METROPOLITAN MINE LONGWALLS <strong>20</strong>-<strong>22</strong><br />

EXTRACTION PLAN<br />

METROPOLITAN COAL


METROPOLITAN COAL<br />

METROPOLITAN MINE<br />

LONGWALLS <strong>20</strong>-<strong>22</strong><br />

EXTRACTION PLAN<br />

Revision Status Register<br />

Section/Page/<br />

Annexure<br />

Revision<br />

Number<br />

Amendment/Addition Distribution DoP Approval<br />

Date<br />

All EP-R01-A Original DoP 14 May <strong>20</strong>10<br />

April <strong>20</strong>10


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

TABLE OF CONTENTS<br />

Section<br />

Page<br />

1 INTRODUCTION 1<br />

2 PURPOSE AND SCOPE 1<br />

3 EXTRACTION PLAN REVIEW AND UPDATE 5<br />

3.1 DISTRIBUTION REGISTER 7<br />

4 STRUCTURE OF THE EXTRACTION PLAN 7<br />

LIST OF FIGURES<br />

Figure 1<br />

Figure 2<br />

Figure 3<br />

Figure 4<br />

Project General Arrangement<br />

<strong>Longwalls</strong> <strong>20</strong>-<strong>22</strong> Layout<br />

Aerial Photograph of the <strong>Longwalls</strong> <strong>20</strong>-<strong>22</strong> Layout<br />

Environmental Management Structure<br />

LIST OF ATTACHMENTS<br />

Attachment 1<br />

Attachment 2<br />

Attachment 3<br />

Attachment 4<br />

Attachment 5<br />

Attachment 6<br />

Attachment 7<br />

Subsidence Monitoring Program (Including a Coal Resource Recovery <strong>Plan</strong>, Detailed<br />

<strong>Plan</strong> of Second Workings and Revised Subsidence Predictions)<br />

Water Management <strong>Plan</strong><br />

Biodiversity Management <strong>Plan</strong><br />

Land Management <strong>Plan</strong><br />

Heritage Management <strong>Plan</strong><br />

Built Features Management <strong>Plan</strong><br />

Public Safety Management <strong>Plan</strong><br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

Page i


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

1 INTRODUCTION<br />

The <strong>Metropolitan</strong> <strong>Mine</strong> is owned and operated by Helensburgh Coal Pty Ltd (HCPL), a wholly owned<br />

subsidiary of <strong>Peabody</strong> <strong>Energy</strong> Australia Pty Ltd. HCPL was granted approval for the <strong>Metropolitan</strong> Coal<br />

Project (the Project) under Section 75J of the New South Wales (NSW) Environmental <strong>Plan</strong>ning and<br />

Assessment Act, 1979 (EP&A Act) on <strong>22</strong> June <strong>20</strong>09 (the Approval). A copy of the Project Approval is<br />

available on the <strong>Peabody</strong> website (http://www.peabodyenergy.com.au).<br />

The Project comprises the continuation, upgrade and extension of underground coal mining operations<br />

and surface facilities at the existing <strong>Metropolitan</strong> <strong>Mine</strong>. The Approved underground mining Project<br />

layout is shown on Figure 1. <strong>Longwalls</strong> <strong>20</strong>, 21, <strong>22</strong>A and <strong>22</strong>B (herein referred to as <strong>Longwalls</strong> <strong>20</strong>-<strong>22</strong>)<br />

define the first secondary extraction mining sub-domain within the Approved Project underground<br />

mining area (Figures 2 and 3).<br />

2 PURPOSE AND SCOPE<br />

This <strong>Extraction</strong> <strong>Plan</strong> has been prepared for the Project in accordance with Condition 6 of Schedule 3 of<br />

the Project Approval. The Condition states:<br />

SECOND WORKINGS<br />

<strong>Extraction</strong> <strong>Plan</strong><br />

6. The Proponent shall prepare and implement an <strong>Extraction</strong> <strong>Plan</strong> for all second workings in the<br />

mining area to the satisfaction of the Director-General. This plan must:<br />

(a) be prepared by a team of suitably qualified and experienced experts whose appointment<br />

has been endorsed by the Director-General;<br />

(b) be approved by the Director-General before the Proponent is allowed to carry out the<br />

second workings covered by the <strong>Extraction</strong> <strong>Plan</strong>;<br />

(c) include a detailed plan for the second workings, which has been prepared to the<br />

satisfaction of DPI, and provides for adaptive management (from Longwall 23 onwards);<br />

(d) include detailed plans of any associated surface construction works;<br />

(e) include the following to the satisfaction of DPI:<br />

• a coal resource recovery plan that demonstrates effective recovery of the available<br />

resource;<br />

• revised predictions of the conventional and non-conventional subsidence effects and<br />

subsidence impacts of the extraction plan, incorporating any relevant information that<br />

has been obtained since this approval; and<br />

• a Subsidence Monitoring Program to:<br />

- validate the subsidence predictions; and<br />

- analyse the relationship between the subsidence effects and subsidence impacts<br />

of the <strong>Extraction</strong> <strong>Plan</strong> and any ensuing environmental consequences;<br />

