08.01.2015 Views

PDF: 667 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 667 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 667 KB - Bureau of Infrastructure, Transport and Regional ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 4 | Methodological issues in ex-post evaluation<br />

Table 6 Predicted traffic using the Northam Bypass (2000)<br />

Link No. Bypass route Section length (km) AADT (2000) Speed limit (km/h)<br />

1 RED1 3.2 982 110<br />

2 RED1 0.1 1 016 110<br />

3 RED1 2.6 1 016 110<br />

4 RED1 2.5 1 011 110<br />

5 RED1 3.5 903 110<br />

6 RED1 3.3 903 110<br />

Total 15.2 972 110<br />

Source:<br />

Input data for RURAL3.<br />

Predicted traffic diverted from the townsite route<br />

Predicted traffic diverted from the townsite route is summarised in Table 7. Except<br />

for Section 4 <strong>of</strong> the bypass route <strong>and</strong> Section 16 <strong>of</strong> the townsite route, traffic data<br />

reported in Tables 6 <strong>and</strong> 7 are consistent.<br />

Table 7 Predicted traffic diverted from the townsite route (2000)<br />

Link No. Townsite route Section length (km) AADT (2000) Speed limit (km/h)<br />

(weighted average)<br />

1 H005 0.7 982 100<br />

2–9 H005 3.8 982 80<br />

10 H005 0.1 982 60<br />

11–15 H005 2.1 1 016 41<br />

16 H005 1.0 1 035 60<br />

17 H005 0.4 903 70<br />

18–20 H005 1.8 903 73<br />

21–33 H005 4.7 903 97<br />

Total 14.6 963 68<br />

Source:<br />

Input data for RURAL3.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!