EPD Fresh milk - The International EPD® System
EPD Fresh milk - The International EPD® System
EPD Fresh milk - The International EPD® System
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Epd FOR “PIACERE LEGGERO” FRESH MILK IN PET BOTTLES<br />
Photochemical Oxidants<br />
Creation Potential (POCP)<br />
Downstream processes<br />
Core processes<br />
Upstream processes<br />
<strong>The</strong> potential to produce<br />
compounds that, in the<br />
presence of light, trigger an<br />
oxidation reaction that leads<br />
to the production of ozone in<br />
the troposphere. <strong>The</strong> POCP<br />
indicator concerns above<br />
all VOC (volatile organic<br />
compounds) and is expressed<br />
as an equivalent amount of<br />
ethylene (g C 2<br />
H 4<br />
).<br />
Phases subsequent to the main<br />
production process concerning<br />
the transport of the product<br />
to the point of sale/end<br />
user, the use of the product,<br />
the maintenance activities<br />
(defined in the instructions<br />
booklet, if provided) and<br />
the end of its life. For<br />
services (Core Process),<br />
no Downstream Processes<br />
are normally identified<br />
(e.g. waste management is<br />
already included in the Core<br />
Processes).<br />
Phases of the process<br />
directly associated with the<br />
construction/provision of the<br />
product/service concerned<br />
by the <strong>EPD</strong> (these phases<br />
include the transport of<br />
main components by the<br />
supplier to the production<br />
plant and the handling of the<br />
waste produced). Normally,<br />
the construction of the<br />
structures/infrastructure/<br />
plants/equipment and the staff<br />
activities associated with the<br />
product are not included 14 .<br />
Phases prior to the main<br />
process such as the extraction<br />
and processing of raw<br />
materials, the production of<br />
semifinished products and the<br />
transport of components/parts<br />
of products along the supply<br />
chain to the distribution points.<br />
14<br />
if a significant part of the total impact is associated with the construction of the production site/equipment (e.g.<br />
photovoltaic panels for the production of energy), the significant facility/infrastructure construction and disposal<br />
phases must be considered applying specific cut-off rules.<br />
13. glossary<br />
page 22