U 15 - VAHLE, Inc
U 15 - VAHLE, Inc
U 15 - VAHLE, Inc
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
19 12<br />
QESTIONNAIRE FOR INSULATED CONDUCTOR SYSTEMS<br />
Fa.<br />
Date:<br />
Tel:<br />
Internet:<br />
Fax:<br />
e-mail:<br />
1. No. of conductor systems:<br />
2. Type of crane/machinery to be electrified:<br />
3. Voltage: Volts, ~/= Phases: c/s:<br />
(Three phase current)<br />
4. Length of conductor systems:<br />
5. Number of conductors: (power lines: control lines: neutral (ground): )<br />
6. Arrangement of conductors:<br />
Conductor rails suspending / Collectors standing<br />
Conductor rails resp. current collectors lateral<br />
Others:<br />
7. Number of cranes or machines electrified from the one system:<br />
8. Indoor: Outdoor:<br />
9. Special site conditions (humidity, dust, chemical effects etc.):<br />
10. Temperature conditions: °C min. °C max.<br />
11. Expansion gaps of building: pieces in max distance: mm<br />
12. Number and position of feeder points:<br />
13. Number and position of isolating sections (e.g. for maintenance areas):<br />
14. Mounting position envisaged:<br />
(prints and sketches should be submitted whenever obtainable)<br />
<strong>15</strong>. Travelling speed of machinery:<br />
16. Ampere load of each crane/machine:<br />
(Use table on page 50).<br />
17. Max. voltage drop from feeder point to current collectors 3% or % of voltage rating<br />
Other important data:<br />
Please submit prints or sketches for curved tracks, discontinuous.<br />
44