(f) include a:<br />

• Water Management <strong>Plan</strong>, which has been prepared in consultation with DECC, SCA<br />

and DWE, to manage the environmental consequences of the <strong>Extraction</strong> <strong>Plan</strong> on<br />

watercourses (including the Woronora Reservoir), aquifers and catchment yield;<br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

Revision No. EP-R01-A Page 1<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

• Biodiversity Management <strong>Plan</strong>, which has been prepared in consultation with DECC<br />

and DPI (Fisheries), to manage the potential environmental consequences of the<br />

<strong>Extraction</strong> <strong>Plan</strong> on aquatic and terrestrial flora and fauna, with a specific focus on<br />

swamps;<br />

• Land Management <strong>Plan</strong>, which has been prepared in consultation with SCA, to<br />

manage the potential environmental consequences of the <strong>Extraction</strong> <strong>Plan</strong> on cliffs,<br />

overhangs, steep slopes and land in general;<br />

• Heritage Management <strong>Plan</strong>, which has been prepared in consultation with DECC and<br />

the relevant Aboriginal groups, to manage the potential environmental consequences<br />

of the <strong>Extraction</strong> <strong>Plan</strong> on heritage sites or values;<br />

• Built Features Management <strong>Plan</strong>, which has been prepared in consultation with the<br />

owner of the relevant feature , to manage the potential environmental consequences<br />

of the <strong>Extraction</strong> <strong>Plan</strong> on any built features; and<br />

(g) include a Public Safety Management <strong>Plan</strong>, which has been prepared in consultation with<br />

DPI and the DSC (for any mining within the DSC notification area), to ensure public<br />

safety in the mining area.<br />

Note: In accordance with condition 12 of schedule 2, the preparation and implementation of <strong>Extraction</strong> <strong>Plan</strong>s for<br />

second workings may be staged, with each plan covering a defined area of second workings. In addition, these<br />

plans are only required to contain management plans that are relevant to the specific second workings that are<br />

being carried out.<br />

The relationship of this <strong>Extraction</strong> <strong>Plan</strong> to the <strong>Metropolitan</strong> <strong>Mine</strong> Environmental Management Structure<br />

is shown on Figure 4.<br />

This <strong>Extraction</strong> <strong>Plan</strong> has been prepared by HCPL, with assistance from <strong>Mine</strong> Subsidence Engineering<br />

Consultants, Gilbert and Associates, Heritage Computing, Cenwest Environmental Services,<br />

FloraSearch, Bio-Analysis and Kayandel Archaeological Services. The appointment of the team of<br />

suitably qualified and experienced experts was endorsed by the Director-General on 23 September<br />

<strong>20</strong>09.<br />

3 EXTRACTION PLAN REVIEW AND UPDATE<br />

In accordance with Condition 4, Schedule 7 of the Project Approval, strategies, plans and programs<br />

included in this <strong>Extraction</strong> <strong>Plan</strong> will be reviewed within three months of:<br />

• the submission of an audit under Condition 8 of Schedule 7;<br />

• the submission of an incident report under Condition 6 of Schedule 7;<br />

• the submission of an annual review under Condition 3 of Schedule 7; and<br />

if necessary, revised to the satisfaction of the Director-General of the NSW Department of <strong>Plan</strong>ning<br />

(DoP).<br />

The <strong>Extraction</strong> <strong>Plan</strong> will also be reviewed within three months of approval of any Project modification<br />

and if necessary, revised to the satisfaction of the DoP.<br />

The revision status of this <strong>Extraction</strong> <strong>Plan</strong> is indicated on the title page of each copy. The distribution<br />

register for controlled copies of the <strong>Extraction</strong> <strong>Plan</strong> is described in Section 3.1.<br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

Revision No. EP-R01-A Page 5<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong>


Project Conditions of Approval<br />

Part 3A Approval<br />

Strategic Framework for<br />

Environmental Management<br />

Environmental Management Strategy<br />

Environmental Management <strong>Plan</strong>s and<br />

Monitoring Programs<br />

Mining Area and Surrounds<br />

Surface Facilities Area<br />

Catchment<br />

Monitoring Program<br />

<strong>Extraction</strong> <strong>Plan</strong><br />

Subsidence<br />

Monitoring Program<br />

Water Management <strong>Plan</strong><br />

Biodiversity<br />

Management <strong>Plan</strong><br />

Land Management <strong>Plan</strong><br />

Noise<br />

Management <strong>Plan</strong><br />

Air Quality and<br />

Greenhouse Gas<br />

Management <strong>Plan</strong><br />

Surface Facilities<br />

Water<br />

Management <strong>Plan</strong><br />

Research Program<br />

Construction<br />

Management <strong>Plan</strong><br />

Heritage Management <strong>Plan</strong><br />

Built Features<br />

Management <strong>Plan</strong><br />

Public Safety<br />

Management <strong>Plan</strong><br />

Traffic<br />

Management <strong>Plan</strong><br />

Waste<br />

Management <strong>Plan</strong><br />

Rehabilitation<br />

Strategy<br />

Rehabilitation<br />

Management <strong>Plan</strong><br />

M E T R O P O L I T A N M I N E<br />

FIGURE 4<br />

Environmental Management<br />

Structure<br />

METROPOLITAN COAL<br />

MET-08-AD7 EP_002A


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

3.1 DISTRIBUTION REGISTER<br />

In accordance with Condition 10, Schedule 7 ‘Access to Information’, HCPL will make the <strong>Extraction</strong><br />

