Mega Project Roles and Responsibilities Guidelines - Wisconsin.gov
Mega Project Roles and Responsibilities Guidelines - Wisconsin.gov
Mega Project Roles and Responsibilities Guidelines - Wisconsin.gov
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Team Members<br />
Program Environmental Engineer<br />
(PENV)<br />
Purpose & <strong>Responsibilities</strong><br />
Reports to the project managers <strong>and</strong> is responsible for providing<br />
environmental support. Specific duties of the PENV include the<br />
following:<br />
• Provide recommendations to the Corridor Team for all<br />
environmentally related issues.<br />
• Attend all preconstruction meetings.<br />
• Review of all Erosion Control Implementation Plans (ECIPs).<br />
• Review <strong>and</strong> coordinate all special requests related to<br />
environmental issues.<br />
• Conduct regular site visits to each active project to verify<br />
consistent application of environmental requirements.<br />
• Conduct weekly site visits for all environmentally medium or highrisk<br />
projects including any wetl<strong>and</strong> mitigation projects, stream<br />
relocations or other sensitive projects. The PENV <strong>and</strong> <strong>Project</strong><br />
Leader will combine efforts to report, through the Field Manager<br />
reporting system.<br />
• Perform regular coordination <strong>and</strong> liaison with BTS, <strong>Wisconsin</strong><br />
Department of Natural Resources (WDNR), Army Corps of<br />
Engineers (ACOE), Environmental Protection Agency (EPA) <strong>and</strong><br />
local agencies for all environmental program <strong>and</strong> policy issues.<br />
• Perform periodic reviews of each project including Erosion Control<br />
Diaries, Erosion Control Work Orders, verification that all materials<br />
conform to the Product Acceptability List (PAL) <strong>and</strong> installations<br />
are consistent with Best Management Practices (BMPs).<br />
• Participate in interim <strong>and</strong> final completion inspections of all<br />
projects for temporary <strong>and</strong> permanent erosion control measures.<br />
W:\publications\WEB\st<strong>and</strong>ards\mega\mg-project-roles-resp.docx3/26/2012<br />
12 | Page