The Minza Project<br />
- Development timeline: Target FID by year-end 2010<br />
<br />
<strong>FLEX</strong> has initiated a farm-out process to<br />
select a partner that will fund the required<br />
appraisal drilling programme<br />
Anita 2D Survey: “BOS Atlantic”<br />
<br />
Expect that 3-4 wells will be needed to reach<br />
P90 estimates of 1.2TCF of recoverable<br />
resources<br />
<br />
Water depth of 60-100 metres<br />
<br />
Anita 2D seismic study started 24 August<br />
and is expected to be interpreted by end-<br />
November<br />
<br />
Timeline:<br />
Data room:<br />
Established<br />
Target partner selection: Year-end <strong>2009</strong><br />
Target drilling: 2H 2010<br />
Target FID: Year-end 2010<br />