.3.3 Actinide Research <strong>and</strong> Processing ........................................2-5<br />

2.3.4 Fabrication <strong>and</strong> Metallography ..........................................2-6<br />

2.4 Proposed CMRR Project Capabilities ...........................................2-6<br />

2.4.1 AC <strong>and</strong> MC Capabilities ...............................................2-6<br />

2.4.2 AC <strong>and</strong> MC Capabilities Consolidated from <strong>the</strong> Plutonium Facility<br />

into <strong>the</strong> CMRR Facility ................................................2-6<br />

2.4.3 SNM Storage Capability ...............................................2-6<br />

2.4.4 Large Containment Vessel H<strong>and</strong>ling Capability .............................2-7<br />

2.4.5 Mission Contingency Space .............................................2-7<br />

2.4.6 Nuclear Materials Operational Capabilities <strong>and</strong> Space <strong>for</strong> non-LANL Users .......2-7<br />

vi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!