<strong>Plan</strong> publicly available on the <strong>Peabody</strong> website. A hard copy of the <strong>Extraction</strong> <strong>Plan</strong> will also be<br />

maintained at the <strong>Metropolitan</strong> <strong>Mine</strong> Site.<br />

HCPL recognises that various regulators have different distribution requirements, both in relation to<br />

whom documents should be sent and in what format. An Environmental Management <strong>Plan</strong> and<br />

Monitoring Program Distribution Register will be established in consultation with the relevant agencies<br />

and infrastructure owners that indicates:<br />

• to whom the <strong>Metropolitan</strong> <strong>Mine</strong> plans and programs will be distributed;<br />

• the format (i.e. electronic or hard copy) of distribution; and<br />

• the format of revision notification.<br />

HCPL will make the Distribution Register publicly available on the <strong>Peabody</strong> website.<br />

HCPL is responsible for maintaining the Distribution Register and for ensuring that the notification of<br />

revisions is sent by email or post as appropriate.<br />

In addition, HCPL employees with local computer network access will be able to view the controlled<br />

electronic version of this <strong>Extraction</strong> <strong>Plan</strong> on the HCPL local area network. HCPL will not be<br />

responsible for maintaining uncontrolled copies beyond ensuring the most recent version is maintained<br />

on HCPL’s computer system and the <strong>Peabody</strong> website.<br />

4 STRUCTURE OF THE EXTRACTION PLAN<br />

The remainder of this <strong>Extraction</strong> <strong>Plan</strong> is structured as follows:<br />

Attachment 1: Provides a Subsidence Monitoring Program to validate subsidence predictions and<br />

analyse the relationship between the subsidence effects and subsidence impacts of<br />

the <strong>Extraction</strong> <strong>Plan</strong> and any ensuing environmental consequences.<br />

A Coal Resource Recovery <strong>Plan</strong>, including a detailed plan for the second workings is<br />

provided in Appendix 1 of the Subsidence Monitoring Program.<br />

Revised predictions of the conventional and non-conventional subsidence effects and<br />

subsidence impacts of the <strong>Extraction</strong> <strong>Plan</strong> are provided in Appendix 2 of the<br />

Subsidence Monitoring Program.<br />

Attachment 2: Provides a Water Management <strong>Plan</strong> to manage potential environmental<br />

consequences on watercourses (including the Woronora Reservoir), aquifers and<br />

catchment yield.<br />

Attachment 3: Provides a Biodiversity Management <strong>Plan</strong> to manage potential environmental<br />

consequences on aquatic and terrestrial flora and fauna, with a specific focus on<br />

swamps.<br />

Attachment 4: Provides a Land Management <strong>Plan</strong> to manage potential environmental consequences<br />

on cliffs, overhangs, steep slopes and land in general.<br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

Revision No. EP-R01-A Page 7<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

Attachment 5: Provides a Heritage Management <strong>Plan</strong> to manage potential environmental<br />

consequences on heritage sites or values.<br />

Attachment 6: Provides a Built Features Management <strong>Plan</strong> to manage potential environmental<br />

consequences on built features.<br />

Attachment 7: Provides a Public Safety Management <strong>Plan</strong> to ensure public safety in the mining area.<br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

Revision No. EP-R01-A Page 8<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 1<br />

SUBSIDENCE MONITORING PROGRAM<br />

(INCLUDING COAL RESOURCE RECOVERY PLAN, DETAILED PLAN OF<br />

SECOND WORKINGS AND REVISED SUBSIDENCE PREDICTIONS)<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 2<br />

WATER MANAGEMENT PLAN<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 3<br />

BIODIVERSITY MANAGEMENT PLAN<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 4<br />

LAND MANAGEMENT PLAN<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 5<br />

HERITAGE MANAGEMENT PLAN<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 6<br />

BUILT FEATURES MANAGEMENT PLAN<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

A Built Features Management <strong>Plan</strong> has been prepared in consultation with the following infrastructure<br />

owners:<br />

• Integral <strong>Energy</strong> - sign-off received from asset owner<br />

• Nextgen<br />

• TransGrid - sign-off received from asset owner<br />

• Optus - sign-off received from asset owner<br />

• Telstra - sign-off received from asset owner<br />

• Roads and Traffic Authority - sign-off received from asset owner<br />

• RailCorp - sign-off received from asset owner<br />

• Sydney Water - sign-off from asset owner imminent<br />

• Wollongong City Council - sign-off received from asset owner<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>


<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong><br />

ATTACHMENT 7<br />

PUBLIC SAFETY MANAGEMENT PLAN<br />

Revision No. EP-R01-A<br />

Document ID: <strong>Extraction</strong> <strong>Plan</strong><br />

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Extraction</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!