06.01.2015 Views

EPD Fresh milk - The International EPD® System

EPD Fresh milk - The International EPD® System

EPD Fresh milk - The International EPD® System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Epd FOR “PIACERE LEGGERO” FRESH MILK IN PET BOTTLES<br />

Photochemical Oxidants<br />

Creation Potential (POCP)<br />

Downstream processes<br />

Core processes<br />

Upstream processes<br />

<strong>The</strong> potential to produce<br />

compounds that, in the<br />

presence of light, trigger an<br />

oxidation reaction that leads<br />

to the production of ozone in<br />

the troposphere. <strong>The</strong> POCP<br />

indicator concerns above<br />

all VOC (volatile organic<br />

compounds) and is expressed<br />

as an equivalent amount of<br />

ethylene (g C 2<br />

H 4<br />

).<br />

Phases subsequent to the main<br />

production process concerning<br />

the transport of the product<br />

to the point of sale/end<br />

user, the use of the product,<br />

the maintenance activities<br />

(defined in the instructions<br />

booklet, if provided) and<br />

the end of its life. For<br />

services (Core Process),<br />

no Downstream Processes<br />

are normally identified<br />

(e.g. waste management is<br />

already included in the Core<br />

Processes).<br />

Phases of the process<br />

directly associated with the<br />

construction/provision of the<br />

product/service concerned<br />

by the <strong>EPD</strong> (these phases<br />

include the transport of<br />

main components by the<br />

supplier to the production<br />

plant and the handling of the<br />

waste produced). Normally,<br />

the construction of the<br />

structures/infrastructure/<br />

plants/equipment and the staff<br />

activities associated with the<br />

product are not included 14 .<br />

Phases prior to the main<br />

process such as the extraction<br />

and processing of raw<br />

materials, the production of<br />

semifinished products and the<br />

transport of components/parts<br />

of products along the supply<br />

chain to the distribution points.<br />

14<br />

if a significant part of the total impact is associated with the construction of the production site/equipment (e.g.<br />

photovoltaic panels for the production of energy), the significant facility/infrastructure construction and disposal<br />

phases must be considered applying specific cut-off rules.<br />

13. glossary<br />

page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!