03.01.2015 Views

Simulation with Arena

Simulation with Arena

Simulation with Arena

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Resource Failures<br />

• All units of a resource come down<br />

• Resource… button<br />

– Failure Name<br />

– Based on entity Count or elapsed Time<br />

– Preempt/Ignore/Wait for come-down rule<br />

– If based on Count, the Count for uptime<br />

If based on Time, the Uptime<br />

– Downtime (anything, distribution pull-down)<br />

• Can have multiple Failures (separate names) for a<br />

Resource<br />

<strong>Simulation</strong> <strong>with</strong> <strong>Arena</strong> — Chapter 5 — Modeling Basic Operations and Inputs 5 - 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!