10.01.2015 Views

DK-Fredericia: Electrical machinery, apparatus ... - Energinet.dk

DK-Fredericia: Electrical machinery, apparatus ... - Energinet.dk

DK-Fredericia: Electrical machinery, apparatus ... - Energinet.dk

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OJ/S S76<br />

18/04/2013<br />

128060-2013-EN<br />

Member states - Supply contract - Contract notice - Negotiated procedure 2/4<br />

II.1.6)<br />

II.1.7)<br />

II.1.8)<br />

II.1.9)<br />

II.2)<br />

II.2.1)<br />

II.2.2)<br />

II.2.3)<br />

II.3)<br />

<strong>Energinet</strong>.<strong>dk</strong> wishes to purchase one 150 kV, 50 Mvar shunt reactor to be delivered to the substation Herning<br />

with an optional additional unit to be delivered to the substation Landerupgård.<br />

Common procurement vocabulary (CPV)<br />

31000000, 31100000<br />

Information about Government Procurement Agreement (GPA)<br />

Information about lots<br />

This contract is divided into lots: no<br />

Information about variants<br />

Variants will be accepted: no<br />

Quantity or scope of the contract<br />

Total quantity or scope:<br />

Information about options<br />

Options: yes<br />

Description of these options: One optional shunt reactor identical to the first unit<br />

Information about renewals<br />

This contract is subject to renewal: no<br />

Duration of the contract or time limit for completion<br />

Starting 31.5.2013 Completion 31.12.2014<br />

Section III: Legal, economic, financial and technical information<br />

III.1) Conditions relating to the contract<br />

III.1.1)<br />

III.1.2)<br />

III.1.3)<br />

III.1.4)<br />

III.2)<br />

III.2.1)<br />

Deposits and guarantees required:<br />

Will appear from the tender material<br />

Main financing conditions and payment arrangements and/or reference to the relevant provisions<br />

governing them:<br />

Will appear from the tender material<br />

Legal form to be taken by the group of economic operators to whom the contract is to be awarded:<br />

Will appear from the tender material<br />

Other particular conditions:<br />

The performance of the contract is subject to particular conditions: no<br />

Conditions for participation<br />

Personal situation of economic operators, including requirements relating to enrolment on professional<br />

or trade registers<br />

Information and formalities necessary for evaluating if the requirements are met: Information about the<br />

supplier's/contractor's/service provider's own situation and the information and formalities required to assess<br />

whether he has the required minimum capacity (financially and technically). The answers in respect of the<br />

information outlined below must be provided specifically and unequivocally for each individual enterprise. If<br />

suppliers have joined forces (i.e. joint ventures, consortia etc.), the information must be provided for each<br />

individual service provider. Please observe that it is the legal entity which obtains prequalification that has to<br />

sign the Contract with <strong>Energinet</strong>.<strong>dk</strong> and thus is fully responsible towards <strong>Energinet</strong>.<strong>dk</strong> regarding fulfilment of the<br />

Contract.<br />

Legal situation - documentation required:<br />

18/04/2013 S76<br />

http://ted.europa.eu/TED<br />

Member states - Supply contract - Contract notice - Negotiated procedure<br />

Supplement to the Official Journal of the European Union<br />

2/4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!