03.01.2015 Views

U 15 - VAHLE, Inc

U 15 - VAHLE, Inc

U 15 - VAHLE, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

19 12<br />

QESTIONNAIRE FOR INSULATED CONDUCTOR SYSTEMS<br />

Fa.<br />

Date:<br />

Tel:<br />

Internet:<br />

Fax:<br />

e-mail:<br />

1. No. of conductor systems:<br />

2. Type of crane/machinery to be electrified:<br />

3. Voltage: Volts, ~/= Phases: c/s:<br />

(Three phase current)<br />

4. Length of conductor systems:<br />

5. Number of conductors: (power lines: control lines: neutral (ground): )<br />

6. Arrangement of conductors:<br />

Conductor rails suspending / Collectors standing<br />

Conductor rails resp. current collectors lateral<br />

Others:<br />

7. Number of cranes or machines electrified from the one system:<br />

8. Indoor: Outdoor:<br />

9. Special site conditions (humidity, dust, chemical effects etc.):<br />

10. Temperature conditions: °C min. °C max.<br />

11. Expansion gaps of building: pieces in max distance: mm<br />

12. Number and position of feeder points:<br />

13. Number and position of isolating sections (e.g. for maintenance areas):<br />

14. Mounting position envisaged:<br />

(prints and sketches should be submitted whenever obtainable)<br />

<strong>15</strong>. Travelling speed of machinery:<br />

16. Ampere load of each crane/machine:<br />

(Use table on page 50).<br />

17. Max. voltage drop from feeder point to current collectors 3% or % of voltage rating<br />

Other important data:<br />

Please submit prints or sketches for curved tracks, discontinuous.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!