07.01.2015 Views

Technical and Regulatory Guidance for In Situ Chemical ... - ITRC

Technical and Regulatory Guidance for In Situ Chemical ... - ITRC

Technical and Regulatory Guidance for In Situ Chemical ... - ITRC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

thirty days after the discharger has filed a complete Report of Waste Discharge <strong>and</strong><br />

published the Notice of <strong>In</strong>tent. The Waste Discharge Requirements shall not be issued if<br />

the Executive Officer finds that there may be significant impacts to water quality, or finds<br />

that significant public controversy has arisen or will likely arise from the issuance of<br />

these requirements <strong>and</strong> that these requirements should be considered at a regularly<br />

scheduled Regional Water Board meeting.<br />

Example 3 – Florida<br />

EXHIBIT A<br />

Memor<strong>and</strong>um<br />

Proposed <strong>In</strong>jection Well(s) <strong>for</strong> <strong>In</strong> <strong>Situ</strong> Aquifer<br />

Remediation at a Hazardous Waste Remedial Action Site<br />

TO: Richard Deuerling, Mail Station 3530<br />

Division of Water Resource Management<br />

Bureau of Water Facilities Regulation<br />

Underground <strong>In</strong>jection Control Section<br />

FROM:<br />

DATE:<br />

SUBJ:<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

Proposed <strong>In</strong>jection Well(s) <strong>for</strong> <strong>In</strong> <strong>Situ</strong> Aquifer<br />

Remediation at a Hazardous Waste Remedial Action Site<br />

Pursuant to Rule 62-528.630(2)(c), F.A.C., inventory in<strong>for</strong>mation<br />

is hereby provided regarding the proposed construction of<br />

temporary injection well(s) <strong>for</strong> the purpose of in situ aquifer<br />

remediation at a hazardous waste contaminated site.<br />

Site name:_______________________________________<br />

Site address:____________________________________<br />

City/County:_____________________________________<br />

Latitude/Longitude:_____________________________<br />

FDEP Facility Number:___________________________<br />

Site owner’s name: ____________________________<br />

Site owner’s address:____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

Well contractor’s name: _______________(Note 1)<br />

Well contractor’s address:_______________________<br />

____________________________<br />

____________________________<br />

A4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!