6 Dismantling Sequence Of Works<br />

The following is a suggested sequence of how to dismantle the hangar. The contractor<br />

should provide a method statement for his preferred sequence of works.<br />

1. Service strip of all internal and external mechanical and electrical services<br />

and main hangar doors.<br />

2. Removal of all roof and ceiling cladding (excluding purlins).<br />

3. Demolition of all masonry, including internal and end walls<br />

4. Removal of main frames, bracing and purlins down to approximately 3m<br />

high. The frames are to be dismantled in sections from the top down, while<br />

supporting the lower sections of the frame with temporary works. The<br />

frames should be removed from the rear of the building first as these have<br />

the most corrosion and are therefore the weakest frames. The temporary<br />

stability of the building should be maintained with temporary works to allow<br />

the bracing and purlins to be removed.<br />

5. Removal of screed finishes encasing steel frame to sides of hangar to allow<br />

frames to be removed.<br />

6. Removal of the final part of the steel frame (excluding angles which are cast<br />

into the foundations).<br />

7. Angles protruding from the slab to be cut off and ground down to slab level.<br />