07.01.2015 Views

results of operations - Aboitiz

results of operations - Aboitiz

results of operations - Aboitiz

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DAVAO LIGHT AND POWER COMPANY<br />

Davao Light<br />

engineers check the<br />

giant mimic board<br />

inside the control<br />

center <strong>of</strong> the ERA<br />

substation. The<br />

board monitors the<br />

entire system to aid<br />

engineers to quickly<br />

respond to any<br />

power abnormalities.<br />

The automated<br />

system is linked<br />

to SCADA.<br />

POWER DISTRIBUTION<br />

36 ABOITIZ EQUITY VENTURES ANNUAL REPORT 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!