(b) Licenses. Contractor and subcontractors are also required to hold<br />

current state business licenses in order to perform work in the state wherein fabrication shall be<br />

performed. Contractor’s license and business license numbers shall be inserted in the appropriate<br />

place on the proposal form. Evidence of subcontractors’ compliance with the above shall be<br />

submitted to <strong>AVEC</strong>’s Engineer (hereafter “Engineer”) before starting subcontract work.<br />

(c) Progress Reports. Prior to starting construction, the Contractor shall<br />

prepare and submit to the Engineer for review, a progress schedule showing approximately the dates<br />

on which each part or division of the work is expected to be started and finished. The progress<br />

schedule shall be brought up to date and submitted to the Engineer at the end of each month or at<br />

such other times the Engineer may request. The Contractor shall also forward to the Engineer at the<br />

end of each month an itemized report of the delivery status of major and critical items of purchased<br />

equipment and material, including shop drawings and the status of shop and field fabricated work.<br />

These progress reports shall indicate the date of the purchase order, the current percentage of<br />

completion, estimated delivery and the cause of any delay.<br />

(d) Remedial Plan. If the completion of any part of the work or the<br />

delivery of materials is behind the approved schedule, the Contractor shall submit in writing a plan<br />

acceptable to the Engineer for bringing the work up to schedule.<br />

2. Materials. Contractor will purchase all materials and Equipment (other than<br />

Owner-furnished materials) outright and not subject to any conditional sales agreements, bailment,<br />

lease, or other agreement reserving to the seller any interest therein. All materials incorporated into<br />

the project shall be in new, high-quality condition. Used or defective materials shall not be<br />

incorporated into the project. All Equipment furnished hereunder shall be subject to the inspection,<br />

tests, and approval of the Owner and the Contractor shall furnish all information required<br />

concerning the nature or source of any Equipment and provide adequate facilities for testing and<br />

inspecting the Equipment at the plant of the Contractor. The Equipment furnished hereunder shall<br />

become the property of the Owner upon delivery, provided, however, that the Owner, within one (1)<br />

year after delivery or within the period for which the Equipment is guaranteed, whichever is longer,<br />

may reject any Equipment which does not comply with the Specifications attached hereto and made<br />

a part hereof or with the guarantees, if any, of the Contractor. Upon any such rejection, the<br />

Contractor shall repair or replace such defective Equipment within a reasonable time after notice in<br />

writing from the Owner and in the event of failure by the Contractor so to do, the Owner may make<br />

such replacement and the cost and expense thereof shall be paid by and recoverable from the<br />

Contractor.<br />

3. Independent Contractor Status. Contractor is not a joint venturer or partner<br />

with Owner, and Contractor is providing services under this Contract as an independent contractor.<br />