07.01.2015 Views

September 2009 - FLEX LNG

September 2009 - FLEX LNG

September 2009 - FLEX LNG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FLEX</strong> <strong>LNG</strong> – Unmatched Leader in Floating Liquefaction<br />

<br />

Fully negotiated and signed turnkey EPCIC contract where the world’s best yard<br />

takes new technology risk<br />

<br />

Financeable EPCIC contract and unmatched visibility of cost and schedule<br />

<br />

Access to the SPB <strong>LNG</strong> containment system – the industry’s preferred <strong>LNG</strong><br />

containment system<br />

<br />

<br />

The world’s only organisation that is dedicated to floating liquefaction<br />

<strong>FLEX</strong> <strong>LNG</strong>’s first mover advantage is today greater than it was 6-12 months ago<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!